5 Integrated storm water design for all the roads in the As Discussed with nodal officer of AMRUT
ABD area as prepared by AMRUT team shall be project, Tumakuru there is no integrated storm
studied and overlap of SWD reaches shall be avoided water design is taken up, how ever a short
in the SCM project. In this regard the concurrence to stretches of drains construction has been taken
the proposed SWD network under SCM may be and connected to the nearest Raj kalvey. There
obtained by sharing the drawings with City is no overlapping of scope of smart city project
Corporation Tumakuru, handling the AMRUT project. and AMRUT projects.
Garden EXISTING NO NO NO NO NO NO NO NO
Project Proposal
1 1 1 1 1
1
Proposal 0 0 0 0 0 0 0 0 0 0 0
0
Visual Underground Street Lighting Street
Land scaping Footpath Cycle Track Bollards
Improvements Ducting Poles Furniture
EXISTING 0 0 0 0 0 0 0 0
PROPOSED 0 1 0 1 1 1 1 0
Project Component
Legend
0 – No
EXISTING PROPOSED
1 – Yes
Project Proposal
1 1 1 1 1 1 1 1
1
Proposal
0 0 0 0 0 0 0 0
0
Visual
Underground Street Street
Land scaping Footpath Cycle Track Improvement Bollards
Ducting Lighting Poles Furniture
s
EXISTING 0 0 0 0 0 0 0 0
PROPOSED 1 1 1 1 1 1 1 1
Project Component Legend
0 – No
EXISTING PROPOSED 1 – Yes
Project Proposal
1 1 1 1 1 1 1 1
1
Proposal
0.5
0 0 0 0 0 0 0
0
Visual Underground Street Lighting Street
Land scaping Footpath Cycle Track Bollards
Improvements Ducting Poles Furniture
EXISTING 0 0.5 0 0 0 0 0 0
PROPOSED 1 1 1 1 1 1 1 1
Project Component
Legend
0 – No
0.5 – Partial
EXISTING PROPOSED
1 – Yes
Project Proposal
1 1 1 1 1 1 1 1
1
Proposal
0 0 0 0 0 0 0 0
0
Visual Underground Street Lighting Street
Land scaping Footpath Cycle Track Bollards
Improvements Ducting Poles Furniture
EXISTING 0 1 0 0 0 0 0 0
PROPOSED 1 1 1 1 1 1 1 0
Project Component
Legend
0 – No
EXISTING PROPOSED
1 – Yes
Project Proposal
1 1 1 1 1 1 1 1
1
Proposal
0.5
0 0 0 0 0 0 0
0
Visual Underground Street Lighting Street
Land scaping Footpath Cycle Track Bollards
Improvements Ducting Poles Furniture
EXISTING 0 0 0 0 0 0 0.5 0
PROPOSED 1 1 1 1 1 1 1 1
Project Component Legend
0 – No
EXISTING PROPOSED 0.5 – Partial
1 – Yes
Project Proposal
1 1 1 1 1 1 1 1
1
Proposal
0 0 0 0 0 0 0 0
0
Visual Underground Street Lighting Street
Land scaping Footpath Cycle Track Bollards
Improvements Ducting Poles Furniture
EXISTING 0 0 0 0 0 0 0 0
PROPOSED 1 1 1 1 1 1 1 1
Project Component Legend
0 – No
EXISTING PROPOSED 1 – Yes
Project Proposal
1 1 1 1 1 1 1 1 1
1
Proposal
0.5
0 0 0 0 0 0
0
Visual Underground Street Lighting Street
Land scaping Footpath Cycle Track Bollards
Improvements Ducting Poles Furniture
EXISTING 0 0.5 0 0 0 0 1 0
PROPOSED 1 1 1 1 1 1 1 1
Project Component Legend
0 – No
EXISTING PROPOSED 0.5 – Partial
1 – Yes
Project Proposal
1 1 1 1 1 1 1 1 1
1
Proposal
0.5
0 0 0 0 0 0
0
Visual Underground Street Lighting Street
Land scaping Footpath Cycle Track Bollards
Improvements Ducting Poles Furniture
EXISTING 0 0.5 0 0 0 0 1 0
PROPOSED 1 1 1 1 1 1 1 1
Project Component Legend
0 – No
EXISTING PROPOSED 0.5 – Partial
1 – Yes
• Discontinuous footpath along the stretch and open drains along the pedestrian
walkway.
• Varying carriageway and footpath width along the road - problems of bottleneck
arising at the road.
