Professional Documents
Culture Documents
ProcessDownloadPDF PDF
ProcessDownloadPDF PDF
Mobile No 84******48
Bill No. 100936804647 Bill Date 14-07-2020 Cycle No. 20
Email Id sa***********ar@hotmail.com
Bill Distribution No. EAST/EZ3-CHEMBUR/20/373/005/005/085 Type of Supply SINGLE
Connected Load in kW 0.46 PHASE
PAN
GSTIN
YOUR CURRENT CONSUMPTION
This electricity bill niether reflects a title nor is to be used as a proof of any property or premises.
To update your email Id and mobile no.,call us on 19122 Tariff Meter Multiplying Energy consumption Energy Fixed
number Factor charge charge
(MF) Present Previous Consumption (`) (`)
reading reading (Unit kWh)
ACCOUNT NO LT I (B) 4729239 1 15113.00 15013.00 100.00 290.00 70.00
152348597
TOTAL 100 290.00 70.00
BILL MONTH
Tentative meter reading date for your JUL-20 bill is 07-
JUN-20 TRACK YOUR CONSUMPTION (UNITS) ●
08-2020.
● Based on actual reading your earlier estimated bills have been revised
to give slab benefit resulting in differential amount of `.216.45. Your
IMPORTANT MESSAGE
JUL-19 112 last payment received of ` 0.00 is adjusted against this revision. The
DUE DATE AUG-19 130 revised units are displayed in consumption history
Adjustment includes Carrying Cost of `. 2.14
04.08.2020 SEP-19 120 ●
JAN-20 77
720 FEB-20 101
MAR-20 100
APR-20 101
Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY ORDER NO. For Advertisement please contact on
CSD/183/2019/4980 dated 22.10.2019
info@seshaasai.com
PAY-IN SLIP FOR CHEQUE DROP
● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:152348597
● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.
20/373/005
b/f :826.97
0152348597900001460040820200000147000000145021072020 005/085/S08
Round Sum payable: ` 1460.00 Discounted Amount(Round sum): ` 1450.00 Amount after due date (Round sum): ` 1470.00
JUN-20 152348597 /9/ Due date: 04.08.2020 Discount date: 21-07-2020
HOW YOUR BILL WAS CALCULATED Rate `
0152348597900001460040820200000147000000145021072020
Adani House, 56, Shrimali Society, Nr. Mithakhali Six Roads, Navrangpura, Ahmedabad, Gujarat 380009
Regd. Office : Adani Electricity Mumbai Ltd.
NOTE Rs. 10/- discount per month if you opt for Paperless E-Bill. No hard copy will be
• To pay online, visit www.adanielectricity.com generated. Log on to our website (www.adanielectricity.com) for more details
GSTN
Consumer Grievance Redressal Forum (CGRF) • Running your refrigerator at optimum temperature can help reduce
Only for grievances unresolved by IGRC,
reach Consumer Grievance Redressal Forum at
Adani Electricity, 1st Floor, Devidas Lane,
ENERGY
CONSERVATION TIPS
energy wastage.
• Ensuring usage of solar powered lights for outdoor lighting.
• Replacing conventional lighting fixtures with energy efficient ones.
Off SVP Road, Near Devidas Lane Telephone
Exchange, Borivali West, Mumbai 400 103
T 3009 4247
Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.
------------------------------------------------------------------------------------------------------------------------------------
MERC has issued practice directions to the utilities in order to carry out safe operations during
COVID19 pandemic. It includes estimation of electricity bill as per Supply code regulations
After actual reading was made available the bill has been amended,the snapshot of the same is as below
Bill Old Revised Old Revised Difference Bill Payment Payment Carrying Holding
Month Units Units Amount ` Amount ` Amount ` Date Date Amount ` Cost ` Cost `
MAR-20 94 100 635.50 671.60 36.10 16.04.20 20.04.20 1270.00 0.61 0.00
APR-20 94 101 593.09 679.87 86.78 12.05.20 13.05.20 590.00 0.98 0.00
MAY-20 97 104 609.42 702.99 93.57 13.06.20 09.07.20 0.00 0.55 0.00
Carrying Cost 2.14 Charges are levied on the consumers by utility on difference between
lower assessment and actual consumption. This is a debit amount.
Holding Cost 0 Charges payable by the utility of the consumer on difference between
excess assessment and actual consumption. This is a credit amount.
Delayed Payment 7.54 Payable @1.25%, if the payments are made after due date.Further
Charges following conditions are added - if part payment is greater than 80%-
1)In case of excess assessment, i.e. lower actual bills,then DPC will be
calcuated @50% of 1.25%,excess DPC to be refunded with holding
charges
2)In case of lower assessment, i.e. higher actual bills,then DPC will be
calculated @50% of 1.25%, on the differential amount with carrying
costs.
Formula to calculate Carrying Costs/Holding Costs=(Difference between Actual and Assessment bill)
6.95% * Number of days/365 6.95% - one month MCLR rate of SBI
*In case Holding Cost/Carrying Cost fields above are blank, the same will be applied on your next bill, if applicable.