Professional Documents
Culture Documents
07 Approved ATP
08 Process Flowchart with identification of
Inspection Points
09 Process-level Control Plan
10 Inspection Reports - Incoming parts / In-
process / Dispatch operations
11 Test Reports – Supplier STC / Third Party Test
reports / Elmot End-of-Line Testing (for every
product within this project)
12 Calibration reports of the Test Beds
Instrumentation
13 Pre-Inspection Reports for Customer
submission
14 Customer Final Inspection Report by the
designated Inspection Agency
15 Customer Supplied Products / Information /
Specifications (if any)
16 Customer Location Commissioning Sign-off
(Received, Installed & Commissioned as per
Norms)
INDEX
CUSTOMER NAME
INSPECTION AUTHORITY :
PROJECT ID :
1.
2.
3.