5853-Tank Condition Report
5853-Tank Condition Report
1.2 Tank type : Ballast Clean / dirty / segregated / heavy weather / Cargo
2. PROTECTION
2.3 Coating area : Complete / upper part / middle part / lower part
2.4 Coating condition and percentage of breakdown (Ref. attached charts and notes in Instruction Page)
Please mark " h " next to the bulhead which is next to a heated tank for identification.
Pitting
Fractures/Cr Buckling
Area Coating Condition Structure Conditon acks Indents Density in %age Max. Depth
Longitudnals
Longitudnals
Longitudnals
Longitudnals
Longitudinal
Bulkheads Plating
Longitudnals
Lower1/3rd
Transverse
Plating/S
Bulkheads
tiffners Middle 1/3rd
(Fwd.)
Upper 1/3rd
lower1/3rd
Transverse Plating/S
Bulkheads (Aft) tiffners Middle 1/3rd
Upper 1/3rd
Note: Area within the tank may be modified to reflect actual conditon.
Details of Fractures, Cracks, Structural Condition etc. to be reported in the 'Remarks' column in section 4.0
Date of Inspection
VESSEL : ________________________________________ Due Date
Next Due
Tank Designation:
3.2 Air pipes / sounding pipes / striker plates / conduits for tank gauges
3.6 Thickness measurement (if applicable) ; ( please attach a copy of report if thickness gauging carried out)
Conditon with only minor spor rusting affecting not more than 20% of areas under consideration, eg. on a
Good deck transverse, side transverse, on the total area of platings and stifeners on the longitudinal structure
between these components, etc.
Local breakdown at edges of stiffeners and weld connections and/or light rusting over 20% or more of areas
Fair
under consideration.
Conditon with general breakdown of caoating over 20% or more of areas or hard scale at 0% or more of
Poor
areas under consideration.