You are on page 1of 1

1.

ARRANGEMENT OF CONTENTS:

The sequence in which the project progress report material should be arranged and bound
should be as follows:

1. Cover Page & Title Page


2. Certificates : a. Certificate from Project Guide
b. Certificate from Project Coordinator & Head of the Department
3. Declaration by the group members
4. Certificate by the Company
5. Acknowledgments
6. Table of Contents
7. Abstract
. 8 Chapters
8.1 Introduction and H/W & S/W Requirements
8.2 Problem Identification & Feasibility Study
8.3 Requirement Analysis
8.4 Review of Previous work
8.5 Project Description
8.6 Design
i. Context Diagram
ii. Data Flow Diagrams
iii. Entity Relationship Diagrams
iv. Flowchart
v. Snapshots of the Project
vi. Database & Tables
8.7 Conclusion & Future work
9. References & Appendices
10. Bio data of each group member

2. PAGE DIMENSION AND BINDING SPECIFICATIONS:

The dimension of the project report should be in A4 size.

 Binding & Color code of the report: Hard Bound Report


 Background color of the cover page : Black Color
 Color of Text on the cover page: Golden