Professional Documents
Culture Documents
Substructure Preliminaries: T.O. List
Substructure Preliminaries: T.O. List
List
Substructure
Preliminaries
1 Top Soil Removal
Pad Fdn.
1 Pit Excvtn
2 Disposal
3 Screed Conc.
4 Base Conc.
5 Col. Shaft Conc.
6 Fmwrk. for Base
7 Frnwk. For Column Shaft
8 Backfill
Strip Fdn.
1 Trench Excavation
2 Disposal
3 RRM
4 DPC
5 Backfill
Location Floor Element Item NRM2 REF.
Site preparation, removal of top soil for thkns of 150mm 5.5.2
Sub Struc Fdn Pad Fdn Pit excvtn for pad fdn, depth <2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Sub Struc Fdn Pad Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Sub Struc Fdn Pad Fdn <300mm,poured against ground 11.2.1.1.1
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col base, thickness <300mm 11.2.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Fmwrk for sides of col base,height<500mm 11.13.1
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col shaft, thickness <300mm 11.5.1.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Frmwrk for sides of isolated col shaft,square shaped
Sub Struc Fdn Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Sub Struc Fdn Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Sub Struc Fdn Strip Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Sub Struc Fdn Strip Fdn <300mm,poured against ground 11.2.1.1.1
Sub Struc Fdn Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Strip Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Strip Fdn 450mm thk RRM wall 14.1.1
Sub Struc Fdn Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Filling to fdn using mat obtained frm
Sub Struc Fdn Strip Fdn excvtn,depth>500mm 5.11.2
Sub Struc Fdn Strip Fdn DPC, width>300mm, applied hori
Sub Str Fdn Pad Fdn Reinfo T16 bar, sraight, for col and base
Sub Str Fdn Pad Fdn Reinfo T25 bar, bend, for col base
Type Unit No Length Width Dpth/Hght Girth Area
mm3 1.00 495,739,911.74
C1 mm3
C1 mm3 18.00 1,000.00 1,000.00 225.00
C1 mm3
C1 mm3
C1 mm 18.00 4,000.00
C1 mm 3
18.00 225.00 225.00 775.00
C1 mm 3
C1 mm3
C1 mm2 18.00 775.00 900.00
C1 ton 800.00
C1 ton 1,800.00
Qty Remarks
495,739,911.74
43,200,000,000.00
43,200,000,000.00
900,000,000.00
900,000,000.00
(900,000,000.00)
4,050,000,000.00
4,050,000,000.00
(4,050,000,000.00)
72,000.00
706,218,750.00
706,218,750.00
(706,218,750.00)
12,555,000.00
40,076,606,250.00
(6,277,500,000.00) for C1
33,799,106,250.00
2,585,587,500.00
2,585,587,500.00
(2,585,587,500.00)
83,313,375.00
37,491,018,750.00
(660,656,250.00) for C1
(36,830,362,500.00)
51,711,750.00
Query Sheet
01 6/7/2016
02 8/7/2016
03 10/7/2016
05 15/7/2016
06 16/07/2016
07 17/7/2016
…………………………………………
Quantity Surveyor
Query Sheet
mila - Nawala
ranga
Query Date
800mm
30mm
…………………………………………………………….
Architect/ Engineer
Location Floor Element Item NRM2 REF.
Site preparation, removal of top soil for thkns of 150mm 5.5.2
Type Unit No Length Width Dpth/Hght Girth Area
mm3 1.00 495,739,911.74
Qty Remarks
495,739,911.74
Location Floor Element Item NRM2 REF.
