KEBUTUHAN MATERIAL SCAFFOLDING ( TUBULAR TYPE ), STANDARD JIS ( 2.

4 )
GI 150KV TOPOYO ( NEW )
MAMUJU TENGAH - SULAWESI BARAT

Gedung Kontrol Gedung 20kV Substation TOTAL


No Deskripsi Due Date On Site Responsible Remarks
( Pcs )
Quantity ( Pcs ) Quantity ( Pcs ) Quantity ( Pcs )

1 Scaffolding Tub 550 550 300 1400 23 Maret 2019 TWK


2 Roda Scaffolding ( With Stopper ) 12 12 0 24 23 Maret 2019 TWK
3 Clamp Double 500 500 1500 2500 23 Maret 2019 TWK
4 Joint External 300 300 100 700 23 Maret 2019 TWK
5 Steel Plank 3 Meter 150 250 1000 1400 23 Maret 2019 TWK
6 Steel Plank 2 Meter 120 120 1000 1240 23 Maret 2019 TWK
7 Steel Plank 1 Meter 50 50 50 150 23 Maret 2019 TWK
8 Kawat No.9 ( Oven Type ) 30 30 30 90 23 Maret 2019 TWK
9 Ladder Aluminium 3 Meter 15 15 10 40 23 Maret 2019 TWK
10 Kunci Rachet ukuran 17 – 21 JIS Type 8 0 0 8 23 Maret 2019 TWK
11 Katrol, Min Mengangkut Beban 500kg 4 4 1 9 23 Maret 2019 TWK
12 Tali Tambang ( Manila Rope ) 200 0 0 200 23 Maret 2019 TWK
13 Full Body Harnes Double Lanyard 25 0 0 25 23 Maret 2019 TWK
14 Adjustable Ladder 12 meter 2 0 0 2 23 Maret 2019 TWK
15 A Ladder 4 Meter 2 2 0 4 23 Maret 2019 TWK
16 Papan Sole Board 25 x 30 x 450 cm 100 100 1200 1400 23 Maret 2019 TWK
17 Tagging Scaffolding Hijau 100 100 100 300 23 Maret 2019 TWK
18 Tagging Scaffolding Merah 50 0 0 50 23 Maret 2019 TWK
19 Net Scaffolding ( Warna Orange ) 5 Roll ( @: 100m ) 0 0 5 Roll ( @: 100m ) 23 Maret 2019 TWK
20 Alat Tandu 2 0 0 2 23 Maret 2019 TWK
21 Clamp Limpet 0 0 1000 1000 23 Maret 2019 TWK
22 Scaffolding Meter 3 0 0 3 23 Maret 2019 TWK
23 Waterpas Scaffolding 3 0 0 3 23 Maret 2019 TWK
24 Ladder Aluminium 4.2 meter 0 0 40 40 23 Maret 2019 TWK
25

NOTED :
*** Quantity dari masing-masing area kerja sudah terhitung secara minimum, mohon tidak ada pengurangan dari Quantity tersebut