Critical Success Factors for Improving Decision Quality on Collaborative


Design in the IC Supply Chain

Article · January 2009

CITATIONS READS

10 351

2 authors, including:

Jei-Zheng Wu
Soochow University, Taiwan
45 PUBLICATIONS   456 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

The Effectiveness and Validation Scheme on Multiple Criteria Decision Making Approaches and its Applications to Production and Inventory Planning View project

All content following this page was uploaded by Jei-Zheng Wu on 29 November 2014.

The user has requested enhancement of the downloaded file.


Journal of Quality Vol. 16, No. 2 (2009) 95

Critical Success Factors for Improving Decision


Quality on Collaborative Design
in the IC Supply Chain
Jei-Zheng Wu* Chia-Yu Hsu

Department of Industrial Engineering and Engineering Management,


National Tsing Hua University, Taiwan

(Received 10/2008; Revised 12/2008; Accepted 01/2009)

Abstract

Because the design process of Integrated Circuit (IC) product is knowledge-intensive and
time-consuming, the collaboration among IC designers and manufacturers is crucial for reducing time to
market of designing product. To enhance the quality of manufacturing strategic decisions for collaborative
IC design, manufacturing practices must be identified as the core elements of manufacturing strategy.
However, little research has been done regarding the essentials of implementing collaboration among IC
designers. This study aims to clarify terminology of decision quality in manufacturing strategy and define
Critical Success Factors (CSFs) as manufacturing practices for improving decision quality on collaborative
design in the IC supply chain through comprehensive literature review. Moreover, this study proposes a
framework in which the CSFs can be identified for different parties in IC supply chain.
Keywords: decision quality, collaborative IC design, critical success factors, manufacturing strategy, supply chain

time-consuming. IC design requires not only


1. INTRODUCTION fundamental understanding of circuit operation but
Integrated Circuit (IC) design, which also expert knowledge of performance tradeoffs.
embodies the main functions of signal processing Time-consuming experiments and simulations are
for electronic applications, is one of the most key required to consider specification constraints while
industries in semiconductor manufacturing. optimizing multiple criteria such as open-loop
Particularly, the IC fabless (fabrication-less, voltage gain, power dissipation, input range, output
namely stand-alone design house) industry has swing, offset voltage, common mode rejection
contributed 15.5% and 16.4% of total ratio, power supply rejection ratio, unity-gain
semiconductor industry growth, with achieving a bandwidth, phase margin, input-referred noise,
stable growth rate in 2004 and 2005, respectively settling time, and slew rate in an operational
(Liu, 2006). Notably, IC design requires a longer amplifier (op-amp) design (Geppert, 1999).
lead time than manufacturing, and thus has a great Performance trade-offs require intensive
impact on time-to-market, the cycle time between computation owing to their nonlinear nature and
product conception and fulfillment (Kim et al., the complexity increasing exponentially with
1999). advances in technology. Moreover, the design is
However, IC design is difficult and getting harder when it moved toward Analog and

*
Correspondence: Department of Industrial Engineering and Engineering Management, National Tsing Hua University
101, Section 2, Kuang-Fu Road, Hsinchu 30013, Taiwan, R.O.C.
E-mail: d907804@alumni.nthu.edu.tw
96 Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain

Mixed-Signal (AMS) and Radio Frequency (RF) Consequently, a decision is always coincided with
IC design (Leenaerts et al., 2001). Indeed, analog an issue or problem. Once a problem is perceived,
devices are typically very large to enable them to an effective action must be taken to handle it. In
handle large currents and guarantee precision principle, we would utilize different tools for
among continuous parameters. Furthermore, different situations so as we would apply different
analog circuits resist technology migration solution strategies for different problems. Decision
resulting from tight dependence on the wafer problems can be identified by distinguishing
fabrication (fab) process. Design and verification factual and value elements (Simon, 1997). In
thus become increasingly complex and particular, the factual premise addresses causations
time-consuming. Although numerous studies have among variables that are objectively true or false
been done regarding cycle time reduction and whereas the value premise depicts decision
productivity in semiconductor manufacturing, few maker’s subjective preferences.
studies have examined the effectiveness and The classification of decision problems starts
efficiency of IC design. from March and Simon (1958) in which problems
This study investigates Critical Success were defined as two extreme types: programmed
Factors (CSFs) for improving decision quality on and non-programmed. Thompson and Tuden (1959)
collaborative design in the IC supply chain via further classified four types of decision problems
comprehensive literature review. Specifically, this according to differences in the certainties or
investigation examines relevant methodologies, uncertainties of causation and preferences which
developed tools, application frameworks, and correspond with factual premise and value premise,
system architectures. The collective outcomes can respectively. Each dimension constitutes a
help achieve effective and efficient IC designs in continuum between certainty and uncertainty
the area of robust design; that is specification whereas Thompson-Tuden focuses on the extremes
conformance for a plurality of process conditions for ease of discussions. Regarding the uncertainty of
and parameters, verification and revision cycles causation, sometimes we are not sure about what the
reduction, elimination the loops of within and effect or how much the payoff would be by given
between designs, short yield ramp-up duration for alternatives to be chosen as shown in Figure 1. That
manufacturing. is, uncertainties of causation are analogous to
unpredictability of outcome. Uncertainties in
causation are often resulted from complexity, lack
2. DECISION MAKING of information or information being too expensive
Decision making is a process of commanding to acquire, and system variation. On the other hand,
or performing activities with choices for a uncertainties of preferences occur whenever there
particular purpose. A decision is made by a are non-commensurable objectives. Specifically,
decision maker who is an individual or a group of two objectives are commensurable if both can be
people in an organization. According to the theory measured in the same units; non-commensurable,
of bounded rationality (Simon, 1955), a decision otherwise. For example, preferences over high profit
maker is presumably “subjectively” rational since and low cost are commensurable since both can be
a decision maker is somehow lack of information measured in monetary units and attained
and thus the choice is made based on the decision simultaneously. In contrast, preferences over high
maker’s experience. However, unlike an quality and on-time delivery are clearly
administrative man (Simon, 1997) who “selects the non-commensurable since achievement of one
first option that meets a given need or selects the objective can not compensate failure of another
option that seems to address most needs rather than (Thompson, 1964).
the ‘optimal’ solution,” a decision maker tends to Thompson-Tuden typology suggests a
structure a decision for capturing a satisficing strategy for each of the problem types as shown in
alternative subject to the limited resource. Figure 2. The well-structured problem is a
A decision occurs and raises attention programmed one and presumes practicable
whenever there is a difficult and important choice information acquisition and computation time in
to be made (Thompson, 1964; Smith, 1988). the strong sense (Thompson, 1967; Simon, 1973).
Journal of Quality Vol. 16, No. 2 (2009) 97

