You are on page 1of 2

PLAN PROCESS REALIZATION PROCESS

Problem PR
Plan Date Es Date Div Material Qty Status Price Number date
09 August 2023 13 September 2023 Pipe PPR Pipe welding tool DN20-63 1 done 1500000 2433 22 September 2023
15 September 2023 16 September 2023 Pipe Cabble ties 5 pack done 45000/pack 2459 22 September 2023
26 September 2023 03 October 2023 Pipe Cutting machine 14 inch Makita 2 done 3000000/machine 2475
26 September 2023 06 October 2023 Fitting Senter LED 3 done 100000/pcs 2475 12 October 2023
04 October 2023 11 October 2023 Lab Lion fan 20 inch 2 waiting 1200000/pcs 2504
04 October 2023 11 October 2023 Lab Scraper Stainless 3 done 15000/pcs 2504 12 October 2023
04 October 2023 11 October 2023 Lab Masker N95 2 pack waiting 150000/pack 2504
04 October 2023 11 October 2023 Lab Headset Peredam Suara 3 pcs waiting 25000/pcs 2504
04 October 2023 11 October 2023 Lab Tiner 1L waiting 45000 2504
04 October 2023 18 October 2023 Pipe Timbangan Elektonik Krisbow 30 KG 1 waiting 1500000 2507
04 October 2023 18 October 2023 Lab Masker KN95 2 pack waiting 50000/pack 2507
04 October 2023 18 October 2023 Lab Kunci Inggris 10 inch 1 done 95000 2507 12 October 2023
11 October 2023 16 October 2023 QC QC Stamp 5 done 95000/pcs 2534 16 October 2023
30 October 2023 15 November 2023 Lab Digital Hygro-Tehmometer Krisbow HTC-2 5 waiting 890000/pcs 2596
30 October 2023 15 November 2023 Lab Long-sleeved Laboratory Coat 3 waiting 90000/pcs 2596
30 October 2023 15 November 2023 Lab Safety Goggle 3 waiting 15000/pcs 2596
30 October 2023 15 November 2023 Lab Logitech Wireless Mouse 1 waiting 120000 2596
30 October 2023 15 November 2023 Lab Welding Gloves Krisbow 3 waiting 330000 2596
30 October 2023 15 November 2023 Pipe Pipe cutting pliers LIPPRO 1 done 95000 2596
30 October 2023 15 November 2023 Lab Diagonal Cutter Pliers KRISBOW 1 waiting 8000 2596
30 October 2023 15 November 2023 QC Roll meter 10m Toho 5 done 450000 2596
11 November 2023 20 November 2023 QC Map Zipper 20 waiting 400000 2603
11 November 2023 20 November 2023 QC Clipboard 20 waiting 250000 2603
11 November 2023 20 November 2023 QC Rubber Sillicon 1 waiting 2100000 2603
11 November 2023 20 November 2023 QC Krisbow Set Kunci L Hex Key Ballpoint 15-10 Mm 30 Cm 9 Pcs 1 waiting 135000 2603
11 November 2023 20 November 2023 QC Obeng + 2 waiting 80000 2603
11 November 2023 20 November 2023 QC Obeng - 2 waiting 80000 2603
31 October 2023 06 November 2023 Lab Beaker glass 100mL, 250 mL, 500 mL @1 done 375000 2607 15 November 2023
31 October 2023 06 November 2023 Lab Stirring glass rod 30cm 3 done 12000 2607 16 November 2023
31 October 2023 06 November 2023 Lab Latex gloves Sensi Medium 1 done 25000 2607
31 October 2023 06 November 2023 Lab Distilled Water/Aquadest 5L 1 done 64000 2607 15 November 2023
31 October 2023 06 November 2023 Lab Sandpaper Sheet 220 1 waiting 3000 2607
01 November 2023 06 November 2023 Lab Pipa Galvanize Drat luar, 1-1/2 inchi 40 done 550000 2611 04 December 2023
01 November 2023 06 November 2023 Lab Elbow Galvanize, 1-1/2 inchi 20 done 30000 2611 04 December 2023