Sub Struc Fdn Pad Fdn Pit excvtn for pad fdn, depth <2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Sub Struc Fdn Pad Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Sub Struc Fdn Pad Fdn <300mm,poured against ground 11.2.1.1.1
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col base, thickness <300mm 11.2.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Fmwrk for sides of col base,height<500mm 11.13.1
Sub Struc Fdn Pad Fdn G30 in-situ RC, in col shaft, thickness <300mm 11.5.1.1.2
Sub Struc Fdn Pad Fdn Disposal of ecvtd mat offsite 5.9.2
Sub Struc Fdn Pad Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Sub Struc Fdn Pad Fdn Frmwrk for sides of isolated col shaft,square shaped
Type Unit No Length Width Dpth/Hght Girth Area
C1 mm3 18.00 1,000.00 1,000.00 2,400.00
mm3
C1
mm3
C1 18.00 1,000.00 1,000.00 50.00
C1 mm 3
C1 mm3
C1 mm3 18.00 1,000.00 1,000.00 225.00
C1 mm 3
C1 mm3
C1 mm 18.00 4,000.00
C1 mm3 18.00 225.00 225.00 775.00
C1 mm3
C1 mm3
C1 mm2 18.00 775.00 900.00
Qty Remarks
43,200,000,000.00
43,200,000,000.00
900,000,000.00
900,000,000.00
(900,000,000.00)
4,050,000,000.00
4,050,000,000.00
(4,050,000,000.00)
72,000.00
706,218,750.00
706,218,750.00
(706,218,750.00)
12,555,000.00
Location Floor Element Item NRM2 REF.
Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Strip Fdn Trench excvtn for strip fdn, depth<2.00m 5.6.2.1
Filling to fdn using mat obtained frm
Strip Fdn excvtn,depth>500mm 5.11.2
G15 in-situ mass conc, in screed, thickness
Strip Fdn <300mm,poured against ground 11.2.1.1.1
Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Strip Fdn Filling to fdn using mat frm excvtd,depth >500m 5.11.2
Strip Fdn 450mm thk RRM wall 14.1.1
Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Strip Fdn Disposal of ecvtd mat offsite 5.9.2
Filling to fdn using mat obtained frm
Strip Fdn excvtn,depth>500mm 5.11.2
Strip Fdn DPC, width>300mm, applied hori
Type Unit No Length Width Dpth/Hght Girth Area
Ext mm3 114,915.00 450.00 775.00
Ext mm 3
-18.00 1,000.00 450.00 775.00
mm3
Ext
mm3
Ext 114,915.00 450.00 50.00
Ext mm 3
Ext mm3
Ext mm2 114,915.00 725.00
Ext mm 3
114,915.00 450.00 725.00
Ext mm 3
-18.00 225.00 225.00 725.00
mm3
Ext
Ext mm2 114,915.00 450.00
Qty Remarks
40,076,606,250.00
(6,277,500,000.00) for C1
33,799,106,250.00
2,585,587,500.00
2,585,587,500.00
(2,585,587,500.00)
83,313,375.00
37,491,018,750.00
(660,656,250.00) for C1
(36,830,362,500.00)
51,711,750.00
Location Floor Element Item NRM2 REF. Type Unit
Sub Str Fdn Pad Fdn T16 bar, straight, for col and base C1 ton
Sub Str Fdn Pad Fdn T25 bar bend for col Base C1 ton
No Length Width Dpth/Hght Girth Area Qty Remarks
192 800.00
153,600.00
64 1,800.00 115,200.00
Location Item
Sub Struc
Disposal of ecvtd mat offsite
(empty)
(empty)
Total Result
Unit Sum - Qty
###
f ecvtd mat offsite ###
mm3 ###
h>300mm, applied hori ###
mm2 ###
dn using mat frm exc ###
mm3 ###
dn using mat obtain ###
mm3 ###
