You are on page 1of 13

BRANTAS GBU (PT.

PJB – Generation Business Unit)

Brantas GBU operates 12 hydro power plant spreading along Konto River and Brantas River in East
Java, most of which are of Dutch remnant. Total installed capacity of all existing hydropower
Brantas GBU is 281.38 MW. Every year UP Brantas generates electricity energy approximately
1.033,56 GWh, channelized through Extra High Voltage Air Channel 500 kV to Java-Bali
interconnection system.

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


Type Hydro Power Plants
Area East Java – Indonesia
Kind of Fuel Hydro
1. PLTA Sengguruh Unit 1 dan 2 = 2 x 14,50 MW
2. PLTA Sutami / Karangkates = 3 x 35.00 MW
3. PLTA Wlingi = 2 x 27.00 MW
4. PLTA Lodoyo = 1 x 4,50 MW
5. PLTA Tulungagung = 2 x 18.00 MW
6. PLTA Selorejo = 1 x 4,48 MW
7. PLTA Mendalan Unit 1 = 1 x 5,60 MW
Power Capacity
PLTA Mendalan Unit 3, 4 dan 5 = 3 x 5,80 MW
8. PLTA Siman Unit 1, 2 dan 3 = 3 x 3,60 MW
9. PLTA Giringan Unit 1 dan 2 = 2 x 0,90 MW
PLTA Giringan Unit 3 = 1 x 1,40 MW
10. PLTA Golang Unit 1, 2 dan 3 = 3 x 0,90 MW
11. PLTA Ngebel = 1 x 2,20 MW
12. PLTA Wonorejo = 1 x 6,50 MW
Owner PT. Pembangkitan Jawa Bali (PT. PJB)
Shareholders PT. PLN
Activity Since See below
Contact Suhata E Putra – Manager
Address Jl. Basuki Rakhmad No. 271
Karangkates-Sumberpucung,
Malang 65165
East Java
Email upbrs@ptpjb.com
Phone & Fax Phone : 62-341-385545, 385546,
Fax : 62-341-385462
Web http://www.ptpjb.com

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


1. PLTA Sengguruh Unit ( 2 x 14,50 MW)

Sengguruh Hydroelectric Power Plant located in the Sengguruh village, Kepanjen, Malang
regency, East Java. Sengguruh dam gets water supply from Amprong and Lesti rivers. At the
beginning of the construction of Sengguruh dam it was planned for hydroelectric power
plant for peak loads and sendiment control.

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Boving Vertical Kaplan n.a. Ellin 1988 14.50
2 Boving Vertical Kaplan n.a. Ellin 1988 14.50

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


2. PLTA Sutami / Karangkates = 3 x 35.00 MW

Karangkates dam or are now commonly referred as to Sutami dams located in Karangkates
Village, District Sumberpucung, Malang regency, East Java. Dam where the water comes
from the Brantas River was built by the government between the years 1975-1977 with
funding of about U.S. $ 37.97 million or Rp.10.093 billion to serve as a Hydroelectric Power
Plant (HEPP), which has an installed capacity of 3x35 megawatts (MW) and capable of
producing approximately 400 million kWh electricity per year.
To be able to reach the Karangkates dam relatively easy (using public transportation),
because of its location on the edge of the highway-Blitar Malang, about 35 kilometers south
of the city of Malang or 16 kilometers west of the tourism object of Kawi Mount.

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Toshiba Vertical Francis 3600420A Toshiba 1973 35.00
2 Toshiba Vertical Francis 3600420B Toshiba 1973 35.00
3 Toshiba Vertical Francis 3600420C Toshiba 1974 35.00

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


3. PLTA Wlingi = 2 x 27.00 MW
Located in Jegu village , Sutojayan district, Blitar regency, East Java

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Toshiba Vertical Kaplan 3600762 Meidensa 1978 27.00
2 Toshiba Vertical Kaplan 3600896 Meidensa 1980 27.00

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


4. PLTA Lodoyo = 1 x 4,50 MW
Located in Serut, Kec. Kademangan Kab. Blitar 66161 Jawa Timur - Indonesia

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Toshiba Horizontal Kaplan 3601219 Meidensha 1983 4.50

5. PLTA Tulungagung = 2 x 18.00 MW


The Hydropower plant located in Sidem, Besole Village, District Besuki, Tulungagung - East Java is a
hydropower utilizing potential of the water resources of the watershed of the Ngrowo river
downstream in Parit Agung channel. Parit Agung channel is coming from the Parit Raya channel,
Kalidawir, part of Brantas River and small rivers that channel lead down into the Parit Agung channel.

Currently Tulungagung hydropower is under the management umbrella of PT Power Jawa Bali -
Brantas Generation Unit. This hydropower is designed with a vertical Francis type turbines with a
maximum installed capacity of 2 x 18 MW. This hydropower is operated by applying a seasonal
pattern of run-of-river. The average annual energy generated reaches approximately 184 GWh.

Since the first time operation of the company in 1993, Tulungagung hydropower already has a role
as a major supporter of 70 kV power lines in the southern part of East Java, which covers an area of
Tulungagung, Trenggalek, Ponorogo, and Pacitan.