Figure 1. A decision-making flow incorporating causation and preference

Figure 2. Thompson-Tuden typology

Most of well-structured problems can be solved via accommodation of conflict objectives. Practicable
routine, standard operating procedures, specialists approaches include compromise, competition,
about particular actions, operations research, and bargaining, co-optation, and coalition (Thompson,
computer programs (March and Simon, 1958). The 1964). Recent development has gone to specific
rest of the problems are those non-programmed tools for particular applications including multiple
and ill-structured (March and Simon, 1958; Simon, objective programming (Weber and Current,
1973). For the semi-structured unpredictable 1993), goal programming (Buffa and Jackson,
problem, a decision maker would require expert 1983), Analytic Hierarchy Process (AHP) (Saaty,
judgment to fill the gap between causes and effects 1990), Data Envelopment Analysis (DEA)
(Pearl, 2000; Hoover, 2001; Woodward, 1997; (Charnes et al., 1978; Banker et al., 1984), and
Cartwright, 2003, 2004). Investigating complex Simple Multiattribute Rating Technique (SMART)
causation among huge amount of variables from (Edwards and Barron, 1994). For more details and
raw data comprises three steps: (1) exploring specific usage, please refer to Wang (2004). The
suspicious causes, (2) screening off spurious suggested strategy for the unstructured problem is
associations, and (3) discovering and structuring to wait for inspiration. When there is additional
causes. Each step can be facilitated by qualitative knowledge in causality or preference
and quantitative aids including Humean tradition, accommodation, the unstructured problem will be
subjective judgment, causal diagram, temporal able to transform into a semi-structured problem
information, conditional probability, structural and then be solved. It always needs wisdom and
equation, and intervention estimation. patience to find a satisfactory solution for this
When dealing with the semi-structured problem type. Nevertheless, the well-structured
tradeoff problem, the best solution would be problem is the desired end of all types of problem
98 Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain

(Mao, 2003). When a solution is proposed, the strategy should be carefully designed and
solved problem is somehow transferred to a formulated to constitute the corporate operation
well-structured one. What matters is the model with strong resources and capabilities. On the
effectiveness of the transformation. Nevertheless, other hand, implementing the corporate operation
the quality of decision-making is not well defined model will seek to achieve intended objectives
in the research of decision sciences. Thus, this through complex effects of realized actions. The
study aims to clarify and identify terminology of process of manufacturing strategy is illustrated in
decision quality in manufacturing strategy. Figure 3. Briefly speaking, manufacturing objectives
are “what a company can express in front of
3. MANUFACTURING customers for sustainable competitive advantage”
whereas manufacturing practices are “what a
STRATEGY FOR IMPROVING
company has to do to achieve the former.”
DECISION QUALITY Manufacturing strategic decisions generally
Strategy is a series of long-term, pervasively involve multiple manufacturing objectives to
influential, extensively premeditated, and achieve simultaneously that often conflict with
practically rehearsed actions aiming at particular each other when the resource is limited. Similarly,
objectives. Since the situation varies from minute in decision-making problems, to elicit preferences
to minute, it is not possible to a priori arrange a among objectives is crucial to make a decision
plan of actions in great detail. For this reason, a successful. For higher level of manufacturing
strategy adaptively conducts guides rather than a objectives achievement, manufacturing practices
set of rigid instructions in contrast to tactics or have to be done by virtue of activities in reality as
operations. Consequently, adaptability, abstraction, choices among alternatives in decision making.
and conceptualization reduce complexity so that a Finally, manufacturing performance measurement
whole picture of how to achieve the final goal can ensures that the effects of manufacturing practices
be drawn premeditatedly. on manufacturing objectives are measurable and
On the other hand, manufacturing strategy is a operational so that controlling or intervening
strategy that utilizes manufacturing functions to manufacturing practices could meet intended
achieve strategic objectives based on a sequence of purposes. In conformity with decision making,
decisions over time for customer satisfaction examining causal relationships among variables a
(Skinner, 1969; Hayes and Wheelwright, 1984). priori in terms of metrics is fundamental to assess
Manufacturing strategy comprises decision-making effects and then predict consequences and thus
problems in terms of manufacturing practices to make a clever choice. To enhance the quality of
achieve manufacturing objectives through linkages manufacturing strategic decisions, Chien and Wu
of performance measurement. It is in conformance (2007) defined the spectrum of problem-structuring
with corporate strategy, business strategy, and in light of structure level and thus proposed a
marketing strategy (Leong et al., 1990; Dangayach decision analysis framework as a guide for
and Deshmukh, 2001). In order to achieve modeling various problems with respect to the
sustainable competitive advantage, a manufacturing spectrum.