Actual
Master plan
Sl.No Road Name Length (M) Average ROW(M) Functionality Ownership
Min ROW Max ROW ROW(M)
9 12 10
Chamundeshwari Temple
1 Rd2 678 (74) (23) 15 (581) Sub-Arterial TCC
16 34 30
3. Traffic Survey
➢ Classified Volume Count Survey
➢ Parking Survey
➢ Pedestrian Count Survey
➢ Vendor Count Survey
4. Geo-Technical Investigations
➢ Soil Classification
➢ OMC & MDD Test
➢ CBR Test
➢ Pavement Composition
5. Benkelman Beam Deflection Survey
4. Vendors 4 Nil
Near Ganesha Temple Near Shri Krishna Mandir Near Opp Shri Krishna Mandir
7%
9%
81%
Two Wheeler Auto Rickshaw (Passenger) Car/ Van LCV Auto (Goods)/ Mini LCV Cycle
Weekend
1062 13:00 - 14:00 954 10:45 - 11:45
8% 8%
9% 9%
79% 80%
Two Wheeler Auto Rickshaw (Passenger) Car/ Van Two Wheeler Auto Rickshaw (Passenger) Car/ Van
Bus LCV Auto (Goods)/ Mini LCV Bus 2 & 3 Axle Trucks Auto (Goods)/ Mini LCV
Peak hour Traffic- Weekday 1- Chamundeshwari Road Peak hour Traffic- Weekday 2- Chamundeshwari Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 Weekday 2
1326 14:15 - 15:15 1204 11:00 - 12:00 1337 14:15 - 15:15 1199 11:00 - 12:00
2W 4W Auto
VENDOR SURVEY
At present this road as only 4 vendor along the whole stretch of road
8. Tactile tile Nil Provided for full length to advise visually impaired people
Infront of Aruna Hospital Near New India Express Land Opp. Balaji Traders
Composition of Traffic
1%
0% 1%
0%
22%
45%
31%
21%
21% 45%
44%
31%
31%
Peak hour Traffic- Weekday 1- Dr. Radhakrishna Road Peak hour Traffic- Weekday 2- Dr. Radhakrishna Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 2282 17:00 - 18:00 2825 17:00 – 18:00 Weekday 2 2259 17:00 - 18:00 2821 17:30 - 18:30
2W 4W Auto Truck
VENDOR SURVEY
Total
Vegetables Processing Bangles Total
Time Road Side Garments Shoes Electronics Bags Utensil Direction
& Fruits Food etc. Sum
Wise
LHS 4 2 0 0 0 0 0 0 6
12.00 10
RHS 3 1 0 0 0 0 0 0 4
LHS 6 2 0 0 0 0 0 0 8
3.00 15
RHS 6 1 0 0 0 0 0 0 7
LHS 6 2 0 0 0 0 0 0 8
6.00 14
RHS 5 1 0 0 0 0 0 0 6
LHS 2 2 0 0 0 0 0 0 4
7.00 8
RHS 3 1 0 0 0 0 0 0 4
9. Pedestrian ramps Nil Provided at cross roads to facilitate uninterrupted movement of pram and wheel chair
11. Tactile tile Nil Provided for full length to advise visually impaired people
PROJECT MANAGEMENT CONSULTANT
12. For Implementation of Smart City Mission Project
Cycle stand Nil Yes
Of Tumakuru City
Lead Consultant Associate Consultants
IDENTIFIED ISSUES AND THEIR SOLUTION
Sr No. Identified Issues Proposed Solution
1 Lack of proper footpath along the road Provision of dedicated footpath
2 Varying Carriageway width Uniform Carriageway Width proposed along the
road
3 Lack of disabled friendly facilities Provision of Ramps for easier movement of
wheelchair
4 Lack of amenities for Visually Disabled Proper provision of Tactile tile provided all along
the stretch
5 Non-availability of Road signages and marking Proper signages and road marking along the road
are provided
6 Open ended wires and cables along the road Provision of Underground ducting along the road
reducing the safety and aesthetics of road
7 Lack of pedestrian safety at crossing Provision of Raised pedestrian crossing is provided
Opp. Shimsha Media Links Infront of Jai Maruti Cold Storage Nearby Ganesh Bakery
Condition
Chainage (m)
Covered/Uncovered
LHS RHS
0-100 Covered Covered
100-200 Covered Covered
