You are on page 1of 4

Fineness Test&Compressive Test of Cement

Padma bridge rail link project


Contract No.:BR/PBRLP/G2G/Contract/2016
Consultant: CSC
Employer: Bangladesh Railway
Contractor: CREC

Project: Padma Bridge Rail Link Project Sample No.:


Tested By: Date Of Sampled:
Brand Name: Type:
Test Method: Use Location:

Fineness Test

Weight Of Cement
Weight of Cement Fineness
Date Of Test: Test No. Retained On Seive Average % Remark
W1 (gm) W2/W1 (%)
W2 (gm)

Compressive Test

Date Of Cast:

Size Of Area Of Curing Dial Actual Strength Average


Spec
Date Of Test: Spec Spec Load Load Strength Remark
No.
(mm) (mm2) Days (KN) (KN) (Mpa) (Mpa)

Note: Calibration Factor:

Comments:

Conformance : Non-Conformance :

Engineer in Charge/
Lab. Technician Material Engineer Engineer’s Representative
Form No.: PBRLP/CREC/Q/QAP-01/AP-019, Rev. B
Normal Consistency & Setting time & Soundness Test of Cement
Padma bridge rail link project
Contract No.:BR/PBRLP/G2G/Contract/2016
Consultant: CSC
Employer: Bangladesh Railway
Contractor: CREC

Ref.Test Code: IS 4031

Project: Padma Bridge Rail Link Project Sample No.:


Tested By: Date Of Sampled:
Type: Date Of Tested:
Use Location: Brand Name:

Normal Consistency Test


Wt Of Water To Cement Pentration
Test No. Wt of Cement (gm) Remark
gm % (mm)

Normal Consistency in (%)

Setting Time Test


Time of Reading Penetration Time of Penetration Penetration
Total Time Total Time
(mm) Reading (mm) (mm)

Initial Setting Time Final Setting Time


Specification Limit Specification Limit
Soundness Test

DistanceBetween The
Distance Between The Indicator Points
Indicator Points Of Le
Test No. Of Le Chatelier Mould After C-A (mm) Remark
Chatelier Mould Before
Boiling(mm) C
Boiling(mm)A

1
2

Comments:

Conformance : Non-Conformance :

Engineer in Charge/
Lab. Technician Material Engineer Engineer’s Representative
Form No.: PBRLP/CREC/Q/QAP-01/AP-019, Rev. B

You might also like