Figure 3. Manufacturing strategy process


Journal of Quality Vol. 16, No. 2 (2009) 99

Figure 4. Simple causality between revenue and cost

Commonly, a company seeks long-term can be specified as well. For example, investments
profitability by maximizing revenue, the product of in expensive equipment are not objectives but
selling volume and unit price, and minimizing total means to satisfy demand. However, this means must
cost. Indeed, the causal relationship between be able to link with the manufacturing objectives so
revenue and cost can be complicated. For example, that effort will not merely produce cost. For
a customer-driven company may try to minimize example, Wu and Chien (2008) developed a
total cost so that it can offer wider range of prices decision framework in which preference over
for customers. The simple causal relationship vendors at strategic level and order allocations at
between revenue and cost can be shown in Figure operational level can be integrated to evaluate
4. Consequently, the company may lower prices to vendor performance, allocate the orders, and
gain more selling volume. Thereby, profit could be generate the associated material requirement
increased with proper price setting. planning reports for semiconductor assembly.
However, multiple factors such as quality and To sum up, decision quality for manufacturing
delivery may also influence price other than cost. systems such as IC design and semiconductor
For example, strategic objectives, including price, manufacturing can be defined as follows. First of
quality, delivery, flexibility, service, company status all, a “good” decision must be able to a priori
and relationship, and technology and collaboration structure causal relationship among decisions in
have been discussed in the literature (Skinner, 1978; light of objectives, practices, and performance
Leong et al., 1990; Hayes and Wheelwright, 1984; measurement based on facts and preferences. A
Hill, 1995; Gerwin, 1987; Miller and Roth, 1994; decision can thus be structured as an
Miltenburg, 1995; Flynn et al., 1999; Frohlich and “unstructured”, “semi-structured unpredictable”,
Dixon, 2001). Manufacturing practices are one of “semi-structured non-commensurable”, or
the core elements of manufacturing strategy that “well-structured” problem which corresponds to
affect the ability of the firm to meet long term appropriate solution strategy. Secondly, a decision
objectives (Skinner, 1969; Hayes and Wheelwright, can be evaluated according to the objective
1984; Fine and Hax, 1985). These decisions are hierarchy formulation which ensures top-down
often cross functions. Manufacturing performance decomposability, bottom-up collectively
measurement ensures that the effects of exhaustiveness, mutually exclusiveness in the
manufacturing practices on manufacturing same level, and criteria collection being complete,
objectives are measurable and operational so that measurable, non-redundant, and minimal (Chien,
controlling or intervening manufacturing practices 2005). Finally, the structure of the decision model
could meet intended purposes (Kaplan and Norton, should be as stable as possible so that outcomes of
1992; Kaplan and Norton, 2001). Since the causality decision execution can be predictable.
is complex, competitors in the same market may
thus find their niches (Porter, 1985). Figure 5
4. THE EVOLUTION OF IC
depicts a more detailed version of causality between
revenue and cost with manufacturing objectives as SUPPLY CHAIN
the immediate source of revenue and manufacturing During the 1980s, Integrated Device
practices as the source of cost. In this way, the Manufacturers (IDM) for Application Specific ICs
immediate sources of revenue and cost can be (ASIC) dominated IC manufacturing. After Taiwan
explicitly identified and their influence relationship Semiconductor Manufacturing Company Ltd.
100 Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain

Figure 5. Illustrative manufacturing strategy causality

(TSMC) initiated foundry services in 1987, fabless supplied IP components such as soft kernel, hard
companies with design know-how were able to sell kernel and software technology, began to emerge,
products without needing to own expensive and the IC design industry disintegrated into three
manufacturing facilities, whereas foundry main business areas, namely IP component, IC
companies focused on providing specialized fab product design, and IC design services. Among
services. With the growing complexity of IC these areas, foundry companies could not only
design and semiconductor manufacturing, IC provide manufacturing services but could also
designers were forced to devise more complicated expedite design migration in silicon IP cores (Shih
systems and circuits on a single chip of silicon et al., 2008). Presently, it is impractical for IC
with terminology of System on Chip (SoC) to meet design houses to develop all components and tools
customer requirements within an acceptable without relying on core technologies provided by
timeframe. SoC technology integrated various third-party IP providers, including design service
components, including digital applications such as providers, pure IP providers and EDA tool
logic, memory, CPU, and analog, into a single chip providers. Consequently, currently IDM, IP,
(Leenaerts et al., 2001). Generally, silicon fabless, system, foundry, assembly and testing
Intellectual Property (IP) were traded and companies are performing respective services and
assembled as part of the implementation of SoC. interacting as shown in Figure 6.
Specifically, IP appears to be a buyable and
reusable know-how technology that can broadly
take the form of algorithms, software, designs, 5. CRITICAL SUCCESS
models, test benches, or methodologies in a broad FACTORS FOR
sense. In a narrow sense, IP represents a virtual COLLABORATIVE DESIGN IN
component with well-defined functions, method of
use, and tools to support its usage (Gajski et al.,
THE IC SUPPLY CHAIN
2000). In the late 1990s, IP providers, who Collaboration in the IC supply chain is various.
Journal of Quality Vol. 16, No. 2 (2009) 101