01 November 2023 06 November 2023 Lab Socket Galvanize Drat Dalam, 1-1/2" 28 done 25000 2611 04 December 2023
01 November 2023 06 November 2023 Lab Kran Besi, 1-1/2" 12 waiting 550000 2611
01 November 2023 06 November 2023 Lab Watermore galvanize, 1-1/2" Inch 5 waiting 65000 2611
01 November 2023 06 November 2023 Lab PC Rakitan 1 Aset 7000000 2614
01 November 2023 06 November 2023 QC PC Rakitan 2 Aset 6600000 2614
14 November 2023 20 November 2023 Lab Dichloromethane, Technical grade 1 L 1 done 250000 2682 16 November 2023
15 January 2023 16 November 2023 QC Set mur baut dan ring ukuran 6 650 done 325000 2695 18 November 2023
15 January 2023 16 November 2023 QC Set mur baut dan ring ukuran 16 50 done 35000 2695 18 November 2023
15 January 2023 16 November 2023 QC Set mur baut dan ring ukuran 10 50 done 30000 2695 18 November 2023
16 November 2023 10 December 2023 QC Kalibrasi kaliper guanglu dan linghuan (19 pcs) 1 Aset 6500000 2699
16 November 2023 10 December 2023 QC Kalibrasi Circumferance Zenyang Jiayu (3 pcs) 1 Aset 1200000 2699
16 November 2023 10 December 2023 QC Kalibrasi Universal testing machine Zwick roell 1 Aset 1800000 2699
16 November 2023 10 December 2023 QC Kalibrasi Chamber Chongqing Soshida 1 Aset 1000000 2699
16 November 2023 10 December 2023 QC Kalibrasi Oven Chongqing Sushida 1 Aset 1000000 2699
17 November 2023 20 November 2023 QC Mata bor besi ukuran 6 mm 2 waiting 100000 2704
17 November 2023 20 November 2023 QC Tombol Swich mesin impact 1 waiting 50000 2704
23 November 2023 24 November 2023 QC Set mur baut dan ring ukuran 6 (M4) 2000 done 1000000 2734
27 November 2023 04 December 2023 QC Cable ties ukuran 30 cm 5 45000 2742
01 December 2023 06 December 2023 Lab Selang 1/4" 190 bar 1 meter 3 done 150000 2768
01 December 2023 06 December 2023 Lab Mata gerindra ukuran 14 inch NIPPON 10 done 70000 2768
01 December 2023 04 December 2023 QC Majun 20 done 8500 2769
01 December 2023 04 December 2023 QC Sarung tangan 30 done 23000 2769
07 December 2023 11 December 2023 Lab Kalibrasi Hydrostatic Blasting Test Machine 1 done 1221000 2784
07 December 2023 11 December 2023 Lab Kalibrasi Airless Pipe Tester 1 done 4495500 2784
07 December 2023 11 December 2023 Lab Kalibrasi Drop Hammer Impact Testing Machine 1 done 777000 2784
07 December 2023 11 December 2023 Lab Kalibrasi Circumference 1 done 388500 2784
08 December 2023 11 December 2023 Lab Pompa Air Otomatis SHIMIZU ZPS20-12 180 - 3 MODE 1 done 1500000 2788
13 December 2023 08 January 2024 Office Manager's Desk 1 waiting 2500000 2804
13 December 2023 08 January 2024 Office Office Chair 5 waiting 750000 2804
13 December 2023 08 January 2024 Office Document Cupboard 2 waiting 2600000 2804
13 December 2023 08 January 2024 Office 8 Door Locker 1 waiting 2000000 2804
13 December 2023 08 January 2024 Office Glass window 6 waiting 2300000 2804
03 January 2024 15 January 2024 Office Kabel FO DropCore 220 waiting 8000 2866
03 January 2024 15 January 2024 Office Kabel UTP Caat6 150 waiting 20000 2866