You are on page 1of 2

DRILL LOG Hole No : BH.T-1 Sheet No.

: 1 of 2

Project Geological Investigation of Pidekso Dam Depth 39 m Drill Rig Tone UD-5

Site Main Dam Coordinate X: 449662 Y:9111600 Inclination Vertical Drilled By Jumadi

Elevation - Meter Date 22-Sep to 17-Oct-17 GWL -2.8 Logged By Rosihan A.L
SPT
Elevation (m)

Classification

Cassing Pipe
Core Barrel
& Bit Type
Permeability
Formation

Column

Lugeon /
N - Value

Section
G.W.L
Depth

Depth
Rock
Date

Core Recovery RQD


(m)

(m)
Description Number of Blows
(%) (%)
per 30 Cm Penetration
0 10 20 30 40 50 0 25 50 75 100 0 25 50 75 100
22-Sep-17

0.0 ~ 3.5 M River Deposite


RIVER DEPOSITE

90 0
1
River deposite, contain silt to 1
boulder materials, dominated by
igneous rock such andesit, diorite 50 100 0
and pyroclatic materials,
23-Sep-17

2 2
subrounded-rounded

upper part contain silt, yellowish 100 0


2.8
3 brown, very stiff-hard, moist, 3
medium plastic,
3.5 50 100 0
24-Sep-17

4 4

3.68E-04
100 0
5 5
25-Sep-17

50 95 0
6 6

100 0
7 7
26-Sep-17

1/46e-4
50 100 0
PYROCLASTIC DEPOSITE

8 8

3.5 ~ 19.6. M Pyroclastic Deposite 100 0


9 Pyroclastic Deposite, light grey- 9
greenish grey, high to medium
weathered,unconsolidated materials. 50 100 0
3-Oct-17

10 10
matrix, silty sand, contain quartz

9.71E-05
mineral, unconsolidated, angular.

SINGLE TUBE CORE BARREL


100 0
poorly sorted, coarse sand
11 11
fragmen, various rock, dominated by
volcanic rock, angular to sub-angular, 50 100 0

D
12 boulder sized, contain some trace 12
4-Oct-17

volcanic bomb

89 mm
100 0
13 13

1.35E-04
50 100 0
14 14
5-Oct-17

100 0
15 15

50 100 0
16 16
1.02E-04
6-Oct-17

100 0
17 17

50 100 0
18 18

100 0
19 19
7.02E-05
7-Oct-17

19.6 50 100 0
20 20
WEATHERED BRECCIA

100 10
19.6~ 33.8 M Weathered Breccia
21 Beccia, light grey-greenish grey, high 21
8-Oct-17

weathered, tuffaceous, unconsolidated


material, 100 10
22 22
matrix, medium to coarse sand, poorly
3.68E-04

D-CL
9-Oct-17

sorted, angular to sub-angular, opened


contact (fabric), 100 20
23 23
Fragmen, gravel to boulder size, sub-
angular, dominated by igneous rock 100 10
such andesite and basalt
10-Oct-17

24 24

100 10
25 25
DRILL LOG Hole No : BH.T-1 Sheet No. : 2 of 2

Project Geological Investigation of Pidekso Dam Depth 39 m Drill Rig Tone UD-5

Site Main Dam Coordinate X: 449662 Y:9111600 Inclination Vertical Drilled By Jumadi

Elevation - Meter Date 22-Sep to 17-Oct-17 GWL -2.8 Logged By Rosihan A.L
SPT
Elevation (m)

Classification

Cassing Pipe
Core Barrel
& Bit Type
Permeability
Formation

Column

Lugeon /
N - Value

Section
G.W.L
Depth

Depth
Rock
Date

Core Recovery RQD


(m)

(m)
Description Number of Blows
(%) (%)
per 30 Cm Penetration
0 10 20 30 40 50 0 25 50 75 100 0 25 50 75 100

100 0

8.80E-05

89mm
26 26
11-Oct-17

100 0
27 27

100 10
WEATHERED BRECCIA

SINGLE TUBE CORE BARREL


28 19.6~ 33.8 M Weathered Breccia 28

7.39E-05
Beccia, light grey-greenish grey, high
weathered, tuffaceous, unconsolidated 100 10
29
material, 29

D-CL
matrix, medium to coarse sand, poorly
12-Oct-17

sorted, angular to sub-angular, opened 95 0


30 contact (fabric), 30
Fragmen, gravel to boulder size, sub-
angular, dominated by igneous rock 100 0
31 such andesite and basalt 31

8.61E-05
13-Oct-17

95 0
32 32
14-Oct-17

90 0
15-Oct-17

33 33

100 0
33.8
34 34

5.80E-05
16-Oct-17

33.8~ 39.0 M Breccia 100 50

TRIPLE TUBE CORE BARREL


35 Beccia, light grey-greenish grey, fresh, 35
massive, tuffaceous, contain trace clay
material, compacted. 100 30
BRECCIA

36 36
matrix, medium to coarse sand, poorly

CM
sorted, angular to sub-angular, opened
100 70
contact (fabric)
37 37

5.20E-05
17-Oct-17

Fragmen, andesite, gravel to boulder


sized, sub-angular 100 70
38 38

100 60
39 39.0 39
END OF DRILLING
40 40

41 41

42 42

43 43

44 44

45 45

46 46

47 47

48 48

49 49

50 50

You might also like