Figure 6. The evolution of IC supply chain

To derive complementary technologies for technologies, and use automated procurement as


developing complete design solutions for the interface for equipment purchasing.
customers, most third-party IP providers with Meanwhile, equipment suppliers use remote
different IP technologies and cores have begun to diagnosis and perform trouble shooting if
collaborate with one another. Su et al. (2005) necessary. Typically, the collaboration mechanism
addressed four reasons for collaboration among between foundry and fabless design houses is built
third-party IP providers. First, IC design houses by the main foundry companies, such as TSMC
require different IP and complementary technology and United Microelectronics Corporation (UMC)
to reduce design time and get complex circuits (Fang, 2004). These collaborations can be further
working. Second, fabless design houses require IP classified into design collaboration, engineering
modules and downstream supporting services to collaboration, and logistics collaboration. The
implement IP. Third, IP is verified by other design collaboration mechanisms focus on
third-party IP providers or foundry companies to supporting customers (namely, fabless or IDM) in
ensure the higher reusable probabilities and fitness. accessing completed and accurate information at
Fourth, to devise a complete collaboration strategy, each step of the design process, including design
IC design houses frequently release IP requests to rule, SPICE model, tape-out, i.e. writing the final
promise whole solutions for customers. In detailed data file on the magnetic tape, and so on
addition, the ASIC service process distinguishes (Macher et al., 2002; Su et al., 2005). The
collaboration between foundry and Design Service engineering collaboration mechanisms between
Providers (DSP) among four phases: business fabless design houses and foundry focus on solving
negotiation, design, pre-production, and different yield challenges at different stages of
production; the IP development process begins process technology (Su et al., 2005). Logistical
with business negotiation and priority setting. collaboration between foundries and fabless
Based on the files provided by foundries, DSP then designers can be divided into three layers, namely
establish process-related IP libraries. Moreover, a manufacturing service layer, business process
equipment suppliers co-work with foundry service layer, and infrastructure layer, to serve different
providers to design new tools for advanced binding procedures, including naming mapping,
102 Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain

business processes binding, resource reservation introduced IP creation, IP conversion, and the
binding and manufacturing service management necessary infrastructure. Moreover, Schindler et al.
binding (Su et al., 2004). (1999) devised a web IP reuse infrastructure for
For collaborative design in the IC supply use by IP providers and IP consumers in
chain, firstly, Computer-Aided Design (CAD) and exchanging, searching, selecting, depositing, and
Electronic Design Automation (EDA) based on sharing design IP.
expert knowledge were essential and then To facilitate the initialization and
developed to make intelligent choices among fixed modification of circuit design and layout, several
circuits and common analog blocks that were studies have focused on design optimization. For
stored in the knowledge base where users simply example, Jingnan et al. (2001) applied simulated
inputted the performance specifications and the annealing, together with heuristic based rules, for
parameters of the fab process to be used without constraint generation, to parameterized circuit
fully understanding their operation, and the system descriptions. Moreover, Bűrmen et al. (2003)
then designed matching analog circuit modules proposed a simple mathematical formulation along
(Sheu et al., 1988; Carley and Rutenbar, 1988). with heuristics for ease of computation. To enable
Afterward, engineers started to reuse and configure full circuit simulation of each circuit candidate,
existing circuits instead of redesigning a full circuit Phelps et al. (2000) developed an efficient and
typology every time. As a consequence, robust numerical search algorithm combining the
reconstruction techniques came into being (Fung et population-of-solutions ideas from evolutionary
al., 1989). Based on a database of established algorithms with a novel variant of pattern search,
knowledge that provides both flexibility in design and which supported transparent network
and savings in data space, the basic reusable parts parallelism. Moreover, Geometric Programming
of a circuit can be replaced or reused with (GP) was applied to IC design optimization
corresponding functions to reflect the circuit automation for globally optimal tradeoffs among
changes, Accordingly, data management systems competing performance measures (Hershenson,
were specified by using distributed techniques and 2001). GP utilized the capability of the
hierarchical data representation for efficiency and interior-point method for optimization, without
dynamic configuration to store large amounts of human intervention, subject to special types of
schematic and multiple-fixed-architecture design constrains or specifications, namely monomial and
records and rules (Cao et al., 1991; Milo and polynomial inequalities. The analytical expressions
Nehab, 1991; Cottrell and Grebinski, 2003). for the constraints and specifications can be
Actually, platform, synthesis, and reuse partially automated by utilizing symbolic circuit
methods were originally proposed as a means of simulators. Owing to the link to an automatic
filling the gap between silicon capacity and design layout program, it has been suggested that the tool
ability (Gajski et al., 2000). In particular, in the can generate mask designs directly from op-amp
reuse method, the SoC designs or technologies specifications. However, modeling abstractions,
were assembled using different IP provided by scalar weight settings, and design rules continue to
several IP providers. The reuse method can be used be based primarily on human expertise. Restated, a
to form a whole model, known as the IP business knowledge-based system capable of adapting to
model, in the semiconductor industry. There were meta-modeling would be beneficial to facilitate
three major players in the model. Firstly, IP parameter setting.
integrators, typically designers in system houses, The rapidly increasing complexity of IC
provided design services. Secondly, IP tool design requires a design system architecture or
developers supported IP development and system platform that supports highly efficient and
integration for IP providers and IP integrators. high-quality sharing of IC design data. An
Thirdly, IP businesses, including IP distribution, Application Programming Interface (API) to a
service, and trade, affected not only bilateral standard Information Model (IM) that provides
contract negotiation but also multiple-party access to a shared database is essential to
negotiations among IP providers and consumers. In contemporary IC design systems. These design
relation to IP reusability, Savage et al. (2000) data in API should be standardized across the IC
Journal of Quality Vol. 16, No. 2 (2009) 103

