You are on page 1of 1

EPC Contractor Consultant Client

M/S Simplex Infrastructures M/S Yongma Engineering C0.Ltd in association with M/S Sterling Indo-Tech National highways and Infrastructure
Limited Consultant Pvt.Ltd. development Corporation Limited

Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length 20.683km) on Daboka Dimapur section(Dimapur by pass)on NH36&NH39
on EPC basis under phase -A of SARDP-NE in the State of Nagaland

CONCRETE DELIVERY CHALLAN


SL No
Location
Structure
Vehical No
Type of Mix
Time of Despatch
Quantity (M3)
Cummulative Quantity (M3)
Slump at plant
Slump at site

Signature of Sender Signature Consultant / Client Signature of Receiver

EPC Contractor Consultant Client


M/S Simplex Infrastructures M/S Yongma Engineering C0.Ltd in association with M/S Sterling Indo-Tech National highways and Infrastructure
Limited Consultant Pvt.Ltd. development Corporation Limited

Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length 20.683km) on Daboka Dimapur section(Dimapur by pass)on NH36&NH39
on EPC basis under phase -A of SARDP-NE in the State of Nagaland

CONCRETE DELIVERY CHALLAN


SL No
Location
Structure
Vehical No
Type of Mix
Time of Despatch
Quantity (M3)
Cummulative Quantity (M3)
Slump at plant
Slump at site

Signature of Sender Signature Consultant / Client Signature of Receiver