Learning outcomes
Introduction
Purpose
General Principle
Health & Safety
Condition Survey
Procedure
Inspection Procedure
References
Page 2
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
LEARNING OUTCOMES
Page 3
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INTRODUCTION
Page 4
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
PURPOSE
The purpose of condition survey is:
1) To give an independent ‘professional opinion’ on the condition of the
properties.
Professional opinion are on :
a) Structural of building( Foundation, Column, Beam, Floor, Wall, Roof etc)
b) Comment on sitting, environment, and planning of the property.
c) Report on finishes, services and some major fixtures and fitting.
d) Give observation and recommendation on maintenance cost both immediate and
future.
Page 5
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
GENERAL PRINCIPLE
Building Surveys for Residential Property, RICS (2012) stated that,
surveyors carrying out building surveys identify, where possible, the
construction and materials which have been used in the property under
inspection.
In other hand, books of “Guide To Domestic Building Survey(Fourth
Edition)” by Jack Bowyer (1988), there are two (2) basic principles to
be followed in carrying out an inspection of property and there are:-
1) To operate on the basis of a proper sequences so that each building
element is inspected in its proper relationship to the building as a whole.
2) To inter-relate each element so that the caused and effect of defects
can be properly recorded in such a way that the subsequent report can
be prepared in logical manner.
Page 6
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
The IMPORTANCE of building inspection
Page 7
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
HEALTH & SAFETY Aspect
Building Surveys for Residential Property, RICS (2012) stated that, It is
recommended that the surveyor be sufficiently fit to be able to undertake
the task, particularly in relation to gaining access to voids that may be
present within the property, and that he or she considers health and
safety aspects, e.g. the need to:
make a record of the appointment either at the office or at home and
let someone know the expected return time;
carry a personal alarm;
carry a mobile phone or pager;
use ladders and other equipment safely;
refer to Surveying Safely on the RICS website (http://www.rics.org/
resources/surveyingsafely/index.html).
Page 8
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
HEALTH & SAFETY Aspect (PWD Practice)
According to PWD, before execution of an inspection, a certain
requirement which is ‘ARAHAN KERJA SELAMAT’ regarding safety
issues should be taken.
Page 9
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
CONDITION SURVEY PROCEDURE
Page 10
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
CONDITION SURVEY PROCEDURE (Cont’)
CLIENT INSTRUCTION
In written books “Building Survey” (Third Edition) by Peter Glover (1996)
The Practice Note recommends that with respect to surveys of residential
property the following matters be confirmed in writing by Surveyor to the
client:-
a) The nature of the instructions.
Is something less than a building survey is to be carried out it is
important that the extent of the obligations being assumed by the
surveyor are understood and agreed to by the client.
b) When the survey is likely to be carried out.
Contact should first be made through the vendor or his agent with
occupier of the premises to be surveyed and arrangements
made for the inspection to be carried out at a convenient time and
date.
Page 11
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
CONDITION SURVEY PROCEDURE (Cont’)
1) CONFIRMATION ON CLIENT INSTRUCTION
Based undertaking a building survey, it is imperative that the purpose, nature and
scope of the survey be determined.
a) Conforming in writing client instruction and intentions, covering all aspect such
as following:-
Extent of inspection of the main structure.
Extent of outbuilding and ground.
Extent of opening up of structure.
Limitations of inspection where surfaces are covered by fitted carpet, wall
fitting etc.
Extent to which heavy or fitted furniture will have to be moved.
Extent of enquiries to be made of local and statutory authority (Land Office,
Planning Department etc.)
Extent to which the surveyor will test drains, electrical, heating and other
services.
Basis of fee to be paid and any expenses.
Whether a valuation or estimate of building costs is to be included and the
Page 12
nature of any limitations or reservation which will be applied.
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
CONDITION SURVEY PROCEDURE (Cont’)
2) PRELIMINARIES SURVEY
a) Surveyor should familiarize himself with the district in which the property is
situated and in particular, with the character and nature of the properties
surrounding the building under inspection .(Refer map, geographical area-
mining, landslide, uphill etc.)
b) The Surveyor will note the principle design features and the extent and nature
of the accommodations.
c) Extensive site notes should be recorded to provide a comprehensive picture of
the property.
d) The RICS practice Note lists a number of questions that might be asked and
these provide useful guide:-
What is the age of the property and are there original plans available?
Any renovation/alteration has been carried out?
Have any structural repairs has been carried out including timber treatment,
underpinning or strengthening etc?
Have the property ever been flooded?
Are there any concealed access hatches to voids, including those under
floors and is there a basement?
Is there any item to be removed?