CAD industry so that design systems can XML-based information repository that can update
efficiently draw from best-of-class applications itself to reflect changes in the related data sources.
from all sources in the EDA industry. An IM for Additionally, XML-based search tools facilitate the
design data defines the semantics of, and finding of information by utilizing data structure
relationships between, circuit elements (and the and metadata rather than keywords and text. To
various views of the data) that are to be achieve active collaboration and participation
implemented as a programmable package and among design teams, Hekmatpour’s XML-based
made publicly visible in the API (Blanchard et al., system provides interactive consultation in which a
2002). OpenAccess is an open industry data model forum, chat, whiteboard, conferencing mechanism,
and API for IC design tools along with a and peer-to-peer point of service. The interactive
designated database (Blanchard et al., 2002). A consultation mechanism also ensures that expertise
group of mainstream companies within the IC and proprietary data remains local and only related
supply chain sponsored its development, together design files are exchanged via the secure XML
with a similar effort aimed to markedly improve containers.
cost and efficiency for IC photomasks. Also, using As mentioned previously, design, engineering,
a common data model and data access language, and logistics collaborations respond to low cost
the Universal Data Model (UDM) spanned both and yield guarantee for fabs during the early stages
the design and mask-making communities, and had of design. In fact, fab design is considered a subset
potential to expand into the fab community of design for manufacturing, which also involves
(Cottrell and Grebinski, 2003). This new paradigm the concepts of design for assembly and design for
can provide the industry with a direct link for test (Shepherd, 1996). In particular, corresponding
communicating information across gaps between assembly and testability features can be not only
design and manufacturing. While minimizing the applied to reduce part count, manufacturing
impact on applications of its use, this paradigm complexity, and assembly cost but also enable easy
supports a graceful migration via translation from validation of design robustness.
existing stream files, and provides extensibility and Therefore, according to above IC design
support of future innovations. evolution and collaboration discussed, this study
Hekmatpour (2005) patented an XML-based identifies the following CSFs of collaborative
system for collaborative design and verification of design in the IC supply chain.
SoC. This invention enabled sharing of design data ● authorization and security – controlling access
from SoC among various design tools and to critical know-how
applications by utilizing a mechanism for data ● CAD and EDA tools – enabling design
conversion and analysis. The invention specified automation
centralized access authorization and security ● co-design of equipment and tools – focusing
requirements beyond generic web protocols for a on design and manufacturing with more complex
secured, collaborative and distributed environment. and specific objectives
Specifically, the Internet-based SoC design ● communication technology – contributing to
framework utilized a SoC extensible markup fast remote and online operations
language for cross-interaction among design teams ● database management – handling large
using different tools. For platform-independent amounts of design and engineering data
application and service exchange and sharing, an ● data format, transformation, and interface -
XML-based object is produced and delivered to ensuring data interchange between different
clients and users via design services. As a control platforms or systems
tower, the Virtual Database Management System ● design for manufacturing – considering
(VDBMS) takes data from numerous different manufacturing-related variation and anticipating
sources and creates a single relational database production features
interface for all these data sources. Finally, a set of ● design optimization technique – accelerating
transformation rules based on XSL is developed to initialization and modification of design
extract information on demand and publish that ● information sharing mechanism – contributing
information. The resulting environment is an to earlier common consensus and minimizing
104 Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain

Figure 7. Proposed framework for promoting collaborative IC design

duplicated work and rework as system vendors, manufacturing equipment


● interactive consultation mechanism – utilizing providers, photomask manufacturers, and so on,
human expertise based on communication since they are either unrelated to collaborative IC
technology to produce more optimized designs design or considered integral to certain stages
● IP reuse – facilitating IP creation, conversion, based on the literature review and present industry
and integration status.
● knowledge-based system – adapting to and
referring to expert knowledge in relation to
initial design, maintenance, and reproduction 6. CRITICAL SUCCESS
● strategic alliance, community, and coalition – FACTORS AS
supporting and providing standards, consistency, MANUFACTURING PRACTICES
and agreement regarding design system
FOR IMPROVING DECISION
integration
Therefore, based on the summarized CSFs,
QUALITY
this study proposes a framework for promoting In the semiconductor industry, some
decision quality while implementing collaborative applications have already occurred to support
design in the IC supply chain as shown in Figure 7. collaboration among fabless and foundry companies.
The proposed framework correlates different These applications can exchange information
stages of the supply chain with CSFs for regarding the timing and content of product design
collaborative IC design. The framework suggests and the real time manufacturing process via the
that each CSF should be implemented in at least Internet, and can also share technology knowledge
one company in a certain stage, across companies (Yu and Huang, 2001). For example, TSMC provided
within a stage, or across stages. Subsequently, the eFoundrySM service, which can assist designer
supply chain players can easily identify themselves effectively across design, engineering and logistic
and check whether a required CSF has been collaboration (http://www.tsmc.com). UMC also
implemented. For example, IP providers should developed the virtual foundry consultant, which can
ensure IP reusability. However, reuse mechanism help customers design and obtain the lot status
and infrastructure are concerns for fabless and fab (http://www.umc.com). The IC Designer makes
companies. The application is not limited to allowance for on-line chip size and cost estimation of
disintegrate virtual enterprises. The collaborative various feature sets. Furthermore, the success of EDA
design necessities are similar across independent tools and collaborative IC design relates to the close
units in IDMs. Notably, the proposed framework relationships among industry participants. For
ignores several players in the IC supply chain, such example, the OpenAccess is co-developed by
Journal of Quality Vol. 16, No. 2 (2009) 105

