You are on page 1of 1

CURRENT MAINTANCE & SERVICE PLANT MECHANIC

17‐Jun‐20
NO ALAT  GRUP BREAKDOWN WO TGL JAM MASUK JENIS KERUSAKAN  PLANT MEKANIK TOTAL RUSAK BERAT
1 IS 15 ISUZU BERAT 24‐Jun‐18 ‐ INSIDEN ‐ EXCAVATOR 7 UNIT
2 MA 97 AXOR BERAT 3‐Nov‐18 ‐ INSIDEN ‐ ISUZU 2 UNIT
3 IS 18 ISUZU BERAT 5‐Feb‐19 ‐ INSIDEN ‐ AXOR 6 UNIT
4 MA 105 AXOR BERAT 30‐Jul‐19 ‐ INSIDEN ‐ LV 1 UNIT
5 LV 08 LV BERAT 12‐Sep‐19 ‐ ENGINE TOUBLE ‐ HINO 1 UNIT
6 EX 12 EXCAVATOR BERAT 2‐Dec‐19
2 Dec 19 ‐ HARNESS /ECM ‐ LT 0 UNIT
7 EX 09 EXCAVATOR BERAT 17‐Feb‐20 ‐ ENGINE OVERHOUL ‐ VIBRO 1 UNIT
8 EX 10 EXCAVATOR BERAT 25‐Feb‐20 ‐ MAIN PUMP HYDRAULIC ‐ ACTROS 1 UNIT
9 EX 05 EXCAVATOR BERAT 25‐Feb‐20 ‐ ENGINE OVERHOUL ‐ TOTAL 19 UNIT
10 EX 11 EXCAVATOR BERAT 2‐Mar‐20 ‐ HYDRAULIC GENERAL CHECK  ‐
11 MA 85 AXOR  BERAT 9‐Mar‐20 ‐ DUMP LEPAS ‐ TOTAL RUSAK RINGAN
12 VB 01 VIBRO BERAT 15‐Apr‐20 08.00 TOP OVERHOUL ENGINE ‐ AXOR 8 UNIT
13 EX 16 EXCAVATOR BERAT 25‐Apr‐20 ‐ ENGINE OVERHOUL (WATING PART) ‐ ACTROS 2 UNIT
14 MB 006 ACTROS BERAT 2‐May‐20 ‐ GARDAN BELAKANG ‐ EXCAVATOR 0 UNIT
15 HN 156 HINO BERAT 14‐May‐20 ‐ INSIDEN ‐ HINO 1 UNIT
16 MA 86 AXOR BERAT ‐ ‐ ‐ ‐ LV 0 UNIT
17 MA
MA 9898 AXOR BERAT ‐ ‐ ‐ ‐ WT 3 UNIT
18 MA 102 AXOR BERAT ‐ ‐ ENGINE TROUBLE ‐ ISUZU 1 UNIT
19 MA 84 AXOR BERAT 15‐Jun‐20 14.50 BOCOR SELANG RADIATOR,OVER HEAD EVAKUASI TARIK KE W/S BULLDOZER 0 UNIT
20 EX 08 EXCAVATOR BERAT 15‐Jun‐20 14.00 SWING DRIVE (WAITING PART) ‐ VIBRO 0 UNIT
21 WT 05 WT RINGAN 29‐May‐20 16.15 KOPLING,TURNION (PROGRES ) DELI &RODI LT 2 UNIT
22 MB 004 ACTROS RINGAN 1‐Jun‐20 17.00 LAS BAK DUMP GENERAL REPAIR ARMAN WHELL LOADER 0 UNIT
23 LT 06 LT RINGAN 2‐Jun‐20 16.20 OVERHOUL ENGINE  ( IN PROGRESS ) JUNAIDI & ANDRI M.GRADER 0 UNIT
24 IS 16 ISUZU RINGAN 10‐Jun‐20 10.00 KOPLING TINGGI SUHAIMI & SHADIK FUK 0 UNIT
BUSHING KUPU‐KUPU,HANGER 
25 MB 009 ACTROS RINGAN 11‐Jun‐20 09.00 SPRING,GREASING,SEPTI DUMP,LAS  MUSMULYADI TOTAL 17 UNIT
,
CHASIS,LAS KNALPOT
26 MA 99 AXOR RINGAN 12‐Jun‐20 14.20 BUSHING DUMP ATAS,KARET V  ABIDIN & RODI
27 MA 74 AXOR RINGAN 15‐Jun‐20 09.00 LAMPU DEPAN PECAH,LOCK OTOMATIS MUSMULYADI CURRENT MAINTANCE
FINIS 
28 MA 84 AXOR RINGAN 15‐Jun‐20 14.50 REPLACE CYL HEAD KM 17 CKP TEAM 59 UNIT
JOB/DAY
29 WT 02 WT RINGAN 16‐Jun‐20 15.00 PATAH SPRING R3,4 BUSHING SPRING R HERRY & ARISTIDIS OUTSTANDIN 17 UNIT
TOTAL JOB / 
30 LT 03 LT RINGAN 16‐Jun‐20 19.00 ACC DAN KABEL ACCU AMEN & INDRA 76 UNIT
DAY
31 WT 03 WT RINGAN 17‐Jun‐20 08.15 KAMPAS REM L/R BELAKANG,KAMPAS  SATO & ARISTIDIS
32 HN144 HINO RINGAN 17‐Jun‐20 16.00 PATAH SPRING DEPAN L1 SUKIRNO & ANDRI
PEN KAMPAS REM L2 LEPAS,KARET 
33 MA 76 AXOR RINGAN 17‐Jun‐20 15.30 CKP TEAM
STABILIZER L/R BAUT V TENGAH KENDOR
STABILIZER L/R,BAUT V‐TENGAH KENDOR
BOLT TAPAK SPRING L BELAKANG,U‐BOLT 
34 MA 79 AXOR RINGAN 17‐Jun‐20 16.00 RICARDO & SULISTIO
SPRING R BELAKANG,BOLT TABUNG 
35 MA 88 AXOR RINGAN 17‐Jun‐20 16.20 ANGIN TEKOR,CHECK REM RH DEPAN CKP TEAM
36 MA 89 AXOR RINGAN 17‐Jun‐20 14.00 CEK RODA R1 SATO
37 MA 94 AXOR RINGAN 17‐Jun‐20 16.15 OLI ENGINE,GREASING,AIR COOLANT JIRAN & PAUSEN

You might also like