200-300 Covered Covered
300-400 Covered Covered
400-500 Covered Covered
500-600 Covered Covered
600-700 Covered Covered
700-800 Covered Covered
800-840 Covered Uncovered
840-900 Covered Covered
900-1000 Covered Covered
1000-1100 Covered Covered
1100-1117 Covered Covered
Composition of Traffic
3% 3%
7%
14%
74%
Two Wheeler Auto Rickshaw (Passenger) Car/ Van Auto (Goods)/ Mini LCV Cycle
13% 14%
72%
73%
Peak hour Traffic- Weekday 1- Kothitopu Road Peak hour Traffic- Weekday 2- Kothitopu Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 1547 11:15 - 12:15 1698 11:30 - 12:30 Weekday 2 1445 12:00 - 13:00 1372 12:00 - 13:00
2W 4W Auto
VENDOR SURVEY
Total
Vegetables Processing Bangles Total
Time Road Side Garments Shoes Electronics Bags Utensil Direction
& Fruits Food etc. Sum
Wise
LHS 3 0 0 0 0 0 0 0 3
12.00 3
RHS 0 0 0 0 0 0 0 0 0
LHS 3 2 0 0 0 0 0 0 5
3.00 6
RHS 1 0 0 0 0 0 0 0 1
LHS 3 4 0 0 0 0 0 0 7
6.00 9
RHS 1 1 0 0 0 0 0 0 2
LHS 1 4 0 0 0 0 0 0 5
7.00 8
RHS 1 2 0 0 0 0 0 0 3
8. Tactile tile Nil Provided for full length to advise visually impaired people
B/H District & Sessions Court Near DC office Near Satya Ganpati Temple
Composition of Vehicle
1%
2%
0%
7% 2%
24%
64%
Two Wheeler Auto Rickshaw (Passenger) Car/ Van 2 & 3 Axle Trucks Cycle
5%
27% 27%
64%
65%
Peak hour Traffic- Weekday 1- DC Office Road Peak hour Traffic- Weekday 2- DC Office Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 682 15:30 – 16:30 698 15:30 – 16:30 Weekday 2 739 15:30 – 16:30 815 15:45 – 16:45
LHS RHS 80
0-100 Covered NA 60
100-200 Covered NA 40
20
200-300 Covered NA
0
300-400 Covered NA <1 Hr 1 to 2hr 2 to 4hr 4 to 6hr 6 to 8hr >8hr
400-439 Covered NA 2W 4W Auto
VENDOR SURVEY
Total
Vegetables Processing Bangles Total
Time Road Side Garments Shoes Electronics Bags Utensil Direction
& Fruits Food etc. Sum
Wise
LHS 1 1 0 0 0 0 0 0 2
12.00 7
RHS 2 3 0 0 0 0 0 0 5
LHS 4 1 0 0 0 0 0 0 5
3.00 11
RHS 3 3 0 0 0 0 0 0 6
LHS 4 1 0 0 0 0 0 0 5
6.00 12
RHS 3 4 0 0 0 0 0 0 7
LHS 4 1 0 0 0 0 0 0 5
7.00 12
RHS 3 4 0 0 0 0 0 0 7
8. Pedestrian ramps Nil Provided at cross roads to facilitate uninterrupted movement of pram and wheel chair
10. Tactile tile Nil Provided for full length to advise visually impaired people
PROJECT
11. MANAGEMENT CONSULTANT
Cycle stand Nil Yes
For Implementation of Smart City Mission Project
Of Tumakuru City
Lead Consultant Associate Consultants
IDENTIFIED ISSUES AND THEIR SOLUTION
Sr No. Identified Issues Proposed Solution
1 Lack of proper footpath along the road Provision of dedicated footpath
2 Varying Carriageway width Uniform Carriageway Width proposed along the
road
3 Lack of disabled friendly facilities Provision of Ramps for easier movement of
wheelchair
4 Lack of amenities for Visually Disabled Proper provision of Tactile tile provided all along
the stretch
5 Non-availability of Road signages and marking Proper signages and road marking along the road
are provided
6 Open ended wires and cables along the road Provision of Underground ducting along the road
reducing the safety and aesthetics of road
7 Lack of pedestrian safety at crossing Provision of Raised pedestrian crossing is provided
Infront of SBI
Composition of Traffic
1% 1% 1% 1%
2% 1%
1%
16%
15% 61%
Peak hour Traffic- Weekend- Belgumba Road 2&3 Axle Truck Auto (Goods)/ Mini LCV Tractor
Cycle
Volume Peak Hr. PCU Peak Hr.
