You are on page 1of 12

Lean

Manufacturing
Your Company Name
Employee Lean Manufacturing with Sort Shine Standard and Sustain

Sort
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.

Sustain 01
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention. 05 Set In Order
This slide is 100% editable. Adapt
Lean 02 it to your needs and capture your
audience's attention.
Manufacturing

Standardise 04
This slide is 100% editable. Adapt
it to your needs and capture your
03 Shine
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.

www.company name 2
Lean Manufacturing with Defects Overproduction Inventory and Processing

Defects Overproduction Waiting Non-Utilized Talent

Efforts caused by rework, scrap, This slide is 100% editable. Adapt Wasted time waiting for the next This slide is 100% editable. Adapt
and incorrect information, it to your needs and capture your step in a process, it to your needs and capture your
audience's attention. audience's attention.

Transportation Inventory Motion Extra-Processing

This slide is 100% editable. Adapt Excess products and materials not This slide is 100% editable. Adapt More work or higher quality than is
it to your needs and capture your being processed, it to your needs and capture your required by the customer,
audience's attention. audience's attention.

www.company name 3
Lean Manufacturing with Motion Over Production Inventory and Transportation

Transportation
Any postponement between when
one process step closes and the
subsequent stage starts

Defects Inventory
This slide is 100% editable. Adapt This slide is 100% editable. Adapt
it to your needs and capture your it to your needs and capture your
audience's attention. audience's attention.

T I M W O O D

Over Production Motion


A larger number of materials or This slide is 100% editable. Adapt
data close by than is as of now it to your needs and capture your
required audience's attention.

Over Processing Waiting


Any part of the administration that does
Making more than is required by client, not adjust to client needs
or making it sooner than required

www.company name 4
Lean Manufacturing with Overproduction Inventory Waiting and Motion
Overproduction
Making more than is required
by client, or making it sooner
than required

Intellect Transportation
This slide is 100% editable. Adapt This slide is 100% editable. Adapt
it to your needs and capture your it to your needs and capture your
audience's attention audience's attention

Motion Inventory
This slide is 100% editable. Adapt A larger number of materials or
it to your needs and capture your data close by than is as of now
audience's attention required

Rework Waiting
This slide is 100% editable. Adapt Any postponement between
it to your needs and capture your when one process step closes
audience's attention and the subsequent stage starts

Processing
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention
www.company name 5
Lean Manufacturing with People System Technology and Focus Area

SHORT
This slide is 100% editable. Adapt
CYCLES This slide is 100% editable. Adapt
it to your needs and capture your it to your needs and capture your
audience's attention. audience's attention.

TECHNOLOGY PEOPLE
• Structured flow • Total employee
manufacturing involvement

• Text Here • Text Here


• Text Here • Text Here
• Text Here Lean • Text Here
Manufacturing

Total Quality Continuous


This slide is 100% editable. Adapt Focus SYSTEMS Improvement This slide is 100% editable. Adapt
it to your needs and capture your • Level load & balanced flow it to your needs and capture your
audience's attention. audience's attention.
• Text Here
• Text Here
• Text Here

www.company name 6
Lean Manufacturing with Transport Inventory Waiting Defects and Skills

Transport Inventory Motion Waiting


This slide is 100% editable. This slide is 100% editable. This slide is 100% editable. This slide is 100% editable.
Adapt it to your needs and Adapt it to your needs and Adapt it to your needs and Adapt it to your needs and
capture your audience's capture your audience's capture your audience's capture your audience's
attention. attention. attention. attention.

Over Production Over Processing Defects Skills


This slide is 100% editable. This slide is 100% editable. This slide is 100% editable. This slide is 100% editable.
Adapt it to your needs and Adapt it to your needs and Adapt it to your needs and Adapt it to your needs and
capture your audience's capture your audience's capture your audience's capture your audience's
attention. attention. attention. attention.

www.company name 7
Lean Manufacturing with Waste Type Physical Product and Office Example

Type of Waste Physical Product Example Office Example

Transporting Moving the Product From One Location to Another Unnecessary Information Exchange Between Departments

Inventory-Unnecessary Text Here Text Here

Motion-Unnecessary Text Here Text Here

Waiting Text Here Text Here

Over Production Text Here Text Here

Over Processing Text Here Text Here

Defects Text Here Text Here

Skills/Unrealised People Potential Text Here Text Here

www.company name 8
Lean Manufacturing

Transport This slide is 100% editable. Adapt it to your needs and


capture your audience's attention.

Inventory This slide is 100% editable. Adapt it to your needs and


capture your audience's attention.

Motion
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.

WASTE Waiting This slide is 100% editable. Adapt it to your needs and
This slide is 100% editable. capture your audience's attention.
Adapt it to your needs and
capture your audience's
attention.
Over Production This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.

Over Processing
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.

Defects
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.

www.company name 9
Seven Wastes of Lean Manufacturing with Transport Motion and Defects

Over Over Defects Transport Inventory Motion Waiting


Processing Production

This slide is 100% Making more than is Any part of the This slide is 100% A larger number of This slide is 100% Any postponement
editable. Adapt it to required by client, or administration that editable. Adapt it to materials or data editable. Adapt it to between when one
your needs and making it sooner than does not adjust to your needs and close by than is as your needs and process step closes
capture your required client needs capture your of now required capture your and the subsequent
audience's attention. audience's attention. audience's attention. stage starts

www.company name 10
Value Added In Lean Manufacturing with Overproduction and Over-processing

This slide is 100% editable. Adapt Making more than is required by


it to your needs and capture your client, or making it sooner than
audience's attention. required

Value Over
Added Production

This slide is 100% editable. Adapt A larger number of materials or


it to your needs and capture your data close by than is as of now
audience's attention. Over Inventory required
Processing

Defects Transportation

Any part of the administration that This slide is 100% editable. Adapt it
does not adjust to client needs to your needs and capture your
Waiting Motion audience's attention.

Any postponement between when This slide is 100% editable. Adapt it


one process step closes and the to your needs and capture your
subsequent stage starts audience's attention.

www.company name 11
Thank You
Address: Contact Numbers: Email Address:
# street number, city, state 0123456789 emailaddress123@gmail.com

www.company name 12

You might also like