09-04-2017 Reconstructed process flow and table relationships of the PDC
(Monday) (Edit of Checks, Approve, Disapprove, and Check Transmittal)
09-05-2017 Started preparing the Interface Modeling aspect of the PDC
(Tuesday) System
09-06-2017 Added the table definitions for the PDC System
(Wednesday)
09-07-2017 Finished mapping the tables (with table relationships) to be
(Thursday) used for the PDC System
09-08-2017 Started programming in C#. Created a simple program in open
(Friday) road to simulate connecting to two different databases.
09-11-2017 Programmed CRUD operations in C#. Created a simple system
(Monday) to facilitate database operations using stored procedures.
09-13-2017 Meeting with Sir Engel regarding PDC. Started PDC project.
(Wednesday)
09-14-2017 Defined tables for prototype PDC Program
(Thursday) Started creation of data entry for prototype PDC Program
09-15-2017 Created PDC Data extraction program and Data transfer
(Friday) program for generation of test values from one database to another

Accomplished by: Certified by: Noted by:

________________________ ______________________
____________________ KRISTIAN EDSEL S. AMARANTE ENGELBERT S. LANDICHO
ROBERT E. PILAPIL
Employee Information Technology Officer III Department Manager III