Weekend
1276 17:15 – 18:15 1353 17:15 – 18:15
18% 18%
57% 57%
17% 17%
Peak hour Traffic- Weekday 1- Belgumba Road Peak hour Traffic- Weekday 2- Belgumba Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 1604 17:15 – 18:15 1723 17:15– 18:15 Weekday 2 1629 17:15 – 18:15 1761 17:15 – 18:15
200
150
100
50
0
<1 Hr 1 to 2hr 2 to 4hr 4 to 6hr 6 to 8hr >8hr
2W 4W Auto Truck
VENDOR SURVEY
Total
Vegetables Processing Bangles Total
Time Road Side Garments Shoes Electronics Bags Utensil Direction
& Fruits Food etc. Sum
Wise
LHS 6 4 1 0 0 0 0 1 12
12.00 23
RHS 7 3 0 1 0 0 0 0 11
LHS 8 9 1 0 0 0 0 1 19
3.00 33
RHS 7 6 0 1 0 0 0 0 14
LHS 8 13 1 0 0 0 0 1 23
6.00 39
RHS 7 8 0 1 0 0 0 0 16
LHS 8 13 1 0 0 0 0 0 22
7.00 38
RHS 7 8 0 1 0 0 0 0 16
Composition of Vehicle
0% 0%1%
3%
7%
35% 54%
Two Wheeler Auto Rickshaw (Passenger) Car/ Van LCV Auto (Goods)/ Mini LCV Cycle
5% 7%
36% 53%
55% 35%
Two Wheeler Auto Rickshaw (Passenger) Car/ Van Two Wheeler Auto Rickshaw (Passenger) Car/ Van
Bus LCV Auto (Goods)/ Mini LCV Bus 2 & 3 Axle Trucks Auto (Goods)/ Mini LCV
Tractor Cycle Tractor Cycle
Peak hour Traffic- Weekday 1- Garden Road Peak hour Traffic- Weekday 2- Garden Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 679 10:30 – 11:30 793 12:00 – 13:00 Weekday 2 684 16:45 – 17:45 803 16:45 – 17:45
100
80
60
40
20
0
<1 Hr 1 to 2hr 2 to 4hr 4 to 6hr 6 to 8hr >8hr
2W 4W Auto Truck
VENDOR SURVEY
At present along this road there are only 6 vendors and that are of processing food
Composition of Traffic
1%
1% 2% 1% 2%
1%
24%
50%
18%
56% 56%
20% 20%
Two Wheeler Auto Rickshaw (Passenger) Car/ Van Two Wheeler Auto Rickshaw (Passenger) Car/ Van
Bus (Private) Bus (city) Bus (KSRTC) Bus (Private) Bus (city) Bus (KSRTC)
LCV Auto (Goods)/ Mini LCV Cycle LCV Auto (Goods)/ Mini LCV Cycle
Peak hour Traffic- Weekday 1- BH Road Peak hour Traffic- Weekday 2- BH Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 5467 12:00 - 13:00 6046 12:00 - 13:00 Weekday 2 5486 12:15 - 13:15 6099 12:15 - 13:15
2W 4W Auto
VENDOR SURVEY
Total
Vegetables Processing Bangles
Time Road Side Garments Shoes Electronics Bags Utensil Direction Total Sum
& Fruits Food etc.
Wise
LHS 1 12 0 0 0 0 0 0 13
12.00 15
RHS 0 2 0 0 0 0 0 0 2
LHS 1 12 3 0 0 0 0 0 16
3.00 18
RHS 0 2 0 0 0 0 0 0 2
LHS 1 12 3 2 0 0 0 0 18
6.00 25
RHS 0 7 0 0 0 0 0 0 7
LHS 1 21 4 2 0 0 0 0 28
7.00 37
RHS 0 9 0 0 0 0 0 0 9
Near NSK Stores Opp. Patanjali Mega Store Near Sha Stores
Condition
Chainage (m) Covered/Uncovered
LHS RHS
0-100 Covered Covered
100-200 Covered Covered
200-300 Covered Covered
300-400 Covered Covered
400-500 Covered Covered
500-600 Covered Covered
600-700 Covered Covered
700-800 Covered Covered
900-1000 Covered Covered
1000-1046 Covered Covered
Composition of Traffic
1% 1%
1% 2% 5%
15% 38%
36%
40% 41%
Peak hour Traffic- Weekday 1-Ashoka Road Peak hour Traffic- Weekday 2-Ashoka Road
Volume Peak Hr. PCU Peak Hr. Volume Peak Hr. PCU Peak Hr.
Weekday 1 4301 16:30 - 17:30 5927 16:30 - 17:30 Weekday 2 4442 13:00 - 14:00 6024 10:00 - 11:00
2W 4W Auto
VENDOR SURVEY
Vegetabl Total
Road side es & Processing Electronics & Bangles Direction
Time Fruits Food Garments Shoes Electrical etc. Bags Others Wise Total Sum
LHS 0 5 0 0 0 0 0 1 6
12.00 15
RHS 0 7 0 0 0 0 0 2 9
LHS 0 6 2 0 0 0 0 1 9
3.00 19
RHS 0 7 1 0 0 0 0 2 10
LHS 0 9 2 0 0 0 0 4 15
6.00 38
RHS 0 15 3 0 0 0 0 5 23
LHS 0 10 2 0 0 0 0 4 16
7.00 39
RHS 0 15 3 0 0 0 0 5 23
05:00 to 12:00 to
1 Chamundeshwari LHS 178 RHS 156
06:00 01:00
04:45 to 12:00 to
2 Dr. Radhakrishna LHS 423 RHS 264
05:45 01:00
9:30 to 4:30 to
3 Kothitopu LHS 366 RHS 344
10:30 5:30
10:00 to 12:00 to
LHS 476 RHS 396
4 DC Office 11:00 1:00