100% found this document useful (2 votes)
2K views25 pages

Gilbert Method Pressure Curves Analysis

The document contains 23 figures showing pressure distribution curves generated using the Gilbert method for different tubing and flowline diameters and flow rates. The figures show the pressure drop in pounds per square inch along the vertical length of the tubing or horizontal length of the flowline for various well production scenarios. This allows analysis of lift performance in vertical wells and flow in horizontal flowlines.

Uploaded by

Sayaf Salman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views25 pages

Gilbert Method Pressure Curves Analysis

The document contains 23 figures showing pressure distribution curves generated using the Gilbert method for different tubing and flowline diameters and flow rates. The figures show the pressure drop in pounds per square inch along the vertical length of the tubing or horizontal length of the flowline for various well production scenarios. This allows analysis of lift performance in vertical wells and flow in horizontal flowlines.

Uploaded by

Sayaf Salman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Pressure Distribution for 2.875-inch Tubing at 50 bbl/day: Displays the pressure-distribution curves for 2.875-inch tubing size operating at 50 barrels per day.
  • Pressure Distribution for 2.875-inch Tubing at 100 bbl/day: Illustrates pressure-distribution curves for 2.875-inch tubing with a flow rate of 100 barrels per day.
  • Pressure Distribution for 2.875-inch Tubing at 200 bbl/day: Shows pressure-distribution data for 2.875-inch tubing at 200 barrels per day.
  • Pressure Distribution for 2.875-inch Tubing at 400 bbl/day: Presents pressure-distribution results for 2.875-inch tubing at 400 barrels per day.
  • Pressure Distribution for 2.875-inch Tubing at 600 bbl/day: Depicts pressure-distribution curves for 2.875-inch tubing at 600 barrels per day.
  • Pressure Distribution for 1.66-inch Tubing: Analyzes pressure-distribution for 1.66-inch tubing with different flow rates.
  • Pressure Distribution for 1.9-inch Tubing: Compiles pressure-distribution curves for 1.9-inch tubing applications.
  • Pressure Distribution for 2.375-inch Tubing: Includes data figures for 2.375-inch tubing at varying flow rates.
  • Pressure Distribution for 3.5-inch Tubing: Evaluates pressure-distribution for 3.5-inch tubing across multiple flow conditions.
  • Pressure Distribution for 3.0-inch Tubing: Focuses on pressure profiles in 3.0-inch tubing across several scenarios.
  • Pressure Distribution for 4.0-inch Tubing: Examines the pressure-distribution curves specific to 4.0-inch tubing environments.
  • Horizontal Flowline Performance for 2.5-inch Flowline: Reports on pressure-distribution for 2.5-inch flowlines.
  • Horizontal Flowline Performance for 2.0-inch Flowline: Describes pressure curves for horizontal flowline at 2.0-inch diameter.
  • Horizontal Flowline Performance for 3.0-inch Flowline: Illustrates findings for horizontal pressure distribution in 3.0-inch flowlines.

Petroleum Production Engineering II

Fourth Stage
Vertical Lift Performance - Gilbert Method

Figure (1), Pressure-distribution curves for 2⅞-in, tubing at 50 bbl/day.


Figure (2), Pressure-distribution curves for 2⅞-in, tubing at 100 bbl/day.

Page | 1 SORAN UNIVERSITY


Figure (5), Pressure-distribution curves for 2⅞-in, tubing at 600 bbl/day.

Figure (3), Pressure-distribution curves for 2⅞-in, tubing at 200 bbl/day.

Page | 2 SORAN UNIVERSITY


Figure (4), Pressure-distribution curves for 2⅞-in, tubing at 400 bbl/day.

Page | 3 SORAN UNIVERSITY


Figure (5), Pressure-distribution curves for 2⅞-in, tubing at 600 bbl/day.

Page | 4 SORAN UNIVERSITY


Figure (6), Pressure-distribution curves for 1.66-in, tubing at 50 and 200 bbl/day.

Page | 5 SORAN UNIVERSITY


Figure (7), Pressure-distribution curves for 1.66-in, tubing at 100 and 400 bbl/day.

Page | 6 SORAN UNIVERSITY


Figure (8), Pressure-distribution curves for 1.9-in, tubing at 50 and 200 bbl/day.

Page | 7 SORAN UNIVERSITY


Figure (9), Pressure-distribution curves for 1.9-in, tubing at 100 and 400 bbl/day.

Page | 8 SORAN UNIVERSITY


Figure (10), Pressure-distribution curves for 1.9-in, tubing at 600 bbl/day. And
for 2⅜-in, tubing at 100 bbl/day.

Page | 9 SORAN UNIVERSITY


Figure (11), Pressure-distribution curves for 2⅜-in, tubing at 50 and 200 bbl/day.

Page | 10 SORAN UNIVERSITY


Figure (12), Pressure-distribution curves for 2⅜-in, tubing at 400 bbl/day. And
for 3.5-in, tubing at 50 bbl/day.

Page | 11 SORAN UNIVERSITY


Figure (13), Pressure-distribution curves for 2⅜-in, tubing at 600 bbl/day. And
for 3.5-in, tubing at 100 bbl/day.

Page | 12 SORAN UNIVERSITY


Figure (14), Pressure-distribution curves for 3.5-in, tubing at 200 and 400 bbl/day.

Page | 13 SORAN UNIVERSITY


Figure (15), Pressure-distribution curves for 3.5-in, tubing at 600 bbl/day.

Page | 14 SORAN UNIVERSITY


Figure (16), Pressure-distribution curves for 3.0-in, tubing at 1000 bbl/day.

Page | 15 SORAN UNIVERSITY


Figure (17), Pressure-distribution curves for 3.0-in, tubing at 2000 bbl/day.

Page | 16 SORAN UNIVERSITY


Figure (18), Pressure-distribution curves for 3.0-in, tubing at 3000 bbl/day.

Page | 17 SORAN UNIVERSITY


Figure (19), Pressure-distribution curves for 4.0-in, tubing at 1000 bbl/day.

Page | 18 SORAN UNIVERSITY


Figure (19), Pressure-distribution curves for 4.0-in, tubing at 2000 bbl/day.

Page | 19 SORAN UNIVERSITY


Figure (19), Pressure-distribution curves for 4.0-in, tubing at 3000 bbl/day.

Page | 20 SORAN UNIVERSITY


Petroleum Production Engineering II
Fourth Stage
Horizontal Flowline Performance - Gilbert Method

Figure (20), Pressure-distribution curves for 2.0-in, flowline at 1000 bbl/day.

Page | 21 SORAN UNIVERSITY


Figure (21), Pressure-distribution curves for 2.5-in, flowline at 1000 bbl/day.

Page | 22 SORAN UNIVERSITY


Figure (22), Pressure-distribution curves for 3.0-in, flowline at 1000 bbl/day.

Page | 23 SORAN UNIVERSITY


Figure (23), Pressure-distribution curves for 4.0-in, flowline at 1000 bbl/day.

Page | 24 SORAN UNIVERSITY

You might also like