A work completion certificate was issued for a 5% milestone of installing a waste water treatment system at the 1263 MW Punjab Power Plant in Jhang. The certificate confirmed that part of the waste water treatment system had been installed according to the requirements in Clause 14.3 of the EPC agreement between CMEC, NESPAK, and PTPL.
A work completion certificate was issued for a 5% milestone of installing a waste water treatment system at the 1263 MW Punjab Power Plant in Jhang. The certificate confirmed that part of the waste water treatment system had been installed according to the requirements in Clause 14.3 of the EPC agreement between CMEC, NESPAK, and PTPL.
A work completion certificate was issued for a 5% milestone of installing a waste water treatment system at the 1263 MW Punjab Power Plant in Jhang. The certificate confirmed that part of the waste water treatment system had been installed according to the requirements in Clause 14.3 of the EPC agreement between CMEC, NESPAK, and PTPL.
Milestone D M Y Completion of steam turbine oil flushing Date
Milestone No: 27 1 2023
M-69
Work Completion Certificate
Notice is hereby given to all parties that partial (05%) completion of following Milestone Works has been achieved. Title Completion of Installation for Waste Water Treatment System (05%)
Description
As per Clause 14.3 of EPC Agreement it is confirmed that: