ELECTRIFIED DOUBLE TRACK PROJECT

UEM CONSTRUCTION BETWEEN

RAWANG AND IPOH (BALANCE OF WORKS)

REF NO:

Test Conducted For : TRACKWORK Welding machine model & no:

INSPECTION OF FLASH BUTT WELD JOINT Length of rail:

1. Location / Section : 4. Date Inspection :

2. Offset : 5. Line : Up / Down :

3. CH From : To 6.Panel length & no:

7.Depot / Site:

Alignment 1 meter straight edge Remarks


Chainage S.No Joint No Surface Condotion
Running Surface Gauge Face OK / NOT OK

+ 0.3mm 0.1mm + 0.3mm 0.1mm

3 measures required for each weld

1) The straight edge at the centre

2) The straight edge to one side of the weld

3) The straight edge to the second side of the weld

Supervising Consultant

Name : Signature : Date :

Contractor

Name : Signature : Date :

UEMC-F-TW001 Rev 0 Date: 01-06-05