- Quality Control in Construction
- Inspections & Non-conformance in Construction
5. Module 5: ISO 9001, Its Content & Guidelines
- Documentation Requirements for ISO 9001
- Management Responsibility for Quality Management System
- Human Resources (Competence, awareness & training; Infrastructure; Work Environment)
- Product Realization
- Purchasing
- Measurement, Analysis & Improvement
6. Module 6: Final Exam
References:
1. ISO 9001 Quality Management System Requirements
2. Project Management Body of Knowledge 5 th Edition by PMI
3. Construction Management: New Direction 3rd Edition by Denny McGeorge & Partick Zuo
Course Schedule:
Date Activities
December 9, 2018 Module 1
January 13, 2019 Module 2
Submit Written Report 1
January 13, 2019 Module 3
Submit Written Report 2
February 3, 2019 Module 4
Submit Written Report 3
February 24, 2019 Module 5
Submit Written Report 4
March 17, 2019 Final Examination
Academic Integrity:
Cheating, plagiarism and other form of intellectual dishonesty are absolutely prohibited under the PUP
Rules and regulations. You are covered by these rules. Please be advised accordingly.
Grades:
A. Rating Distribution:
Written Report 1 – 10% Written Report 4 – 20% Quizzes – 15%
Written Report 2 – 10% Attendance – 10%
Written Report 3 – 20% Final Exam – 15%
B. Grading System
Percentage Numerical Rating Descriptive Rating
97% - 100% 1.0 Excellent
94% - 96% 1.25 Very Good
91% - 93% 1.5 Good
88%-90% 1.75 Satisfactory
85%-87% 2.0 Fair
Inc. Lacking papers/Exam
Dropped Non attendance/non submission of
assignment/requirements
Note: Passing Grade is 2.0 above; Below 85% is considered failed
2
Assignment:
A. Written Reports
1. Discuss about Total Quality Management, its definition, historical development and
methods.
2. Discuss what is Six Sigma, its definition, methodologies and applications in construction.
3. Prepare a Method of Statement for any major activity in construction such as Cast in Place
Reinforced Concrete Works, Steel Structural Works, Piling Works, Pre-Cast Reinforced
Concrete Works, Waterproofing Works, Roofing Works, etc. Included in the Method of
Statement are the Inspection Test Plan, Quality Checklist and Risk Assessment/Job Hazard
Analysis.
4. Assume that you have your own construction company (License A Category) and you
wanted to get an ISO 9001 Certification, prepare a Quality Management Plan. This Plan
should cover all aspect required in ISO 9001.
B. Format of Report
1. For 1 & 2, see below:
I. Cover Page IV. Objective
II. Table of Contents V. Body of Unit
III. Introduction VI. References
2. For 3, see Below:
I. Cover Page IX. Quality Assurance & Control
II. Table of Contents - Inspection Test Plan & Checklist
III. Introduction X. Safety
IV. Purpose / Scope of Work - Risk Assessment / Job Hazard
V. Standard References Analysis
VI. Definitions & Abbreviations XI. Resources
VII. Materials Definition & XII. Appendices
Specification - Work Methodology Diagrams.
VIII. Work Method Statement - Typical Work Sequence
3. For 4, see below:
I. Cover Page VI. Leadership & Resources
II. Table of Content VII. Construction Operation
III. Introduction VIII. Performance Evaluation
IV. QMS Representative IX. Improvement
V. QMS Policy
Report/Assignment should be submitted thru soft copy in pdf format with digital signature. Soft copy
should be sent via manuelopenuniversity@gmail.com and emabini portal (https://emabini.pup.edu.ph).