You are on page 1of 1

ANNEXE - PDF Generated on 09-Jan-2013 11:48AM

V2 09-JAN-13 VALID FOR CONSTRUCTION REVISED AS INDICATED Tau Oos Grh Wih
V1 09-OCT-12 VALID FOR CONSTRUCTION Wsy Oos Grh Wih

Revision
Prepared Engineering Approved Approved
Date Description of revision by checked by by
(dd-MMM-yy)
by LE EPM

Engineering Subcontractor to: © Copyright SBM Offshore N.V. 2012


SINGLE BUOY MOORINGS INC. Copyright by SBM Offshore N.V. or any of its subsidiaries.
P.O. Box 152 This document is the property of SBM Offshore N.V. or any
5, route de Fribourg of its subsidiaries. This document or any part thereof is
CH-1723 Marly
CONFIDENTIAL and may not be made known, copied,
Switzerland
Tel +41 26 439 99 20 multiplied, or used in any other way without the permission
www.sbmoffshore.com Fax +41 26 439 99 39 of SBM Offshore N.V. or any of its subsidiaries.

PETROBRAS NETHERLANDS BV
FPSO CIDADE DE ILHABELA
TOPSIDES
DRAINBOX
TYPICAL DETAILS
A1 1:5 006 V2
Printed at: 09-Jan-2013 11:25 By kees.tau O:\eDMS (CL-99)\HI39520\STD\Drawings\Drains\PEDWSTTS004001-006V2.dwg

You might also like