Nama sabfa rizky hermawan (420 182 7014)

Dik :
Fondasi (P1) = 14 titik
Ukuran pelat fondasi = 0.70 m x 0.70 m
Kedalaman fondasi = 0.70 m
fondasi Lebar fondasi = 0.70 m
Tinggi pasir urug = 0.15 m
Tinggi lantai kerja = 0.05 m
Kolom pondasi = 0.50 x 0.5 m
Panjang sloof = 37.50 m
sloof Lebar sloof = 0.15 m
tinggi sloof = 0.30 m
= 0.012 mm 0.15 m
Pembesian Tulangan pelat/pedestal
UK. Kolom pedestal = 0.20 x 0.20 m
tul sloof ulir = 0.013 m

Mencari volume
Volume galian struktur = L.plat x kedalaman fondasi x jlh ti
= 0.49 x 0.70 x 14
= #VALUE! 3
m
Volume galian = panjang x lebar
= 0.49 2
m
Volume galian tipe B = Luas x P.total
= 18.375 3
m
Volume urugan pasir = p.total x luas urugan pasir
= 37.50 x 0.105
= 3.9375 m3
Volume sloof beton = panjang x lebar x tinggi
= 37.50 x 0.15 x 0.30
= 1.6875 m3
weremesh lantai 1 type M.6

berat total weremesh = rat wereme x L denah

= 3.07 x 27.25
= 83.6575 kg
berat total tul sloof = p.total x diameter tulangan x 2
berat/m
= 37.50 x 0.013 x 1.04
= 37.50 x 0.01352
= 0.507 kg
Jlh sengkang = p.sloof : jarak antar sengkang+1
= 32 : 0.25
= 129 buah