This document is a non-compliance report issued by URS Scott Wilson India (P) Ltd to GR Infraproject Ltd regarding work on the Four laning of Parwanoo-Solan Section of NH-22 BAROG TUNNEL project. It describes a noncompliance, requires a response by a certain date, and allows for disposition of the issue as well as documentation of corrective actions to prevent future recurrence. The client or engineer must then comment and approve/accept the resolution before a re-inspection can verify compliance.
In 3 sentences or less:
This document is a non-compliance report issued by URS Scott Wilson India (P) Ltd to GR Infraproject Ltd regarding work on the Four laning of Parwanoo-Solan Section of NH-22 BAROG TUNNEL project. It describes a noncompliance, requires a response by a certain date, and allows for disposition of the issue as well as documentation of corrective actions to prevent future recurrence. The client or engineer must then comment and approve/accept the resolution before a re-inspection can verify compliance.
In 3 sentences or less:
This document is a non-compliance report issued by URS Scott Wilson India (P) Ltd to GR Infraproject Ltd regarding work on the Four laning of Parwanoo-Solan Section of NH-22 BAROG TUNNEL project. It describes a noncompliance, requires a response by a certain date, and allows for disposition of the issue as well as documentation of corrective actions to prevent future recurrence. The client or engineer must then comment and approve/accept the resolution before a re-inspection can verify compliance.
Issue to : Date : Four laning of Parwanoo-Solan Section of NH-22 BAROG TUNNEL Project : Authority's Engineer : URS Scott Wilson India (P) Ltd In Association with AECOM India Pvt Ltd. Client : NATIONAL HIGHWAY AUTHORITY OF INDIA Contractor : GR Infraproject Ltd.
Contractor: GRIL 2. NCR Report Serial No:
3. Description & Location of Noncompliance
3a. Document Ref. No. :
Name of Originator: Date: Response Required by :
4. Disposition (Tick one box): Use as-is/Concession Rework Scrap
a. Details of Action
b. Details of Investigation into Cause of Noncompliance:
c. Action taken to prevent recurrence :
Name: Signature: Date:
5. Client / Engineer's Comments & Approval/Acceptance: Yes No