sides of col base,he ###
mm ###
r sides of isolated col ###
mm2 ###
u mass conc, in scree ###
mm3 ###
u RC, in col base, thi ###
mm3 ###
u RC, in col shaft, thi ###
mm3 ###
for pad fdn, depth <2 ###
mm3 ###
cvtn for strip fdn, dep ###
mm3 ###
hk RRM wall ###
mm2 ###
###
(empty)
ration, removal of top ###
mm3 ###
###
Bar Schedule
Descriptio
Type and №of Cutting Shape
Bar Mark n of №of Bars Total № A(mm) B(mm)
Size Elmts length Code
Elements
16
r Schedule
BAR
Bar Weight Specificati
C(mm) D(mm) E/R(mm) r (mm) d (mm) mass per
Length (kg) ons
kg/m
3 4
930.00 S.T.K. Enterprises
Cement Bag
930.00 Rajawaththa Enterprises 4 3
930.00 Kariyapperuma Enterprises 4 4
16,000.00 S.T.K. Enterprises 5 4
Sand Cube 15,600.00 Rajawaththa Enterprises 4 4
16,000.00 Kariyapperuma Enterprises 5 4
7,000.00 S.T.K. Enterprises 5 5
3/4" Metal Cube 7,200.00 Rajawaththa Enterprises 4 3
7,000.00 Kariyapperuma Enterprises 4 3
5,000.00 S.T.K. Enterprises 5 4
RRM Cube 5,600.00 Rajawaththa Enterprises 5 3
5,500.00 Kariyapperuma Enterprises 5 5
620.00 S.T.K. Enterprises 3 2
Tor Steel
Bar 650.00 Rajawaththa Enterprises 4 5
(12mm)
650.00 Kariyapperuma Enterprises 4 4
1,200.00 S.T.K. Enterprises 4 1
Tor Steel
Bar 1,300.00 Rajawaththa Enterprises 5 2
(16mm)
1,300.00 Kariyapperuma Enterprises 3 2
Hire of 1,500.00 Kivira Enterprises 4 4
Vibrator 1,000.00 Janith Enterprises (Pvt) Ltd 4 3
2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty ice rt ry nt y un
t
ue
s
uali Pr spo live plai cilit co eq
Q an e m Fa Di
s
Ch
Tr e D r co d it
tim o Cr
e
On s ef
on
e sp
R
P s eli
v pl ci o eq
Qu r an D om t Fa Di
sc
Ch
T e c di
tim f or C re
On se
p on
s
Re
Cement
2
Kariyapperuma Enterprises
1 S.T.K. Enterprises
Rajawaththa Enterprises
0
lit
y ice rt er
y in
t y un
t
ue
s
a Pr spo iv la cilit o q
Qu an el m
p Fa Di
sc
Ch
e
Tr e D r co d it
tim o Cr
e
On sef
on
e sp
R
3/4 Material
2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty t y t t es
ali ice or er in ity un
u Pr sp liv pla
acil
co equ
Q an e m tF Di
s
Ch
Tr e D r co di
m fo e
ti Cr
On nse
o
sp
Re
Tor Steel(12mm)
2
6
1 Kivira Enterprises
Janith Enterprises (Pvt) Ltd
0
ty ice rt ry nt y un
t
ue
s
u ali Pr spo live plai cilit co eq
Q an e a s
Tr eD co
m tF Di Ch
m r edi
ti fo Cr
On nse
o
e sp
R
Vibrator
Supplier Evaluation
Response
Transport On time for Credit Discount Cheques Total
Delivery Facility Points
complaint
3 5 4 1 3 2 25
4 4 1 1 4 2 23
5 5 5 1 2 3 29
3 4 5 1 3 1 26
4 4 1 1 2 2 22
3 5 5 1 4 3 30
2 4 4 1 5 4 30
3 4 2 2 1 2 21
5 5 4 1 2 1 25
4 4 4 1 2 1 25
4 3 3 4 3 1 26
2 4 4 1 5 3 29
4 1 4 1 4 2 21
4 3 3 2 5 2 28
3 3 3 2 3 1 23
5 2 2 4 2 2 22
3 4 4 5 1 3 27
5 4 4 3 2 3 26
4 3 1 1 1 4 22
4 1 1 2 1 5 21
2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
lit
y ice rt ry t y t s
a Pr spo live lain cilit oun que
Qu an e m
p Fa Di
sc
Ch
e
Tr e D r co d it
tim o Cr
e
On s ef
on
e sp
R
a P p v pl il o eq
Qu ns eli ac sc
Tr
a D co
m t F Di Ch
e di
tim f or Cre
