Professional Documents
Culture Documents
Manufacturing
Your Company Name
Employee Lean Manufacturing with Sort Shine Standard and Sustain
Sort
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Sustain 01
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention. 05 Set In Order
This slide is 100% editable. Adapt
Lean 02 it to your needs and capture your
audience's attention.
Manufacturing
Standardise 04
This slide is 100% editable. Adapt
it to your needs and capture your
03 Shine
audience's attention.
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
www.company name 2
Lean Manufacturing with Defects Overproduction Inventory and Processing
Efforts caused by rework, scrap, This slide is 100% editable. Adapt Wasted time waiting for the next This slide is 100% editable. Adapt
and incorrect information, it to your needs and capture your step in a process, it to your needs and capture your
audience's attention. audience's attention.
This slide is 100% editable. Adapt Excess products and materials not This slide is 100% editable. Adapt More work or higher quality than is
it to your needs and capture your being processed, it to your needs and capture your required by the customer,
audience's attention. audience's attention.
www.company name 3
Lean Manufacturing with Motion Over Production Inventory and Transportation
Transportation
Any postponement between when
one process step closes and the
subsequent stage starts
Defects Inventory
This slide is 100% editable. Adapt This slide is 100% editable. Adapt
it to your needs and capture your it to your needs and capture your
audience's attention. audience's attention.
T I M W O O D
www.company name 4
Lean Manufacturing with Overproduction Inventory Waiting and Motion
Overproduction
Making more than is required
by client, or making it sooner
than required
Intellect Transportation
This slide is 100% editable. Adapt This slide is 100% editable. Adapt
it to your needs and capture your it to your needs and capture your
audience's attention audience's attention
Motion Inventory
This slide is 100% editable. Adapt A larger number of materials or
it to your needs and capture your data close by than is as of now
audience's attention required
Rework Waiting
This slide is 100% editable. Adapt Any postponement between
it to your needs and capture your when one process step closes
audience's attention and the subsequent stage starts
Processing
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention
www.company name 5
Lean Manufacturing with People System Technology and Focus Area
SHORT
This slide is 100% editable. Adapt
CYCLES This slide is 100% editable. Adapt
it to your needs and capture your it to your needs and capture your
audience's attention. audience's attention.
TECHNOLOGY PEOPLE
• Structured flow • Total employee
manufacturing involvement
www.company name 6
Lean Manufacturing with Transport Inventory Waiting Defects and Skills
www.company name 7
Lean Manufacturing with Waste Type Physical Product and Office Example
Transporting Moving the Product From One Location to Another Unnecessary Information Exchange Between Departments
www.company name 8
Lean Manufacturing
Motion
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
WASTE Waiting This slide is 100% editable. Adapt it to your needs and
This slide is 100% editable. capture your audience's attention.
Adapt it to your needs and
capture your audience's
attention.
Over Production This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Over Processing
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Defects
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
www.company name 9
Seven Wastes of Lean Manufacturing with Transport Motion and Defects
This slide is 100% Making more than is Any part of the This slide is 100% A larger number of This slide is 100% Any postponement
editable. Adapt it to required by client, or administration that editable. Adapt it to materials or data editable. Adapt it to between when one
your needs and making it sooner than does not adjust to your needs and close by than is as your needs and process step closes
capture your required client needs capture your of now required capture your and the subsequent
audience's attention. audience's attention. audience's attention. stage starts
www.company name 10
Value Added In Lean Manufacturing with Overproduction and Over-processing
Value Over
Added Production
Defects Transportation
Any part of the administration that This slide is 100% editable. Adapt it
does not adjust to client needs to your needs and capture your
Waiting Motion audience's attention.
www.company name 11
Thank You
Address: Contact Numbers: Email Address:
# street number, city, state 0123456789 emailaddress123@gmail.com
www.company name 12