NATIONAL HIGHWAYS AUTHORITY OF INDIA

4-Laning and Strengthening of Existing 2-Lane Road from Km 265.000 to 380.000


Dhule to Pimpalgaon Section of NH-3 in the State of Maharastra

Contractor : Soma Enterprise Limited Concessonaire : IRCON - SOMA Tollway Pvt. Ltd.
Sub. Contractor : MCCL / SAAVY / VNC Testing Laboratory : Malegaon
INITIAL AND FINAL

Doc. No. : Soma QCF C 03

SETTING TIMES OF CEMENT Rev. No. : 01

Date of Rev. : 23.06.2005

Page No. : 1 of 1
IS: 4031
Package No : Batch No :
(Part 5) 1988
Brand of Cement : Date of testing :

Grade of Cement :

Description Units Test 1 Test 2

Actual test temperature 0


C

Weight of cement(W) gms

Consistency(P) %
Quantity of water to be added =
(0.85xPxWt. of ml
cement)/100
Time of adding water to cement Hours

Time at initial setting Hours

Total time taken for initial setting minutes

Time at final setting Hours

Total time taken for final setting minutes

Initial Setting Time - 30minutes (Minimum)


Specified Limit:
Final Setting Time - 600minutes (Maximum)
Remarks:

Tested by Checked by

Sub Contractor IRCON / SOMA SPV Representative

Random sample checked by


IC Representative