Professional Documents
Culture Documents
Sub-Structure
Super-Structure
Misc.
Filter Media Behind Abutment & Return
Behind Abutment 2 15 0.6 6.55 117.900
Behind Return Wall 4 9.9 0.6 6.55 155.628
Stone Pitching 4 188.6468 0.3 226.376
Filter Materail below Pitching 4 188.6468 0.15 113.188
Weep Hole
In Abutment Rmt. 2 1.069 56 119.752
In Return Rmt. 4 1.069 44 188.182
Toe Wall
Excavation Cum 4 16.49336 1.4 1.5 138.544
PCC Cum 4 16.49336 1.4 0.1 9.236
Raft Cum 4 16.49336 1.2 0.4 31.667
Wall Cum 4 16.49336 0.51 Area 33.646
Drainage Spout Nos. 2 13 26.000
Painting of Structure Rm 2 60 120.000
Initial Load Test Tonne 2
Lateral Load Test Tonne
Testing on Span Tonne 5
HT
FRL 100
GL 93
FDN 89.5
WC 0.075
Slb+Grdr 1
Bearing 0.12
Pedestal 0.5
Abt. CAP 1
FDN Rft 1.6
Pier CAP 1.5
Abt. Wall HT. 6.205
Pier Shaft HT. 4.305
Return Wall 8.85
Sub-Structure
Super-Structure
Misc.
Filter Media Behind Abutment & Return
Behind Abutment 2 32 0.6 3.55 136.320
Behind Return Wall 4 5.4 0.6 3.55 46.008
Stone Pitching 4 70.13311 0.3 84.160
Filter Materail below Pitching 4 70.13311 0.15 42.080
Weep Hole
In Abutment Rmt. 2 0.900 30 54.000
In Return Rmt. 4 0.900 6 21.600
Toe Wall
Excavation Cum 4 9.424778 1.4 1.5 79.168
PCC Cum 4 9.424778 1.4 0.1 5.278
Raft Cum 4 9.424778 1.2 0.4 18.096
Wall Cum 4 9.424778 0.51 Area 19.227
Drainage Spout Nos. 2 8.2 16.400
Painting of Structure Rm 2 36 72.000
Initial Load Test Tonne 2
Lateral Load Test Tonne
Testing on Span Tonne 6
HT
FRL 100
GL 96
FDN 92.5
WC 0.075
Slb+Grdr 1
Bearing 0.12
Pedestal 0.5
Abt. CAP 1
FDN Rft 1.2
Pier CAP 1.5
Abt. Wall HT. 3.605
Pier Shaft HT. 1.305
Return Wall 6.25