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Voest Alpine MCE Vertical Francis MB9-097/1 Ellin 1993 18.00
2 Voest Alpine MCE Vertical Francis MB9-097/2 Ellin 1993 18.00

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


6. PLTA Selorejo = 1 x 4,48 MW
The Selorejo dam is located in the village Selorejo, Ngantang district, Malang regency. Location of
the dam is at Kunto river, Brantas river, just below its meeting with the Kwayangan river, ± 50 km to
the west of the city of Malang. The development of Selorejo Dam is conducted from 1963 to 1970.
Implementation of initial development was P.N. Wisata Karya under the Directorate of Irigation,
Public Works Department and Electricity by the supervision of the Department of Irigation of East
Java Province, then in 1965 followed / carried out by the BAPRO BRANTAS (by force account). Kajima
Construction Co.., Ltd.. and Overseas Construction Co., act as mentors in the field / guidance under
the supervision of Nippon Koei Co.., Ltd.. Work completed hydropower in 1972.

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Ebara Vertical Kaplan R.111019-01 Meidensha 1973 4.48

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


7. PLTA Mendalan Unit = 1 x 5,60 MW + 3 x 5,80 MW

Mendalan Hydroelectric is located about 3 km downstream Selorejo dam, exactly in Pondok Agung
village Kasembon district, Malang regency, East Java (about 60 km north west of the city of Malang)
at an altitude of ± 427.50 m above sea level and surrounded by mountains.

This hydropower utilizes water potential Konto river (out flow) from Selorejo hydropower
accommodated in water pond, then channeled through the penstock to turn a turbine. Hydroelectric
Mendalan founded by the Dutch government in 1927, the building is a legacy of the Dutch called
NIWEM (Nederlandsch of Indische Water Kracht Electricitiet Maatscapppy) and operational in 1932.

At that time Mendalan have 4 generating units with an installed capacity of 5.6 MW, with the brand
Oerlikon. About 1949 Mendalan Hydropower did not escape from a battle that resulted in the
destruction of the four units. In 1953 the Dutch made repairs, almost all of the equipment was
broken so Dutch merge tools that can still be used from the four units turned out to be one unit with
a same capacity that was 5.6 MW, and plus the manufacture of 3 units with a capacity of 5.8 MW,
branded Schorch. Because at that time the Dutch recognized Indonesian sovereignty which is then
Mendalan hydropower was handed over to PLN dated December 30, 1957. Until now, the four units
are operating.

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com
No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Escher Wyss Horizontal Francis 8261 Oerlikon 1930 5.60
2 Stork Holland Horizontal Francis 7703 Schorh 1955 5.80
3 Stork Holland Horizontal Francis 7704 Schorh 1955 5.80
4 Stork Holland Horizontal Francis 7705 Schorh 1955 5.80

8. PLTA Siman = 3 x 3,60 MW


Siman Hydropower is one of the plants in the border of Kediri and Malang district. Siman
hydropower capacity is 3 x 3.5 MW. Siman Hydropower is supplying electricity for the around area
(Siman, Kepung, Puncu) and Sekar Putih Mojokerto substation.

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Escher Wyss Vertical Francis 9565 BBC 1955 3.60
2 Escher Wyss Vertical Francis 8356 Oerlikon 1931 3.60
3 Escher Wyss Vertical Francis 8359 BBC 1955 3.60

9. PLTA Giringan = 2 x 0,90 MW + 1 x 1,40 MW


Giringan hydropower located in Kepel Village, Kare distric, Madiun regency, East Java.

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Strok Hengelo Horizontal Francis 2788 Smith.S 1955 0.90
2 Strok Hengelo Horizontal Francis 2788 Smith.S 1955 0.90
3 Strok Hengelo Horizontal Francis N1.000 Heemaf 1937 1.40

10.PLTA Golang Unit 1, 2 dan 3 = 3 x 0,90 MW


Golang Hydro power is located in Kuwiran village, Kare district, Madiun regency, East Java

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Neyrpic Horizontal Francis n.a. Alstom 1959 0.90
2 Neyrpic Horizontal Francis n.a. Alstom 1959 0.90
3 Neyrpic Horizontal Francis n.a. Alstom 1959 0.90

11.PLTA Ngebel = 1 x 2,20 MW


Ngebel Hydropower is located in Wagir Lor village, Ngebel distric, Ponorogo regency, East Java

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com


No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 B. Maier Horizontal Francis 2037 AEG 1968 2.20

12.PLTA Wonorejo = 1 x 6,50 MW


Wonorejo hydropower is located in Wonorejo village, Pagerwojo district, Tulungagung regency, East
Java

No. Turbine
Generator COD MW
Unit Manufacturer Type Serial Number
1 Toshiba Francis, VF-1RS A 107481 Toshiba 2001 6.50

Sources :
1. http://www.ptpjb.com 2. http://www.pln.co.id/ 3. PLN power plant inventory list 4. Other websites

INDONESIA POWER GENERATION http://repit.wordpress.com/ repit.s@gmail.com

You might also like