Professional Documents
Culture Documents
C CHANNEL
BRASS HANDLE
PVC BEADING
2100MM
2100MM
C CHANNEL TAPPER LOCK RAIL
POST OF FRAME
BUTT HINGE
PLASTER
FRAME POST
RCC LINTEL
BEADING FOR BOTTOM RAIL INSERT BOTTOM GAP
BOTTOM RAIL
FLOOR FINISH FLOOR FINISH
GAP INSERT FOR TOP
ELEVATION SECTION 19*19 MM SQURE TUBE
SECTION
ELEVATION
900MM
20MM
PVC PANNEL
30MM
50MM
PVC SOLID
100MM
7MM PVC BEADING
100MM
6MM THK PVC PANEL
5MM THK TAPER PVC C CHANNEL
40MM 75MM
19*19 MS SQUARE TUBE
HINGE MAYANK
10MM THK PLASTER
18025006005
20MM
30MM
230MM BRICK WALL
TOP RAIL LOCK RAIL SEM 04
DETAIL
BUILDING
CONSTRUCTION