You are on page 1of 3

Power

St e am Powe r Pla nt
Powe r Pla nt
0 22- 01- 0 1 PRELIMINARY ISSUE Bf r Gn Lt
Me ch . Civ il E le c. A r r gt .
Re v Da t e De s cr ip t io n P r epar e d Re le a s e d
Re vie we d
P r o j e c t .D o c . N o
OWNER' S CONSULTANT
P R IVA T E L IM ITE D , C O NS U L T IN G E N G INE E R S
GUJ ARAT S T AT E ENERGY GENERA T ION LT D.
HAZ IRA 15 6 .1 MW CCP P (KA8 C2 - 2 )
Barbier.F. 22-01-01 A3
Geney.J.N. 22-01-01 E G E NER ATO R & TRA NSF OR ME R P RO TEC TIO N
TRIP PING LO G IC DIAG RA M
Langlade.T. 22-01-01 FO R G T1 1 & G T12
0 CO V ER SH EE T E
P ow er
S t e am P ow e r P la n t
H A Z IR A
P o w er P lan t
H A G 9 9E---C H A LO 001 3 1
1 2 3 4 5 6 7 8
GENERAL
LIST OF CONTENTS T HE T RIP P ING LO GIC DIA GR A M P RES EN T S A N OV ERV IEW OF A LL P OS S IBLE CONDIT ION S CA U S ING A P ROT ECT IV E
A LA RM OR A CT ION W IT H IN T HE GEN ER A T O R P RO T ECT ION S Y S T EM
A A
S HEET P LAN/ DES TINATION TITLE IS S UE/ MODIFIC. S UCH P ROT ECT IV E A CT IO NS CA N BE INIT IA T ED F ROM T HE FO LLOW ING S Y S T EMS :
NO. 0 A B C D E F ELECT RICA L P R OT ECT ION CO NS IS T ING OF : CONFIGURATION
1 COVER SHEET X - GENERA T OR P ROT ECT ION
- S T EP - UP T A N S F ORMER P ROT ECT ION
- S T A T ION S ER V ICE T RA NS F OR MER P ROT ECT ION
2 LIS T OF CONT ENT S AND GENERAL INFORMAT ION X
- MIS CELLA N EOUS ELECT R ICA L P ROT ECT ION S Y S T EMS W IT H T RIP V IA GENERA T OR P ROT ECT IO N S Y S T EM
- UNIT A UX ILIA RY T RA NF O RMER P ROT ECT IO N 6
3 GT 11 OR GT 12 GENERAT OR AND TRANS FORMER P ROT ECT ION X
G ENERA T OR & T RA NS F OR MER P ROT ECT ION S Y S T EM
GS U
T HE P ROT ECT ION S Y S T EM IS S P LIT UP IN T O T W O S Y S T EMS A & B P R OT ECT ION FU NCT IONS
A R E EIT HER P R OCES S ED IN S Y S T EM A OR S Y S T EM B. T H E CORRES P ONDING T RIP P ING OUT P UT S
A & B A RE OR - CONNECT ED A ND S P LIT UP A GA IN F OR IN IT IA T ION O F T RIP P ING COIL 1 & 2 OF
T HE CIRCU IT BREA KER CONCER NED
B B
P ROTECTION S YS TEMS UAT SST
1
GA S T UR BINE P RO T ECT ION S Y S T EM
T HE G A S T URBINE IS EQ UIP P ED W IT H A T HREE- CHA NNEL P R OT ECT ION S Y S T EM. EA CH CHA N NEL IS CONN ECT ED
T O R EDUND A NT MEA S UREMEN T LOOP S . A N A NT IV A LENCE S UP ERV IS ION OF MEA S U REMENT S IS IMP LEMENT ED IN
4 3 5
EV ER Y P R OT ECT ION CH A NN EL. W H ENEV ER T W O OUT OF T HR EE CHA N NELS INIT IA T E A T R IP , T H E RES P ECT IV E
P RO T ECT ION BECO MES A CT IV E. ~
2
ELECT RICA L P ROT ECT ION S Y S T EM
T HE ELECT R ICA L P RO T ECT ION S Y S T EM IS S P LIT UP INT O T W O IND EP ENDENT CH A NN ELS A A ND B . P ROT ECT IO N
