BAB FAR NORTH FULL FIELD DEVELOPMENT PROJECT

(BFN)

REQUEST FOR INSPECTION

PROJECT No: Discipline: RFI No: Project No. + IMP. Contract No. + Sequence No (XXXX)

IMP. CONTRACTOR: Unit / WBS Area: Location: MC Walk Down Category:


Date of Inspection: Time of Inspection:
ITP Item Intervention Points
ITP Number Number IMP. EPCM
ADNOC
CONTRACTOR CONTRACTOR

ITR / FORM No:

Inspection Activity/Description:

Tag No:
Drawing & Rev No:
CHECKED & READY FOR INSPECTION
Submitted by
IMP. CONTRACTOR - Construction EPCM Contractor Construction
Name
Contact Mobile No:
Signature
Date & Time / /
FOR QUALITY CONTROL DEPARTMENT USE ONLY
IMP. CONTRACTOR QC EPCM CONTRACTOR QC ADNOC (If applicable)
Received and Checked by
Received By Checked by QCI Received By Received By
Name
Contact Mobile No:
Signature
Date &Time / / / /
INSPECTION RESULTS (Tick as applicable)

ACCEPTABLE (A) APPROVED WITH COMMENT (AC) ** RFI on HOLD (H)


CANCELLED (C) REJECTED (R) NOT READY FOR INSPECTION (NR)

REASON FOR CANCELLATION/NOT READY FOR INSPECTION/REJECTION


1-Incomplete Work 2-Insufficient documents attached 3- Repeated/unnecessary RFI

4-No action for RFI 5-No Power Supply available at site 6-PTW not available

7- Safety Issues 8- Test Crew not available 9- Test Equipment not available

10-Spec. Violation 11-Unacceptable Test procedure/ Result 12-Violation of ITP

13-Poor Workmanship 14 - Material not as per data sheet/ drawing 15-Installation not as per drawing

16- Other Comments/Remarks:

Punch List (Only applicable for Commented RFI): YES NO

Inspected By IMP. CONTRACTOR QC EPCM CONTRACTOR QC ADNOC (if applicable)

Name

Signature

RFI Closed on

ITR/ FORM cab be signed off or not? Total No. of ITR/ Forms:

Complete
No. of ITR/ Forms Signed off: ITR/Forms Signed off on:
Pending

Not Applicable

** RFI max hold for 48 hrs, afterward automatically canceled if inspection not done.