companies and institutions forming OpenAccess on evaluation and clarification of each process and
Coalition sponsored by Silicon Integration Initiative, to proceed with calculation of the overall ratings
Inc. (Si2), an organization comprising leading summarized from individual scores. The decision
companies in the semiconductor, electronic system, analysis process is recursive to identify the
and EDA tool industries (http://www.si2.org). problem nature and construct the conceptual
Through collaboration, the industry can achieve high framework for approaching a decision problem.
SoC integration while reducing the cost, improving According to the UNISON framework, a
the quality, and complexity of integrating future decision-maker, i.e., a party in the IC supply chain,
design systems. Powerful economic and market can structure its own decision problem with
forces are fueling demand for the rapid integration causality and preference where alternatives,
and delivery of single chip solutions in a namely manufacturing practices, are the CSFs
multi-vendor environment. Si2 claims to be uniquely discussed within the proposed framework.
positioned to facilitate collaboration via a strong,
implementation focus driven by member companies.
Indeed, these CSFs are manufacturing 7. CONCLUSIONS
practices for improving decision quality for IC
This study clarified the terminology of
design collaboration which eventually influence
decision quality in manufacturing strategy and
manufacturing objectives. For example, most of
identified the CSFs of collaborative IC design.
the CSFs such as CAD and EDA tools, design
Added to this, we propose a framework for
optimization technique, and IP reuse can be utilized
improving decision quality while implementing
to shorten deliver time and ensure design quality.
collaborative design in the IC supply chain.
In addition, the CSFs have been examined to be
Demand for innovative and collaborative IC design
influential and the outcomes are predictable. The
approaches is growing and moving toward the IP
next question would be how to systematically
integration research. The inefficiency of serial IC
transform into a well-structured decision underlying
design process is being overcome by utilizing
based on the CSFs as manufacturing practices.
modularized and standardized concurrent and
Chien (2005) proposed the UNISON
parallel design process involving real-time
framework comprising six steps for problem
collaboration among different parties in the design
structuring: (1) understand and define the problem,
chain. Although IC design collaboration is
(2) identify the niche for decision quality
evolving and exhibiting benefits, it is necessary to
improvement, (3) structure the objective hierarchy,
identify CSFs for acceleration of the
generate the alternatives, and clarify influence
implementation. The CSFs as manufacturing
relationships among uncertain events, (4) sense
practices can indeed help improve decision quality
and describe expected outcomes, (5) overall
on collaborative design in the IC supply chain.
judgments and value assessments, and (6) tradeoff
Further studies can be done to use questionnaire
among the attributes and make the decision.
technique and interview among the parties in the
UNISON contains three main streams: Objectives,
IC design supply chain for evaluating the domain
alternatives, and uncertainties. From the
experience against the identified CSFs.
perspective of manufacturing strategy, objectives
may correspond to manufacturing objectives and
alternatives are analogous to manufacturing
practices. The performance measurement in
Acknowledgements
manufacturing strategy can be seen as the links This research is sponsored by National
among the streams whereas uncertainties describe Science Council (NSC97-2221-E-007-111-MY3;
the probabilities and beliefs on the causations. In 098-2811-E-007-009) and NTHU Faculty
this way, decision makers would be able to focus Empowerment Project (97N2521E1).
106 Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain

References
1. Banker, R. D., Charnes, A. and Cooper, W. W., 1984, Academy Winter 2004 PhD Conference.
Some models for estimating technical and scale 16. Fine, C. H. and Hax, A. C., 1985, Manufacturing
efficiencies in data envelopment analysis, Management strategy: a methodology and an illustration, Interfaces,
Science, 30(9), 1078-1092. 15(6), 28-46.
2. Blanchard, T., Ferreri, R. and Wilmore, J., 2002, The 17. Flynn, B. B., Schroeder, R. G. and Flynn, E. J., 1999,
openaccess coalition - the drive to an open industry World class manufacturing: an investigation of Hayes
standard information model, API, and reference and Wheelwright’s Foundation, Journal of Operations
implementation for IC design data, Proceedings of the Management, 17, 249-269.
2002 IEEE International Symposium on Quality 18. Frohlich, M. T. and Dixon, J. R., 2001, A taxonomy of
Electronic Design, 18-21, 69-75. manufacturing strategy revisited, Journal of Operations
3. Buffa, F. B. and Jackson, W. M., 1983, A goal Management, 19(5), 541-558.
programming model for purchase planning, Journal of 19. Fung, A. H., Lee, B. W. and Sheu, B. J., 1989,
Purchasing Material Management, 19(3), 27-34. Self-reconstructing technique for expert system-based
4. Bűrmen, A., Puhan, J. and Tuma, T. 2003, Defining cost analog IC designs, IEEE Transactions on Circuits and
functions for robust IC design and optimization, Systems, 36(2), 318-321.
Proceedings of the Design, Automation and Test in 20. Gajski, D. D., Wu, A. C. H., Chaiyakul, V., Mori, S.,
Europe Conference and Exhibition, 196-201. Nukiyama, T. and Bricaud, P., 2000, Essential issues for
5. Cao, W., Lien, Y. E., Qiu, Y. and Shao, L., 1991, A IP reuse, Proceedings of the 2000 Asia and South
distributed engineering database management system Pacific Design Automation Conference, 37-42.
for IC design, Proceedings of the Design, Automation 21. Geppert, L., 1999, Design tools for analog and digital
and Test in Europe Conference and Exhibition, 33-37. ICs, IEEE Spectrum, 36(4), 41-48.
6. Carley, L. R. and Rutenbar, R. A., 1988, How to 22. Gerwin, D., 1987, An agenda for research on the
automate analog IC designs, IEEE Spectrum, 25(8), flexibility of manufacturing processes, International
26-30. Journal of Operations and Production Management,
7. Cartwright, N., 2003, Two theorems on invariance and 7(1), 38-49.
causality, Philosophy of Science, 70(1), 203-224. 23. Hayes, R. H. and Wheelwright, S. C., 1984, Restoring
8. Cartwright, N., 2004, Causation: one word, many our Competitive Edge-Competing Through
things, Philosophy of Science, 71(5), 805-819. Manufacturing, John Wiley and Sons Inc, New York.
9. Charnes, A., Cooper, W. W. and Rhodes, E., 1978, 24. Hekmatpour, A., 2005, XML-based system and method
Measuring the efficiency of decision making units, for collaborative web-based design and verification of
European Journal of Operational Research, 2(6), system-on-a-chip, U.S. Patent 6968346B2, November
429-444. 22.
10. Chien, C. F., 2005, Decision Analysis: A UNISON 25. Hershenson, M. delM., Boyd, S. P. and Lee, T. H.,
Framework for Total Decision Quality Enhancement, 2001, Optimal design of a CMOS op-amp via
Yeh Yeh Book Gallery, Taipei. geometric programming, IEEE Transactions on
11. Chien, C. F. and Wu, J. Z., 2007, Structuring Computer-Aided Design of Integrated Circuits and
manufacturing strategy, Proceeding of the 3rd IEEE Systems, 20(1), 1-21.
International Conference on Automation Science and 26. Hill, T., 1995, Manufacturing Strategy: Text and Cases,
Engineering, IEEE CASE 2007, 265-269. Macmillan, Houndmills.
12. Cottrell, D. R. and Grebinski, T. J., 2003, 27. Hoover, K. D., 2001, Causality in Macroeconomics,
Interoperability beyond design: sharing knowledge Cambridge University Press, Cambridge.
between design and manufacturing, Proceedings of the 28. Jingnan, X., Serras, J., Oliveira, M., Belo, R., Bugalho,
2003 IEEE International Symposium on Quality M., Vital, J., Horta, N. and Franca, J., 2001, IC design
Electronic Design, 214-219. automation from circuit level optimization to
13. Dangayach, G. S. and Deshmukh, S. G., 2001, retargetable layout, Proceedings of the 2001 IEEE
Manufacturing strategy: literature review and some International Conference on Electronics, Circuits and
issues, International Journal of Operations & Systems, 1, 95-98.
Production Management, 21(7), 884-932. 29. Kaplan, R. S. and Norton, D. P., 1992, The balanced
14. Edwards, W. and Barron, F. H., 1994, SMARTS and scorecard – measures that drive performance, Harvard
SMARTER: improved simple methods for Business Review, 70(January-February), 71-79.
multiattribute utility measurement, Organizational 30. Kaplan, R. S. and Norton, D. P., 2001, The
Behavior and Human Decision Processes, 60(3), Strategy-Focused Organization: How Balanced
306-325. Scorecard Companies Thrive in the New Business
15. Fang, L. Y., 2004, Accelerating firm’s innovation Environment, Harvard Business School Press, Boston.
through inter-organization: in sectoral innovation 31. Kim, D. K., Kwon, K. W., Choi, J. C. and Lee, C. D.,
system perspective, Proceedings of the DRUID 1999, Reusable intellectual property cores in PC data
Journal of Quality Vol. 16, No. 2 (2009) 107

