HOUSE OF CONSULTING OFFICE

Drawing Transmittal Sheet


Operation & Maintenance Building

Project Name Film Crew Lodge Phase 2 & 3 Client Royal Commission for Al-Ula
Project No. PR6870 Contractor Red Sea International (RSI)
Location Al-Ula

MP2MGDMMD1004-RSH-
Submittal No. XX-RB-000-DG-AR- New Submittal Date 31-May-23
070002
Rev. No. 04 Re-Submittal Previous Submittal\Rev. No.
Discipline

Architectural Civil Electrical Telecom Structural

Firefighting HVAC Interior Design Plumbing Mechnaical


Please find enclosed the following Documents/Drawing:
S\N Drawing No. Rev No. Description\Title Code
MP2MGDMMD1004-RSH-XX-RB-000-DG- Operation and Maintenance Building - Floor Plan
1 04
AR-070002 Layout

Submitted for

Approval Further Action Filing For Information Other

Comments

Approval Status (Code)

A Approved B C
Approved as Noted Approved as Noted
Resubmittal is Not Required Resubmittal is Required

D Disapproved N No Action

Bushra AlGhamdi Checked\


Submitted By
(Red Sea International) Approved By
Date 31-May-23 Date
FORM: F-OP-22 REV: 8 DATE: 16-09-2020 OCCUPANCY CLASSIFICATION GROUP-B

Glass wall with frosted


B OCCUPANT LOAD 88
A102 A105
sticker in the center for TYPE OF CONSTRUCTION II-B
visual privacy (from 70 BUILDING PROFILE
cm to 150 cm from FFL)
Grey tinted glass (same as
VIP unit) and not clear glass.

LEGENDS / NOTE(S):

8A
2C
9A
1C

6A
Add the corridor space to the 5A
IT Manager room and
provide entrance from
Hallway.
3C
1E

7A
GENERAL MEP FOR LAUNDRY
CONNECTED TO LOADING/UNLOADING DOCK

2A
1A
3A 11A
Laundry - lint/fluff trap after the dryer /
before the extract fan.
4A
C 15A 16A 10A
D
A102 A105 A102 A105 Lint/fluff catcher/ arrestor pit with screen -
ROYAL COMMISSION FOR
Laundry drain line.
CLIENT
ALULA

HOUSE OF CONSULTING
OFFICE
Steam generatorATKINS
for pressers.
CONSULTANT
26D 1B
6D 5D 21D
2D 1D 17D
16D
4D 4B APPROVED FOR SUBMISSION TO CLIENT
Chemical dosing for all washer/Extractor
3D 25D
14A
3B D
CONTRACTS: A
18D
14D 12A T
WASHER ENGINEERING:
10D
Separate CLIENT
ventilation for the Dry-cleaning
17 kg E
(38 LBS)
24D 13A APPROVAL TYPE:
APPROVAL
machine - if you are aiming B -at solvent-based
15D A - APPROVED.
WASHER
24 kg 11D 7D 20D 22D
APPROVED AS NOTED,
(52.9 LBS)
APPROVED BY: RESUBMITTAL ISN'T REQUIRED.

13D D/T
STACKED
WASHER /
DRYER
23D machine ( perchloroethyleneRESUBMITTAL
DATE APPROVED:
C - /Perstabil
APPROVED AS NOTED, or
IS REQUIRED.
others)
26.4 kg
(58.2 LBS)
D - DISAPPROVED.
12D APPROVAL TYPE: N - NO ACTION.
D/T DRY
DRY CLEANING
26.4 kg
19D 9D
CLEAN
15A
MACHINE 8 KG CONSULTANT APPROVAL (CONSULTANT SUPERVISOR)
MACHINE
(58.2 LBS)
8D 8 KG

2E
Air conditioning
APPROVED BY: - Total Fresh air only 18-22
degree C (packaged Unit)
DATE APPROVED:
APPROVAL TYPE:

Lighting levels 500


REV. NO. Lux - 4500 DATE
DESCRIPTION k / 95 %BYCRI
Power trip in case of fire alarm
01 AS PER CLIENT COMMENTS 30MAR2023 BRN
02 AS PER CLIENT COMMENTS 19APR2023 BRN
03 AS PER CLIENT COMMENTS 04MAY2023 BRN
Separate
04 Laundry Hot
AS PER CLIENT water supply/system
COMMENTS 30MAY2023 JP
Laundry Manager Desk with
connection to LAN for POS A Dispensary storage cabinet or heater
CLIENT to boost ROYAL
NAME: the heated water
COMMISSION (AL ULA)to 60

use A103 A105 Degree


WORKcelcius and90-1222-0051
ORDER NO.: more
FLOOR PLAN DRAWING TITLE: OPERATION & MAINTENANCE BUILDING
VIEW SCALE 1:170 METERS MODEL NUMBER: RSS-2-72941

SCHEDULE OF AREAS SCHEDULE OF AREAS SCHEDULE OF AREAS QUANTITY: 1 EACH

NO. LOCATION AREA (m²) NO. LOCATION AREA (m²) NO. LOCATION AREA (m²) SPECIFICATION: FIREMASTER SERIES
1 HK EQUIPMENT STORAGE 9.4 13 FINANCE OFFICE 10.2 25 DOCTOR/NURSE OFFICE 8.7 VOLTAGE/CYCLE: 400/230V, 3Ph., 60Hz, 4W+G
2 MINI BAR STORAGE 6.3 14 SALES & MARKETING 11.1 26 TOILET AREA 3.7 BUILDING SIZE: 20,000mm x 40,000mm
3 DIRTY LINEN HOLDING AND SORTING 16 15 DIRECTOR OF F&B MINIBAR 8.8 27 FEMALE LOCKER ROOM 12
PROD. SERIAL NO.: 26493-A1 to 26512-B10
4 CHEMICAL STORAGE 10 16 ADMIN RECORD & STORE 10.2 28 FEMALE TOILET/CHANGING AREA 17.4
CONFIDENTIALITY :
5 HOUSEKEEPING AREA 19 17 OPEN OFFICE 44.6 29 HALLWAY 8 Your Company shall not use any Confidential Information in anyway
other than for the purpose of your project proposal, nor disclosure of
6 HK MANAGER ROOM 8.4 18 RESERVATION & SALES OFFICE 18.3 30 FEMALE PRAYER AREA 13 any confidential information to any third parties without Red Sea International's
7 CLEAN LINEN & ISSUE STORE 25.55 19 MEETING ROOM/STAFF TRAINING 28.9 31 MALE LOCKER ROOM 28 prior written consent.

8 LAUNDRY ROOM 59.9 20 HR OFFICES 17.9 32 MALE TOILET/CHANGING AREA 22 DRAWN BY: BRN

9 UNIFORM DISTRIBUTION 21.3 21 INTERVIEW OFFICE 10.3 33 MALE PRAYER AREA 18.5 CHECKED BY: JP

10 22 STORAGE & DISPENSARY 7 34 SERVING AREA 14.8 APPROVED BY: AZ


SERVER ROOM, IT OFFICE & STORE 23 DATE:
11 23 WAITING AREA 24 35 STAFF DINING AREA 47.35 30 MAY 2023

12 IT MANAGER 8.5 24 STAFF CONSULTATION ROOM (x2) 10 36 WASH AREA 8 SCALE: 1:170 SIZE: A3

DOC. NO.: MP2MGDMMD1004-RSH-XX-RB-000-DG-AR-070002 REV: 04


SHEET NO.: A102