1 DIGITAL MULTIMETER
2 IR TESTER
3 CONTACT RESISTANCE METER
4 BREAKER TIMING KIT
5 MILLIVOLT DROP TEST KIT
6 HV TEST KIT
7 PRIMARY INJECTION TEST KIT
9 GALVANOMETER
10 MICRO OHM METER
A. FEEDDER DETAILS :
FEEDDER NAME :
TYPE:
FEEDDER DETAILS :
A.1 Breaker Details:
(1) Breaker Dwg Ref. No:
(2) Breaker Sr. No:
(3) Make & :
(4) Breaker Rated & SC Current :
(5) Breaker Control Voltage:
A.2 Physical Verification of Panel & Breaker (To be carried out in Breaker Out Position) :
(1) BOQ Verification is done as per the Drawing and found no missing components in the Feeder(Y/N):
(2) All the Punch points observed during Shop Testing are attended to & Verified (Y/N):
(3) CBCT assembly is complete & wiring is checked as per the Dwg. (Y/N)
(4) Earth Bus is inter- connected throughout the board and earthed firmly @ both Ends (Y/N):
(5) Bus Bar is not connected to any I/C or O/g Feeder (Y/N):
(6) Interchangeability Check of Breaker Completed (After Checking Place the breaker in its original Feeder ) (Y/N) :
(7) Door Operation of the Panel checked and found to be smooth, without any obstruction (Y/N):
(8) Breaker In/Out Operation is smooth and no obstruction observed (Y/N) :
(9) Mechanical Interlocks of Breaker with Panel checked and found working properly (Y/N) :
(10) ON / OFF Operation of Breaker is checked from the Breaker PB and found working properly (Y/N) :
(11) Observe Shutter Operation during the Breaker Rack In & Rack out. The Shutter Operation (Rise / Fall) is norma
A.3 Contact Resistance Measurement of Breaker :
R Y B
Conclusion: (1) The Variation of Resistance wrt Factory Tests is within 5% (Y/N) :
A.4 Breaker ON/OFF/Trip Timing Test :
Change of State Time taken for Change (
From To R
Open Close
Close Open
Close -
Open
open
Conclusion:
(1) The Variation of time in between phases is within 3ms (Y/N) :
(2) The timings for Operations 'C' & 'O' are < 60ms (Y/N) :
(3) The Variation of Time from Factory tests < 2ms (Y/N) :
A.5 Insulation Resistance Test on Breaker :
Insulation Resistance in
Test
GΩ
R - Y+B+E
Y - B+R+E
B - R+Y+E
R
Y
B
Conclusion: All the IR Values are above 50MΩ (Y/N) :
B.4 Winding Resistance of CT Cores :
Phase 1S1-1S2 2S1-2S2 3S1-3S2
R
Y
B
Conclusion: (1) The Variation of Resistance between phases is within 5% wrt Factory Test reports (Y/N) :
B.5 CT Ratio Test
Current in Primary Current in Secondary
Phase
(Applied) (Measured)
25% : A
50% : A
R
75% : A
100% : A
25% : A
50% : A
Y
75% : A
100% : A
25% : A
B
50% : A
75% : A
B
100% : A
Conclusion: The Ratio Errors are with the Tolerance of Accuracy (Y/N) :
B.6 Knee Point Voltage Test
Winding Current Current Current
Phase CT Sr No Secondary Terminals
Resi @Vk/4 @Vk/2 @3Vk/4
Specified Vk = V
Conclusion: The Knee point voltages for the CT's are above the specified Vk.
C. TESTS ON POTENTIAL TRANSFORMERS
Make of PT's:
Model :
No of Cores :
C.1 PT Details:
PT Ratio:
Burden :
Type :
C.2 Visual Check on PT’s:
(1) All the CT's are checked visually and found no Crack, damage or dents on the Body of PT's. (Y/N) :
(2) Polarity Marking, Name Plate are legible on the PT's (Y / N) :
(3) Core Continuity is checked and no Shorting observed with adjacent cores (Y/N) :
(4) Mounting of PT found to be firm & No loose /missing h/w (Y/N) :
(5) PT Polarity Checked & found to be as per the marking (Y/N) :
(6) Factory Calibration Reports are available and reviewed for correctness of phase -wise assembly (Y/N) :
(7) PT Fuses are checked for Continuity & Rating (Y/N) :
C.3 Insulation Resistance Test on PT's :
P to S1 to S2 to S3 to
Phase (E+S1+S2 (E+P+S2+ (E+S1+P+ (E+S1+S2
+S3) S3) S3) +P)
R Phase
Y Phase
B Phase
Conclusion: All the IR Values are above 0.3 G Ω (Y/N) :
C.4 PT Ratio Test
Applied V/g Measured V/g on Sec -1 Measured V/g on Sec -2 Measured V/g on Sec -3
on Primary
Phase (Ph-Ph) Ph-Ph Ph-N Ph-Ph Ph-N Ph-Ph Ph-N
Conclusion: The Ratio & Polarity of PT's are checked and found to be correct (Y/N) :
D. Operational Checks on Power / Auxiliary Contactors, Auxiliary Relays
D.1 Pickup / Drop Checks on the Power / Auxiliary Contactors, Relays :
Note: Withdraw Power & Control Supply to the panel and check by applying voltage across Coil terminals.
