This document is an attendance sheet for an EHS meeting for the 100 MW NVR Pannirkulam project. It lists 20 rows for names, personnel numbers, designations, and signatures but none of the rows have any information filled in. The header identifies the contractor as L&T Construction Power Transmission and Distribution and names the project as the 100 MW NVR Pannirkulam project along with the date.
This document is an attendance sheet for an EHS meeting for the 100 MW NVR Pannirkulam project. It lists 20 rows for names, personnel numbers, designations, and signatures but none of the rows have any information filled in. The header identifies the contractor as L&T Construction Power Transmission and Distribution and names the project as the 100 MW NVR Pannirkulam project along with the date.
This document is an attendance sheet for an EHS meeting for the 100 MW NVR Pannirkulam project. It lists 20 rows for names, personnel numbers, designations, and signatures but none of the rows have any information filled in. The header identifies the contractor as L&T Construction Power Transmission and Distribution and names the project as the 100 MW NVR Pannirkulam project along with the date.
Sl No Name of the person Name of the Contractor Designation Signature
10
11
12
13
14
15
16
17
18
19
20
L&T CONSTRUCTION POWER TRANSMISSION & DISTRIBUTION IC
PROJECT EHS MEETING ATTENDANCE SHEET
Name of the Project: 100 MW NVR ,Pannirkulam Date: L&T CONSTRUCTION POWER TRANSMISSION & DISTRIBUTION IC PROJECT EHS MEETING ATTENDANCE SHEET Name of the Project: 100 MW NVR ,Pannirkulam Date: Sl No Name of the person Ps No: Designation Signature