Design Class Detail Materials of Construction Project Date Capacity Utilization Design Item Design Class Class 1 Class 2 Class 3
Design Class Detail Materials of Construction Project Date Capacity Utilization Design Item Design Class Class 1 Class 2 Class 3
Capacity Utilization
Design Design Class
Item
Class 1 Class 2 Class 3
Castings Castings shall conform Castings for non-severe Castings shall conform to
to minimum code services such as MPIR 3 the EGGS OR DEPS for
requirements. and 4. shall conform to all services.
minimum code
requirements Castings for
severe services such as
MPIR 1 and 2 shall
conform to the EGGS OR
DEPS
Corrosion, Uniform Carbon steel with Cost-effective intermediate Cost-effective high alloy
corrosion allowance alloy and carbon steel and carbon steel shall be
shall be used in lieu of shall be used as much as used as much as possible
alloy as much as possible to meet the to meet the required life.
possible. If predicted required life. Replacement Repair of equipment is not
corrosion rates exceed of equipment is not anticipated within design
20 mpy, cost effective anticipated within the plant life.
intermediate alloy, design life.
coatings, or inhibitors
shall be used.
Equipment may require
replacement within the
plant design life.
Corrosion, Localized For individual Cost-effective intermediate Cost-effective high alloy
components with alloy and carbon steel and carbon steel shall be
identified localized shall be used as much as used as much as possible
corrosion, coatings and possible to meet the to meet the required life.
inhibitors with carbon required life for severe Repair of equipment is not
steel shall be used as services such as anticipated within design
much as possible in lieu MPIR 1 and 2. Inhibitors life.
of alloy. Especially and coatings shall be used
engineered inspection in lieu of alloy for non-
programs may be severe services such as
necessary to mitigate MPIR 3 and 4.
risks and replacement of Replacement of equipment
individual components is not anticipated but
may be required at each localized repairs are
shutdown. anticipated.