MINE GEOTECHNICAL
INTRODUCTION
15-Mar-20
Textbook
1. John Read and Peter Stacey, 2009, Guidelines for Open Pit
Slope Design, CRC Press.
2. William A Hustrulid, Michael K.McCarter and Dirk J.A Van Zyl,
2000, Slope Stability in Surface Mining, Society for Mining
Mettalurgy and Exploration Inc.
3. Ducan C Wyllie & Christopher W Mah, 2007-4th Edition, Rock
Slope Engineering, Spon Press.
4. Charles A Kliche, 1999, Rock Slope Stability, Society for Mining
Mettalurgy and Exploration Inc.
5. E. Hoek & J.W Bray, 1994, Rock Slope Engineering, Institute of
Mining and Metalurgy.
6. Roy E. Hunt, 2007, Geotechnical Investigation Methods, CRC
Press.
7. Roy E Hunt, 2007, Geologic Hazards, CRC Press.
8. Kepmen ESDM No 1827K/30 2018 – Good Mining Practice.
9. KepDirjen 185K 2019.
ITNY
2020 15-Mar-20
MINE GEOTECHNICAL
INTRODUCTION
ITNY
2020 15-Mar-20
SCHEDULE
No TOPIC DATE
1 Introduction - Role & Overview Mine Geotechnical 26-Feb-20
2 Principle of Mine Geotechnical & Stability 29-Feb-20
3 Site Investigation 4-Mar-20
4 Physical & Mechanical Properties 7-Mar-20
5 Basic Concept Stability 25-Mar-20
6 Stability Analysis 28-Mar-20
7 Groundwater and Vibration 1-Apr-20
8 Circular Failure 4-Apr-20
9 Discontinue & Rockmas Classification 29-Apr-20
10 Wedge Failure 02-May-20
11 Plane & Toppling Failure 23-May-20
13 Slope Monitoring 17-Jun-20
14 Slope Stabilization 20-Jun-20
15 Geotechnical Risk Management 22-Jul-20
ITNY
2020 15-Mar-20
“Mengelola sumberdaya mineral secara
terintegrasi, mengoptimalkan tingkat
keuntungan dan umur tambang, menjaga
keselamatan operasi, serta merancang
strategi penanganan pasca tambang”.
ITNY
2020 15-Mar-20
Geotechnical Engineering and Mine
Slope Design
ITNY
2020 15-Mar-20
MODEL BIJIH DAN
BATUAN PENUTUP
PERENCANAAN
TAMBANG LABORATORIUM
PEMASANGAN TANDA
BIJIH DAN
PENUTUP
STACKER
RUANG KENDALI
MILL
ITNY
2020 15-Mar-20
DISCONTINUITIES Water Level WATER MATERIAL
Ground Soil
Bedding water
Plane
Rain
Fall
Joint Properties
Surface
Water Rock
Rock
Type
Fault Drainage
SLOPE
FAILURE
Static load
Excavation
External Method
force Height, dip,
direction
Seismic
Blasting
Geometry
Dynamic FORCE
Load
MINING
Internal
Insitu force
METHOD
Stress
Shovel &
truck
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
Trace of presplit
hole
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
Geoteknik adalah suatu ilmu kajian rekayasa
kebumian yang berkonsentrasi pada aplikasi teknologi
teknik sipil untuk konstruksi yang melibatkan aplikasi
dari material alam dan terdapat pada atau dekat
permukaan. Kajian meliputi kondisi geologi, sifat fisik
dan mekanis batuan.
ITNY
2020 15-Mar-20
Why is Geotechnical Engineering Important?
ITNY
2020 15-Mar-20
The Challenge
– Design must ensure that a level of safety is achieved which is
acceptable to the owner and Regulatory bodies.
– Design must ensure security of the value embodied in the
orebody.
– Design must be economically optimal so that maximum return is
obtained from the investment.
Reduced Waste
$$$$
Orebody
Increased Ore
Extraction $$$$
ITNY
2020 15-Mar-20
Flying Dozer
ITNY
2020 15-Mar-20
ANY QUESTION
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
Cost benefit curves
60
50
dollars (millions)
benefits
40
net benefit
20
10
0
35 40 45 50 55
slope angle (deg)
ITNY
2020 15-Mar-20
SLOPE DESIGN
OPTIMUM SLOPE
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
ITNY
2020 15-Mar-20
Geotechnical Engineering and Mine
Slope Design
ITNY
2020 15-Mar-20
ESSENTIAL
ELEMENTS IN
MINE SLOPE
DESIGN
ITNY
2020 15-Mar-20
TRADITIONALLY SURFACE MINE
ITNY
2020 15-Mar-20
Applicability in Surface Mine
ITNY
2020 15-Mar-20
Uncertainty and Percentage Sampling
ITNY
2020 15-Mar-20
Uncertainty and Percentage Sampling
The Reality
1. Mining geotechnics for slope design
• Percentage sampling <1%.
• Smaller than probably any other facet of mine design.
2. Mine Design targets
• Overall slope angles about 1 – 3 degree.
3. Only possible to meet these targets with good geological
model
4. What constitutes a good geological model
“Vision is concerned with making observation such as :
measurements, observations of from and pattern,
Vision is perception; an awareness of the significance
of the observation and insight or intuition. We live and
work with limited vision.
ITNY
2020 15-Mar-20
Geotechnical and Geological Complexity
ITNY
2020 15-Mar-20
Impact of Complexity on Risk and Ability to Define
Geotechnical and Geological Conditions Adequately
ITNY
2020 15-Mar-20
Faulting at Inpit Crusher
ITNY
2020 15-Mar-20
Ulan Coal Mine – Simple Geology
ITNY
2020 15-Mar-20
Impact Mine Scale
ITNY
2020 15-Mar-20
Impact of Mine Scale on Geological Complexity Risk and
Geological Model
ITNY
2020 15-Mar-20
Muswellbrook
Coal Mine
Hunter Valley
ITNY
2020 15-Mar-20
Tom Price Iron Mine WA
ITNY
2020 15-Mar-20
Bougainville Copper Mine
Solomon Insland
ITNY
2020 15-Mar-20
Woodlawn Lead Zinc Mine NSW
ITNY
2020 15-Mar-20
Small Gold Mine WA
ITNY
2020 15-Mar-20
Impact of Mine Scale
1. As mine scale increases, either in term of area covered of
volume of material to be excavated the geological complexity
usually increases.
2. As scale and geological complexity increase;
Geotechnical conditions may or not worsen
But number of factors to be addressed or considered
usually increases significantly.
3. Mine Scale affected both
The reliance that must be placed on the geological model.
The scale of the geotechnical investigations
4. Small Scale
Few specific geotechnical boreholes will often suffice
5. Medium to Large scale
Not economically or practically feasible to investigate to
the same level.
Therefore must rely on the geological model.
ITNY
2020 15-Mar-20
Impact of Mine Depth
ITNY
2020 15-Mar-20
CONCLUSION
Mining Geotechnics – Geological Based sciences.
Geology is the cornerstone.
Geotechnical investigations for Mining.
o Uncertainty and percentage sampling.
o Geology complexity
o Impact of mine scale – depth and areal extent
o Stages of Mine Development.
ITNY