The document contains calculations of the cross-sectional areas and volumes of structural concrete used in a diagonal and top dike at six stations along a length. The cross-sectional areas were calculated using the thickness, diagonal length, and top length provided for each station. The volumes were then calculated between each pair of stations by multiplying the length by the average of the cross-sectional areas at each end. The total volume calculated was 326.6404 cubic meters with the contract volume being 305 cubic meters.
The document contains calculations of the cross-sectional areas and volumes of structural concrete used in a diagonal and top dike at six stations along a length. The cross-sectional areas were calculated using the thickness, diagonal length, and top length provided for each station. The volumes were then calculated between each pair of stations by multiplying the length by the average of the cross-sectional areas at each end. The total volume calculated was 326.6404 cubic meters with the contract volume being 305 cubic meters.
The document contains calculations of the cross-sectional areas and volumes of structural concrete used in a diagonal and top dike at six stations along a length. The cross-sectional areas were calculated using the thickness, diagonal length, and top length provided for each station. The volumes were then calculated between each pair of stations by multiplying the length by the average of the cross-sectional areas at each end. The total volume calculated was 326.6404 cubic meters with the contract volume being 305 cubic meters.