F UNCT IO NS A RE EIT HER P R OCES S ED IN S Y S T EM A OR S Y S T EM B. T H E CORRES P ONDING T RIP P ING OUT P UT S
AP P LICABLE FOR GT11 OR GT12
A A ND B A R E OR- CONN ECT ED A N D S P LIT UP A GA IN F O R INIT IA T IO N OF T R IP P ING COIL 1 A ND 2 OF T HE CIRCU IT
BREA KER CON CERNED.
C C
P ROTECTIVE ACTION
GT P LS T
P LS T IS DEF INED A S P RO T ECT IV E LOA D S HEDDING T RIP I.E. DELOA D IN G OF T H E GA S T URB IN E T O IDLE OP ERA T IO N
A LO NG T H E P RE- S ET G RA D IEN T UNT IL T HE RES ERV E P OW ER RELA Y IS A CT IV A T ED,
F OLLOW ED BY A N INS T A NT A NEOU S S HU T - DOW N (Q UICK CLO S ING OF T HE S HUT - OF F V A LV ES ) W IT HOUT A NY HOLD
A T IDLING F OR F URT HER DET A ILS REF ER T O T HE GT OP ERA T ING CON CEP T .
D LEGEND : 1 GT GEN CB T RIP D
IN CA S E OF A GA S T URB IN E GENERA T OR CIRCU IT BREA KER T RIP T HE CIRCUIT B REA KER IS T RIP P ED
W IT HOU T A NY D ELA Y , F OLLOW ED BY G A S T URBINE IDLING OP ERA T ION.
1 OR GATE INITIATION OF P ROT ECTIVE ACTION
2 GT EX CIT CB T RIP
INS T A NT A NEOUS T RIP O F T HE GA S T U RBINE EX CIT A T ION CIR CU IT BREA KER A ND IMMEDIA T E BLOCKING OF T HY RIS T O R
& AND GAT E INVERS ION V A LV ES (A LW A Y S CO MBINED W IT H A S IMULT A NEOU S T RIP OF T HE G T GENERA T OR CB, IF NO T A LR EA DY OP EN.)
CONNECTION 3 GT LV CB T RIP
INS T A NT A NEOUS T RIP O F T HE GA S T U RBINE LOW V OLT A GE CIRCUIT BR EA KER OF UNIT A UX ILIA RY T RA NS F ORMER
0 t
TIME DELAY 4 GT S F C CB T RIP
GA S T URB IN E S T A T IC F REQ UEN CY CON V ERT ER OF F IS DEF INED A S IMMEDIA T E BLOCKING OF T HE S F C T HY R IS T OR
V A LV ES , F OLLOW ED B Y OP ENING OF T HE MEDIU M V OLT A G E F EED- IN CIRCUIT BR EA KER.
E * LOGIC IS P ROGRAMMED IN P ROTECTION S YS TEM E
5 GT MV CB S S T T RIP
INS T A NT A NEOUS T RIP O F T HE GA S T U RBINE MED IUM V OLT A GE CIRCUIT BR EA KER OF UNIT S T A T IO N S ERV ICE T RA NS F ORMER
6 GT HV CB T R IP
T HIS P R OT ECT ION IN IT IA T ES T HE T RIP P IN G OF T H E HIGH V OLT A GE CIRCUIT BR EA KER OF T HE RES P ECT IV E
S T EP - UP T RA NS F ORMER.
F Re v is io n T it le F
0 GENERATOR AND TRANSFORMER PROTECTION
Pr oj e c t PS KKS
We r e s er ve a ll r ight s in t his documen t and in t he inf or mat io n P ower HAZIRA
cont a ined t he r ein. Re pr oduct ion, us e or d is clos ur e t o t hir d S t e a m Powe r Pl a nt
Do c. N o . S h e e t No .
par t ie s wit ho ut our e xpr es s aut hor it y is s t r ict ly f or bidden. P owe r Pla nt
Copyr ight ALS TOM POWER2 001 HAG99E- - - CHALO001 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
DESCRIPTION S TATUS REMARKS LOGIC PROTECTIVE ACTIONS
CODE

