A'
FLASHING
1' 2'
A" GA#24 RIB-TYPE ROOF ( LONG SPAN)
ATTACH TO 3" C-PURLINS
GA#24 RIB-TYPE ROOF ( LONG SPAN)
ATTACH TO 3" C-PURLINS @ 0.60M. OC.
GUTTER
DETAIL S-1
4" DIAMETER G.I. PIPE 4" DIAMETER G.I. PIPE 4" DIAMETER G.I. PIPE
SCH.40 SCH.40 SCH.40
DETAIL S-3
600
SIDE VIEW FRONT VIEW
NOTES:
Elements Materials/Specifications Schedule of Finishes
Elevation of roof from the ground level shall have a minimum distance of 3.00m.
Column 4” diameter G.I Pipe sch.40 Painted in Blue Roofing should be inclined at 30 degrees
Steel connections shall be welded type
Steel Truss 2’’ x 2” x ¼” thick angle bar Painted in Gray All steel shall be provided with anti rust primer paint before applying final finish coat
All steel reinforcement shall be 12mm corrugated bar (pedestal and footing).
Roofing G.A 24 Rib Type (Long Span) Any color
Concrete pedestal shall be 0.30m x 030m. at 0.40m height from the ground level.
C-Purlins 3” x 1.5mm thick @ 800mm O.C Gray Provide 8 vertical bars with 10mm dia ties.
Footing shall be 0.90m x 0.90m x 0.25m thick. Minimum depth is 0.80m. Rebar at 150mm
Downspouts 3” diameter PVC Pipe (Neltex Series 1000) Orange spacing O.C. Footing can be eccentric depending on the actual location to where the shed will
be constructed.
Pedestal 3000psi Concrete Plastered Smoothly
Roof edges shall be provided with flashing
Flashing/Gutter Ga. 24 Varies Same color with the roof Downspouts shall be connected to the nearest drain or catch basin
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROP. NEW RECTIFIER AND BATTERY PROFESSIONAL CIVIL ENGINEER CHECKED BY: STANDARD ROOF SHED DESIGN CE-16
FOR STORAGE TANK
CORPORATION
SITE NAME: PLDT CEPZA PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: MANILA AVENUE ROSARIO CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-19
LONGITUDE: 120°51'59.7" LATITUDE: 14°24'44.6" PLACE ISSUE: DATE APPROVED: .
3950
1950 1950
1650 1650
1250 1250 STEEL TRUSS
C1/-F1 C1/-F1
STEEL TRUSS
4260
3560
3960
4260
3560
3960
6260
4000L 4000L
C1/-F1 C1/-F1
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
GROUND FLOOR PLAN AND
PROJECT DESCRIPTION: PROP. NEW RECTIFIER AND BATTERY PROFESSIONAL CIVIL ENGINEER CHECKED BY:
ROOF DECK PLAN OF THE CE-17
SITE NAME: PLDT CEPZA PRC No: PTR No: REVIEWED BY: PROPOSED FUEL TANK SHELTER
CORPORATION
SITE ADDRESS: MANILA AVENUE ROSARIO CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-20
LONGITUDE: 120°51'59.7" LATITUDE: 14°24'44.6" PLACE ISSUE: DATE APPROVED: .
SCOPE OF WORKS AND NOTES
16MM DIA. INTERIOR & EXTERIOR BARS @0.15M.O.C.E.W.
3.56m
Fuel Tank
0.2m 0.70m 6" THICK CHB (PLASTERED & PAINTED FIN.)
2.0m 0.40m 0.2m W/ 10MM HORIZONTAL & VERTICAL BARS
@ 0.60 M. O.C. E.W.
0.90M
0.60m
F.G.L.
0.40M
0.50M
1.65m 4.05 M.
LONGITUDINAL ELEVATION
PLAIN CEMENT
PLASTERED PAINTED FINISH
3.96m
16MM DIA. INTERIOR & EXTERIOR BARS @0.20M.O.C.E.W.
Fuel Tank
0.2m 0.2m
6" THICK CHB (PLASTERED & PAINTED FIN.) W/
12MM HORIZONTAL & VERTICAL BARS @ 0.60 M. O.C. E.W.
0.90M
0.80M
0.40M
PROP. 0.90 M. HIGH BUND WALLS
0.50M
2.7M.
TRANSVERSE ELEVATION
SITE ADDRESS: MANILA AVENUE ROSARIO CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-19
LONGITUDE: 120°51'59.7" LATITUDE: 14°24'44.6" PLACE ISSUE: DATE APPROVED: .
PRE PAINTED FLASHING/GUTTER GA. 24
1950
1650
1250 C.B.
4260
3560
3960
CONCRETE PEDESTAL
4000L
DOWNSPOUT DETAILS
0.10
0.40 M
16MM HANDHOLE
HANDLE
0.10
0.40
L=0.60M
W=0.60M
SITE ADDRESS: MANILA AVENUE ROSARIO CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-19
LONGITUDE: 120°51'59.7" LATITUDE: 14°24'44.6" PLACE ISSUE: DATE APPROVED: .
T-1 TOP CHORD
2L-45x45x3 (2L-50x50x5)
2L-50x50x5
T-1 TOP CHORD
TYP. (2L-50x50x5)
150
75
STEEL PLATE
6mm THK. 2L-45x45x3
100mmØ O.D. GUSSET PLATE
G.I. PIPE SCH 40 (TYPICAL)
500
422
T-1 VERT. MEMBER
4-20mmØ
(2L-45x45x3)
16mm THK
STEEL PLATE BOLTS
2L-45x45x3
67
480
T-1 BOTTOM CHORD
67
(2L-50x50x5) 2L-50x50x5
2L-50x50x5
400
TYP. 2L-45x45x3
PROPOSED
300x300x400mm HT. 50
250x250x16mm CONCRETE PAD
THK. BASE
PLATE
DETAIL S-3
SCALE: NTS
4-20mmØx500
x100 LONG
100
ANCHOR BOLTS
300x300x400mm
12
HT. CONCRETE
PAD
DETAIL S-4
SCALE: NTS
2L-50x50x5
2L-45x45x3
GT/LT DETAILS
SCALE : NTS
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROP. NEW RECTIFIER AND BATTERY PROFESSIONAL CIVIL ENGINEER CHECKED BY:
PROPOSED FST ROOFING DETAILS CE-18
CORPORATION
SITE NAME: PLDT CEPZA PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: MANILA AVENUE ROSARIO CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-20
LONGITUDE: 120°51'59.7" LATITUDE: 14°24'44.6" PLACE ISSUE: DATE APPROVED: .