Professional Documents
Culture Documents
8 - With Vent - Config - 2
8 - With Vent - Config - 2
MAIN LINE
TIE-IN TIE-IN NOTES
PI DETAIL-A PI
POINT POINT 1. ALL DIMENSIONS ARE IN MM OR LEVELS ARE IN M.
BYPASS LINE 2. DRAWING ARE INDICATED & SUBJECT TO CHANGE DURING DETAIL ENGG.
3. LAYING OF PIPELINE AND STATION PIPING, VENDOR SHALL MAINTAIN SPECIFIED COVER OF
PIPELINE.
4. FOR VALVE PIT, REFER VALVE CHAMBER DRAWING.
VALVE PIT
LEGENDS
2"
This document is the property of TRACTEBEL ENGINEERING INDIA, any duplication or transmition to third parties is forbidden without its prior approval.
10" 4" REINFORCEMENT PAD
12" 4" REINFORCEMENT PAD
DETAIL-A 16" 6" REINFORCEMENT PAD
2" CUSTOMER
INDIAN OIL CORPORATION LIMITED
PROJECT
CITY GAS DISTRIBUTION PROJECT
TIE-IN TIE-IN
POINT VENT LINE POINT 2" SUBJECT
(DETAIL-B) RED. TEE PIPING GENERAL ARRANGEMENT DRAWING
(TYP.) 4"x2" FOR SV STATION WITH VENTING ARRANGEMENT
MAIN LINE
Size Scale Sheet Rev.
A3 NTS 1 of 2 X
VALVE PIT DETAIL-B TRACTEBEL Engineering pvt. ltd. P.013554
Project No. Discipline Code System Code Serial No.
D 20749 003