GT EXCIT CB TRIP
GT GEN CB TRIP

GT MV CB TRIP
GT HV CB TRIP

GT LV CB TRIP
A A

GT SS D OFF
GAS TURBINE ELECTRICAL PROTECTION

GT PLS T
GENERATOR MKA10
GENERATOR DIFFERENTIAL P ROTECTION 87G S YS A + B
OVERVOLTAGE PROTECTION MAX 1 59.1 S YS A + B
OVERVOLTAGE PROTECTION MAX 2 59.2 S YS A + B
1
NEGATIVE S EQUENCE PROTECTION MAX 1 ALARM 4 6.1 S YS B
NEGATIVE S EQUENCE PROTECTION MAX 2 4 6.2 S YS B
OVERCURRENT/ UNDERVOLTAGE P ROTECTION 51V S YS B
95% S TATOR EARTH FAULT PROTECTION 59GN S YS A
100% S TATOR EARTH FAULT PROTECTION 64 GN S YS B
REVERS E P OWER PROTECTION (HIGH SETTING) 32.1 S YS B
REVERS E P OWER PROTECTION (LOW SETTING) (ALSO USED FOR NORMAL SHUT- DOWN)32.2 S YS A *
&
B LOS S OF EXCITATION / DEF TIME P ROTECTION 4 0.1 S YS B * B
LOS S OF EXCITATION PROTECTION WITH TIME INTEGRATOR 4 0.2 S YS B
1 &
POLE S LIP PROTECTION 78 S YS A
GENERATOR OVERLOAD PROTECTION ALARM 4 9.1 S YS A
GENERATOR OVERLOAD PROTECTION 4 9.2 S YS A
BUSBAR EARTH FAULT PROTECTION 59NB.2 S YS B
ALARM
*
BUSBAR EARTH FAULT PROTECTION ALARM 59NB.1 S YS B & &
*
MINIMAL IMPEDANCE P ROTECTION 21 S YS B &
GENERATOR CIRCUIT BREAKER FAILURE ( ACTIVATED FROM PROTECTION GEN CB TRIP ) BF S YS A + B
UNDERFREQUENCY P ROTECTION <MIN 1 ALARM 81.1 S YS B
*
UNDERFREQUENCY P ROTECTION <MIN 2 81.2 S YS B &
UNDERFREQUENCY P ROTECTION <MIN 3 81.3 S YS B
*
INADVERTENT GCB CLOSING 4 1/ 51 S YS A
ALARM &
VOLTAGE BALANCE ALARM 60 S YS A + B &
C C
OTHER S YS TEMS *
1
VOLTAGE TRANSFORMER VT55.4 (MCB) ALARM FAILURE S YS B
START DISCONNECTOR CLOSED S YS A + B
VOLTAGE TRANSFORMER VT52.1 (MCB) ALARM FAILURE S YS B
GENERATOR CIRCUIT BREAKER (CONTROL S IGNAL ONLY) CLOSED S YS A + B
ROTOR EARTH FAULT STAGE 2 (ACTIVATED FROM EXCITATION) 64 F.2 S YS A
EXCITATION FAILURE (ACTIVATED FROM EXCITATION) 40 S YS A + B
GT S URGE P ROTECTION (ACTIVATED FROM TURBINE P ROTECTION) ACTIVE S YS A + B
HIGH VOLTAGE FAILURE (ACTIVATED FROM HV SWITCHGEAR PROTECTION) HV S WGR S YS A + B
S TEP- UP TRANSFORMER BAT10 *
&
DIFFERENTIAL PROTECTION 87T S YS A
HIGH S ET *
&
D OVERCURRENT PROTECTION 50T S YS B D
EARTH FAULT PROTECTION 51NT S YS B 1
RES TRICTED EARTH FAULT P ROTECTION 87NT S YS A
BUCHHOLZ RELAY MAX 2 63T S YS B
SATURATION (V/ Hz ) PROTECTION 24 S YS A
GAS RELAY TAP SYSGER MAX 2 63TC S YS B
OIL TEMP ERATURE RELAY 26T S YS B
1
OVERLOAD RELAY (WINDING TEMPERATURE) 4 9T S YS B *
OVERCURRENT PROTECTION 51T S YS B &
SUDDEN P RESS URE RELAY (ALARM) 0 63TP S YS B
UNIT AUXILIARY TRANS FORMER BBT10
OVERCURRENT PROTECTION 50/ 51UAT S YS A
BUCHHOLZ RELAY DGPT (OIL LEVEL- FLOAT) 71UAT S YS A 1
DIFFERENTIAL PROTECTION 87UAT S YS B
E E
OIL TEMP ERATURE RELAY 26UAT S YS A
PRESSURE SWITCH (ALARM) 0 63UAT S YS A
1
*
STATION SERVICE TRANS FORMER BBT20 * 0 t 12 0 s
&
OVERCURRENT PROTECTION 50/ 51S ST S YS B
BUCHHOLZ RELAY MAX 2 63S ST S YS B
DIFFERENTIAL PROTECTION 87S ST S YS A
1
EARTH FAULT PROTECTION 51NSS T S YS A
OIL TEMP ERATURE RELAY 26S ST S YS B
OVERLOAD RELAY (WINDING TEMPERATURE) 4 9SST S YS B
1
*
PRESSURE RELIEF DEVICE (ALARM) 0 4 9SST S YS B * 0 t 12 0 s
&
OIL LEVEL (ALARM) 4 9SST S YS B
F Re v is io n T it le F
0 GENERATOR AND TRANSFORMER PROTECTION
Pr oj e c t PS KKS
We r es er ve al l r ight s in t his d ocumen t and in t he inf o r mat ion Po wer HAZIRA
cont ain ed t her ein. Rep r oduct io n, u s e or dis clos ur e t o t hir d S t e a m Powe r Pl a nt
Do c . N o . S h e e t No .
par t ies wit hou t our ex pr es s a ut hor it y is s t r ict ly f or b idden. P owe r Pla nt
Copyr ight ALS TOM POWER20 01 HAG99E- - - CHALO001 3
1 2 3 4 5 6 7 8

You might also like