On se
p on
s
Re
Sand
2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty ice rt er
y in
t y un
t
ue
s
uali Pr spo iv la cilit o q
an el p Fa sc e
Q
Tr e D r co
m it Di Ch
d
tim o Cr
e
On s ef
on
e sp
R
RRM
2
S.T.K. Enterprises
1 Rajawaththa Enterprises
Kariyapperuma Enterprises
0
ty t y t t es
ali ice or er in ity un
u Pr sp liv pla
acil
co equ
Q an e m tF Di
s
Ch
Tr e D r co di
m fo e
ti Cr
On nse
o
sp
Re
Tor Steel(16mm)
Legend
According to National Water Supply and Drainage Board Law, No. 2 of 1974 under Tariff 1
1 unit = 1m3
1m3 = 220 gal
Site Preparation
Removing top soil to a Depth not Exceeding 6" & Depositing as
01.A.03
Directed within Site
U / SK
1 L-007 Day 10 700.00 7,000.00
Labourer
Allow
2.5% of
1.01 Items 175.00
( 1.01 ) for
Tools
Total for 2.25 700 7,175.00
Rate for 1 700 717.50
Rate(Say) 1Sqr 717.50
Rate(Say) 1ft2 7.18
Rate(Say) 1m 2
77.20
Excavation
Excavation in trenches for walls column pits in ordinary soil from
01.B.03 0' 0" to 5' 0" deep and depositing excavated material not exceeding
30' 0"
Analysis for 1 Cube
No Item DescriptionItem Ref Unit Quantity Rate Amount
U / SK
1 L-007 Day 2.25 700.00 1,575.00
Labourer
Allow
2.5% of
1.02 Items 39.38
( 1.01 ) for
Tools
Total for 0 0 1,614.38
Rate for 1 0 1,614.38
Rate(Say) 1Cube 1,614.38
Rate(Say) 1ft 3
16.14
Rate(Say) 1m 3
570.00
02. Earth Work Support
Earth Work Support
Item
No Item Ref Unit Quantity Rate Amount
Description
Class II
1.01 Timber (17.5 M-140 Cu.ft 4.375 750.00 3,281.25
ft3 for 4 uses)
Concrete Work
05.A.04 Mixing Concrete 1:2:4(3/4")
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Cement M-026 Bag 18 930.00 16,740.00
1.02 Sand M-113 Cube 0.5 16,000.00 8,000.00
11,600.92
25,779.82
25,780.00
9,109.54
9,109.54
10,020.49
11,022.54
12,124.80
Column
Sawn
timber
formwork
to 9" x 9"
cement
1.01 concrete 06.A.02 1 Use 1 650.00 650.00
column in
ground
floor -
Making
Mould
Bolts
16mm 18"
1.02 M-010 No 0.6 75.00 45.00
(12 nos 20
uses)
1.03 Mould Oil M-071 litre 0.5 35.00 17.50
Timber
1.04 props 4" x M-144 L.ft 3.5 65.00 227.50
2"
Carpenter -
1.05 L-008 Day 0.25 1,200.00 300.00
assembling
U / SK
1.0599999 Labourer - L-007 Day 0.25 700.00 175.00
assembling
Carpenter -
dismantlin
1.0700001 g, cleaning L-008 Day 0.25 1,200.00 300.00
&
repairing
U / SK
Labourer -
dismantlin
1.08 L-007 Day 0.25 700.00 175.00
g, cleaning
&
repairing
Allow 15%
of Items
1.02 - - - - 37.50
( 1.01 ) for
Wastage
16 BWG
1.03 Binding M-005 Lbs 1.5 100.00 150.00
Wire
Allow
1.5% of
Items
1.04 - - - - 3.75
( 1.01 ) for
spaces or
chairs
1.05 SK Labour L-003 Day 1 1,200.00 1,200.00
U / SK
1.0599999 L-007 Day 1 700.00 700.00
Labourer
Total for Quantity Rate 2,341.25
Rate for 1 Rate 2,341.25
Rate(Say) 1Cwt 2,341.00
Rate(Say) 1Kg 46.82
Bill Of Quantity
Item Description Unit Quantity
Substructure
Site preparation, removal of top soil for thkns of 150mm mm2 495,739,911.74
Grand Total(Rs.)
uantity
Unit Quantity Rate Amount
m3 45.07
981,442.49