Continuity
Pickup &
Model / Coil V/g of O/p Remarks
Sr No. Drop
Type Ref. (Spec) Contacts (If Any)
Voltages.
OK (Y/N)
Conclusion: The Contactors, Auxiliary Relays are checked for ON/OFF Operation and found to be working properly (
E. TESTS ON ANNUNCIATORS & INDICATORS
E. 1 On/Off Checks on Annunciators & Indicators
On/Off Legend as Colour as
Indicator Remarks
Sr No. Check OK per dwg per Dwg
Type (If Any)
(Y/N) (Y/N) (Y/N)
Conclusion : All the Annunciators & Indicators are checked & found to be working properly (Y/N):
F. TESTS ON METERS & TRANSDUCERS
F.1 Operational Checks on Panel Mounted Meters & Transducers
Aux Supply
Make
V/g
Conclusion: Overcurrent, Earth Faults, CB Fail to Trip Protections are checked and found to be working Normal.
I. CHECKS ON BUS BAR ASSEMBLY (For the Board)
I.1 Bus Bar Assembly Checks :
(1) All the Sections of the Bus Bar are completely assembled for the HT Switchgear Board(Y/N):
(2) All the H/w with necessary washers are assembled completely (Y/N) :
(3) Torque Setting of each H/w is done and marked (Y/N):
(4) Straightness, Orientation (Face matching), Phase marking of each Bus Bar is checked and found to be proper (Y
(5) Shrouds (wherever applicable) are put along the length of the Bus Bar (Y/N):
(6) Contact of PT Studs, Earthing Studs with Bus bar Assembly is firm (Y/N) :
(7) Min 50mm Ground Clearance from Main Bus bar tapping to CB to CT Circuit to O/G Terminals is Checked & Con
I.2 Bus Bar Millivolt Drop Test :
Conclusion: All the Joints are firmly Connected and No Loose Contact or Hot Spot observed (Y/N) :
I.3 Bus Bar Insulation resistance Test (Before & After HV):
R to Y to B to
Y+B+E R+B+E Y+R+E
Conclusion: Insulation Resistance of all phases of the Bus bars is found to be above 50 MΩ (Y/N):
I.4 Bus Bar HV Test (@ 80% of Factory HV Test Voltage, 1min) :
Test Time
Phase
Voltage applied
R to
Y+B+E
Y to
R+B+E
B to
Y+R+E
Conclusion : The Board has passed the HV Test Successfully (Y/N):
J. FINAL CLOSING CHECKS (For the Feeder)
(1) Checking for all the control Fuses & Links for Rating & Continuity is complete and found to be Correct (Y/N) :
(2) Overall Interpanel Wiring & Continuity is checked & Confirmed to be correct as per the Dwg (Y/N) :
(3) Cleaning & Dressing of wiring at Site is completed (Y/N) :
(4) Mechanical Closing of Panel like Door, Gland Plate etc. is completed (Y/N) :
(5) Upstream Breaker Closing Scheme checked thoroughly and confirmed for operation (Y/N) :
(6) Scheme & Meters in LPBS (If any) are checked for Operation & found to be working Normal (Y/N) :
(7) Final Cleaning of the Panel Internals is completed (Y/N) :
(8) Cable Termination (Both Sides) for the Feeder is checked for trial & is found to be ready (Y/N) :
(9) Provision of proper final Supports for the Cables are completed (Y/N):
(10) Control Circuit Wiring is checked for any faults & found to be normal (Y/N) :
Conclusion: The feeder is ready for Charging along with the Board (Y/N) :
Observations (If Any) :
LT SWITCH GEAR
ING:
MENTS
CALB DUE
MAKE MODEL RANGE
DATE
RATING (V/KW/AMP):
ition) :
e Feeder(Y/N):
(Y/N):
Spring
Tripping
Closing Coil Charging
Coil
Resistance Motor
Resistance
Resistance
Accuracy Class:
Insulation Class:
R Ph. CT Sr no. :
Y Ph. CT Sr no. :
B Ph. CT Sr no. :
Application :
of CT's. (Y/N) :
e assembly (Y/N) :
st reports (Y/N) :
of PT's. (Y/N) :
e assembly (Y/N) :
Polarity Observatio
Check ns
ss Coil terminals.
Acceptable
(Y/N)
proper (Y/N):
Trip from
ELR OK ELR
Observatio
Acceptable
ns
(Y/N)
(Y/N)
Set Voltage 1 2 3
Pickup
Voltage
Drop
Voltage
Trip Setting Actual
to be working Normal.
d(Y/N):
d and found to be proper (Y/N):
Variation Observatio
ns (If Any)
< 5%
ed (Y/N) :
IR > 50MΩ
(Y/N)
MΩ (Y/N):
nd to be Correct (Y/N) :
he Dwg (Y/N) :
Y/N) :
Normal (Y/N) :
ady (Y/N) :