Professional Documents
Culture Documents
(石炭採掘法
石炭採掘法))
5
Open
p pit
p mining g (shovel
( &
truck): flexible
6
Seismic survey and
exploration drilling
7
Topsoil stripping by bulldozer
or scraper
8
Overburden drilling for blast
holes and blasting
9
Blasting pattern (example)
10
Powder
P d Factor(火薬原単位
Factor(
F t (火薬原単位
(火薬原単位))
Dragline: 0.2-
0.2-0.3 kg/m3
Shovel & trucks: 0.3-
0.3-0.5 kg/m3
Backhoe & trucks: 00.4
0.4-
4-0
4-0.6
6 kg/m3
Dozer pushing: 0.3-
0.3-0.5 kg/m3
11
E l i
Explosives (爆薬)
爆薬)
ANFO (Ammonium Nitrate Fuel Oil
Explosive)
Slurry, Watergel
Watergel,, Emulsion Explosives
High Density ANFO (emulsion blends or
heavy ANFO)
Velocity of detonation:
ANFO 2,200-4,000 m/s
2,200-
Watergels 3 3,500
3,500-
500-55,000
000 m/s
12
Emulsions 4,500-
4,500-6,100 m/s
Dragline (50 million US$)
13
14
Bucket Wheel Excavator
(over 1 billion US$)
15
Truck and shovel
16
Super dump truck-
truck-Komatsu 960E
(P l d 327t) 5 million
(Payload:327t) illi US$
17
Coal extraction (truck, dozer &
shovel)
18
The major equipment for the
mine producing 7 Mt/yr
6 x electric rotary drills (250 mm dia.) for overburden
12 x electric shovels with 17 m3 buckets for
overburden
4 x hydraulic shovels with 11 m3 buckets for coal
6 x rubber tired front end loaders with 9.6 m3 buckets
50 x 154 t 900 kW rear dump trucks for waste haulage
14 x 109 t 900 kW rear dump trucks for coal haulage
19 x 300 kW track
track--mounted bulldozers
3 x 224 kW wheeled
h l d bulldozers
b lld
Other vehicles (Pick-
(Pick-up cars, Site-
Site-mixing truck,
Graders Water spray trucks etc
Graders, etc.))
19
P f
Performance off equipment
i t
The bigger
bigger, the better!
20
Typical underground mining systems
21
Room (Bord)
(Bord)--and
and--pillar
(Continuous miner and shuttle car)
22
Wongawilli method and break line
supportt (BLS)
23
Longwall
Long all mining
Shield Supports
Shearing Machine
25
Plow mining
for thin
seams:
Seam thickness:
0.6--2.3 m
0.6
F ll automation
Full t ti
26
Shortwall Mining
g
27
Prop and cap mining system
物理探査の概要
28
“Kakkuchi
Kakkuchi” ” (Cut & fill) mining
for steep coal seam
29
Longwall
g top
p coal cavingg ((LTCC))
method for extra-
extra-thick seam
30
Multi-slicing method for thick
Multi-
seam
31
Blasting
gallery
(BG)
method
for thick
seams
using
long
blasting
holes
32
Ring
blasting
pattern
Longwall
Long all Panel Design
35
Interpanel--pillar system
Interpanel
36
Stability of
the longwall
face using
shield
hi ld
supports
37
38
39
Rapid
p roadwayy drivage
g with
S-100 Roadheader
40
Material transport
41
Rockbolts
42
Roadway y drivage
g with
bolter miner
43
Dual support system with
steel supports and bolts
Roof
R f b bolt
lt
(2.4m)
Rib bolt(1.5m)
Fiber mesh
45
Strata Behavior Monitoring
g
System
51
Metec miner system
s stem
52
Add car system (CHM)
53
Archveyor
A h system
t (CHM)
54
Longwall punch mining
55
Room/Bord-and-
Room/Bord-and-pillar punch
mining
56
Environmental problems:
Acid mine drainage (AMD)
Acid drainage is low pH
water with dissolved metals
and sulphate that drains from
pyrite-rich rocks that have
been exposed to oxidation.
F S2 + O2 + H2O・・・・・・
FeS O
Fe(OH)3 + H2SO4
57
Methane gas
emission/diffusion at ponds
58
Rehabilitation
Sedimentation pond
Thank you
for your kind
attention!
61