protection ASIC design, Proceedings of the First IEEE knowledge-based approach to analog IC design, IEEE
Asia Pacific Conference on ASICs, 278-281. Transactions on Circuits and Systems, 35(2), 256-258.
32. Leenaerts, D., Gielen, G. and Rutenbar, R. A., 2001, 49. Shih, W., Shih, C. and Chien, C. F., 2008, Horizontal
CAD solutions and outstanding challenges for specialization and modularity in the semiconductor
mixed-signal and RF IC design, IEEE/ACM industry, Harvard Business School Case Study,
International Conference on Computer Aided Design, 9-609-001.
270-277. 50. Simon, H. A., 1955, A behavioral model of rational
33. Leong, G. K., Snyder, D. L. and Ward, P. T., 1990, choice, Quarterly Journal of Economics, 69, 99-118.
Research in the process and content of manufacturing 51. Simon, H. A., 1973, The structure of ill-structured
strategy, Omega, 18(2), 109-122. problems, Artificial Intelligence, 4(3), 181-201.
34. Liu, P. Z., 2006, 2006 IC Design Industry Analysis, 52. Simon, H. A., 1997, Administrative Behavior: A Study
Industry and Economic Databank in Taiwan Institute of of Decision-Making Processes in Administrative
Economic Research. Organizations, 4th edition, The Free Press, New York.
35. Macher, J. T., Mowery, D. C. and Simcoe, T. S., 2002, 53. Skinner, W., 1969, Manufacturing - missing link in
E-business and the semiconductor industry value chain: corporate strategy, Harvard Business Review,
implication for vertical specialization and integrated May-June, 136-145.
semiconductor manufactures, East-West Center, 54. Skinner, W. 1978, Manufacturing in the Corporate
Economic Series, 47, 1-38. Strategy, John Wiley and Sons, New York.
36. Mao, C. K., 2003, Decision, Common Wealth 55. Smith, G. F., 1988, Towards a heuristic theory of
Magazine Inc., Taipei. problem structuring, Management Science, 34(12),
37. March, J. G. and Simon, H. A., 1958, Organizations, 1489-1506.
John Wiley & Sons, New York. 56. Su, Y. H., Guo, R. S. and Chang, S. C., 2004, Inter-firm
38. Miller, J. G. and Roth, A., 1994, A taxonomy of collaboration mechanism in process development and
manufacturing strategies, Management Science, 40(3), product design between foundry and fabless design
285-304. house, Proceedings of 2004 Semiconductor
39. Milo, A. and Nehab, S., 1991, Data framework for Manufacturing Technology Workshop, 47-50.
VLSI design, Proceedings of IEEE/ACM International 57. Su, Y. H., Guo, R. S. and Hsiao, C. H., 2005, Pattern of
Conference on Computer Aided Design, 140-143. vertical engineering collaboration between foundry and
40. Miltenburg, J., 1995, Manufacturing Strategy: How to design service provider, Proceedings of IEEE
Formulate and Implement a Winning Plan, Productivity International Symposium on Semiconductor
Press, Portland. Manufacturing, 361-364.
41. Pearl, J., 2000, Causality: Models, Reasoning and 58. Thompson, J. D. and Tuden, A., 1959, Strategies,
Inference, Cambridge University Press, Cambridge. structures, and processes of organizational decision,
42. Phelps, R., Krasnicki, M., Rutenbar, R. A., Carley, L. Comparative Studies in Administration, The University
R. and Hellums, J. R., 2000, Anaconda: of Pittsburgh Press, Pittsburgh.
simulation-based synthesis of analog circuits via 59. Thompson, J. D., 1964, Decision-Making, the Firm,
stochastic pattern search, IEEE Transactions on and the Market, John Wiley & Sons, New York.
Computer-Aided Design of Integrated Circuits and 60. Thompson, J. D., 1967, Organizations in Action :
Systems, 19(6), 703-717. Social Science Bases of Administrative Theory,
43. Porter, M. E., 1985, Competitive Advantage: Creating McGraw-Hill, New York.
and Sustaining Superior Performance, The Free Press, 61. Wang, H. F., 2004, Multicriteria Decision Analysis –
New York. From Certainty to Uncertainty, Ting Lung Book
44. Saaty, T. L., 1990, How to make a decision: the analytic Company, Taipei.
hierarchy process, European Journal of Operational 62. Weber, C. A. and Current, J. R., 1993, A multiobjective
Research, 48(1), 9-26. approach to vendor selection, European Journal of
45. Savage, W., Chilton, J. and Camposano, R., 2000, IP Operational Research, 68(2), 173-184.
reuse in the system on a chip era, Proceedings of the 63. Woodward, J., 1997, Explanation, invariance and
13th International Symposium on System Synthesis, intervention, Philosophy of Science, 64(4), S26-S41.
2-7. 64. Wu, J. Z. and Chien, C. F., 2008, Modeling strategic
46. Schindler, P., Weidenbacher, K. and Zimmermann, T., semiconductor assembly outsourcing decisions based
1999, IP repository, a web based IP reuse Infrastructure, on empirical settings, OR Spectrum, 30(3), 401-430.
Proceedings of the 1999 Custom Integrated Circuits 65. Yu, C. Y. and Huang, H. P., 2001, Development of the
Conference, 415-418. order fulfillment process in the foundry fab by applying
47. Shepherd, P. R., 1996, Integrated Circuit: Design, distributed multi-agents on a generic message-passing
Fabrication and Test, McGraw Hill, New York. platform, IEEE/ASME Transaction on Mechatronics,
48. Sheu, B. J., Fung, A. H. and Lai, Y. N., 1988, A 6(4), 387-398.
108 Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain

提升積體電路供應鏈協同設計決策品質之
關鍵成功因素

吳吉政* 許嘉裕

國立清華大學工業工程與工程管理學系

(97/10 收件;97/12 修改;98/01 接受)

摘 要

由於積體電路產品的設計過程不僅需要高度知識密集並且相當耗時,積體電路設計者與製造商
間必須協同合作以縮短產品推出至市場的時間。為了提昇製造策略在協同積體電路設計之決策品
質,必須先制訂製造實務以作為製造策略之核心。然而,過去在整合積體電路設計的決策制訂研究
相當缺乏。本研究目的為界定製造策略之決策品質,並藉由深入及廣泛的回顧文獻,定義關鍵成功
因素作為製造實務,以提高積體電路設計供應鏈協同設計之決策品質。本研究並提出一架構供積體
電路供應鏈不同階段下,界定其協同設計之關鍵成功因素。
關鍵詞:決策品質、協同積體電路設計、關鍵成功因素、製造策略、供應鏈

*
聯絡作者:國立清華大學工業工程與工程管理學系,新竹市光復路二段 101 號。
E-mail: d907804@alumni.nthu.edu.tw

View publication stats