You are on page 1of 1

TO SEWER TO SEWER

LINEL / CANAL LINEL / CANAL

3" Ø PVC 3" Ø PVC


DOWNSPOUT DOWNSPOUT
DS DS
4'' Ø PVC
SOIL PIPE C.O WC

LAV LAV
3" Ø PVC
ORANGE PIPE
FD

4'' Ø PVC
STOCK PIPE
3" Ø PVC
ORANGE PIPE
3" Ø PVC
ORANGE PIPE

4'' Ø PVC
SOIL PIPE

UP

COLUMN
FOOTING

SEPTIK TANK
SEPTIK TANK

1.2W x 2.5L x 1.8H

VENT PIPE 2''Ø


2.500

HEIGHT UP TO ROOF

1.200
TO SEWER
LINEL / CANAL

3" Ø PVC 3" Ø PVC


ORANGE PIPE DOWNSPOUT

COLUMN
FOOTING

TO SEWER LINEL / CANAL

GROUND FLOOR WASTE PLUMNING LAYOUT


NOT DRAWN TO SCALE

PROJECT TITLE: OWNER: SHEET NO.

PROPOSED TWO-STOREY RESIDENTIAL HOUSE MR & MRS. ALEJAN 2


DRAWN BY: SHEET CONTENT: ARCHITECTURAL

MACKY MANOZO GROUND FLOOR PLAN COMPLETE DIM. 2

You might also like