Page 13
UiTM:M.N Baharuddin (2014)/BSR205
How long has the vendor occupied
©All rights the premises?
reserved
CONDITION SURVEY PROCEDURE (Cont’)
3. PREPARING AN EQUIPMENT
Equipment needed to carry out the inspection falls into three categories:-
a) That provided by the builder to carry out his duties in providing attendance and
in connection with the drain test.
b) That provided by the specialists to enable them to carry out the required tests
on the electrical installation etc.
c) That needed by the surveyor as personal equipment to enable him to carry out
his specific tasks and to record the results of his findings.
Page 14
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
CONDITION SURVEY PROCEDURE (Cont’)
4) THE INSPECTION – INSPECTION PROCEDURE
A Surveyor should follow a definite procedure when inspecting a property.
This procedure will vary from one practitioner to another, but Peter Glover in
his book(Building Survey- Third Edition), give suggestion that it is preferable
in most cases to begin inside the building at the top and finish outside at the
bottom.
The procedure for a domestic house that being produce by Peter Glover
are:-
i. A preliminary inspection of the whole property to familiarizes the Surveyor with type
and layout.
ii. A detail inspection of the main roof-space and any subsidiary roof voids which are
accessible.
iii. A room-by-room inspection at each floor level starting form the topmost floor.
iv. Inspection of accessible basements, cellars, and sub-floor areas.
v. An examination of the roof structure and coverings from ground level, using binoculars
if necessary, and from ladders or through roof voids where accessible.
vi. An examination of the elevations, including structure and finishes.
vii. Inspection of the site boundaries, outbuildings and surroundings.
Page 15
viii. Examination and testing ofUiTM:M.N
drains.Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE
i) Preliminary Inspection Of The Whole
Page 17
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
ii) A detail inspection on main roof space
Fully describe the type of roof covering and condition
High proportion of the survey time
Loft space / roof void
Ensure there is an access to get into safety. 3 meters ladder will be appropriate as a
measure
If not, advice that no inspection was possible and recommends that access is made
Check the material used and the construction for the roof structure. What are the
purlin span and the size of the structure?
What is the condition of the roof rafters and ceiling timbers? What are the conditions
of the joints, such as metal nail plate if any?
Are the trusses in line and vertical and at regular spacing?
Are there water tanks, what it made from, what is the support given? Do the tanks
have covers, does the ball valve work and is the water clean? Are there any signs of
water penetration from the pipe joints?
Is the roof ventilated and insulated?
Have there been wild animals or other wildlife in the roof void? What damaged have
they caused?
Page 18
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
iii) Room by room Inspection
Prepare a sketch plan for each floor level, marking all openings and the
locations of the power and lighting points and the like
Take dimension in each floor
Make note on the condition of the ceilings, wall and floors
Test doors and windows by opening and closing
Describe fixtures, fittings, fixed appliances, electrical points and other matters
of interest
Building
Damp checks. Test it under the windows, all wall, exterior and interior
partitions, ground floor, skirting, top floor at the back of gutter.
Check the surfaces of the plaster work. Is the plaster sound or loose?
Are there any cracks? What have caused them? Do the align with any
external cracking?
Wooden surface are they from termites or other biological attack such
as fungal and beetle?
Page 19
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
iv) Inspection Of Accessible Basement & Sub Floor Area (Internal)
To conduct a close study on damp-proof courses, ground floor timbers and main wall construction
Wall
Type of construction, material used
The type of finishes and it condition, do it need repair?
Are there any signs of crack? What type of crack? How serious? It size and depth. What is the
cause – thermal, drying out, component failure or settlement?
Are the wall straight or are there any bulged (bonjol)? If so how far has the wall bulged? How
much disturbance is there to the internal door frames, window jambs or door jambs?
Windows and doors
Note the types of windows and doors. What material used and what are their condition
Inspect the water is likely to bypass the frame or glass. If so where will the water get trapped, what
the damage?
Floors
How are they constructed? Timber suspended, solid concrete or suspended concrete beam and
fill?
If a timber floors, are the support joists bearing on a damp wall?
Solid floor : examine the gaps below skirting all round the ground floor to see if there any risk of
movement in the floor slab. If there cement screed as the finishes, test the floor screed for level of
dampness.
What the quality of the screed is it soft and friable (rapuh)? See cracks in the surface.
Page 20
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
v) An examination of the roof structure and covering from the ground level
(External)
Paying attention to slipped, cracked or laminated tiles and other signs of
deterioration
The condition of hip and ridge tile is checked especially to the bedding
mortar
The roof
Roof type and appearance – is there a need to include sketch or
photograph to explain the roof layout.
How it constructed?
Take note of the roof covering material and its appearance. Note the
uneven surface.
Is the slope correct for the material used?
Are there adequate cover flashings? How it is fixed?
Are there any openings through the roof surface? How it is sealed?
Can water penetrate?
Page 21
Condition of flat roofs surface, its slope and drainage system. Any sign
of water pooling? UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
vi) An Examination Of The Elevation, Including Structure Finishes
Sketch all fracture lines, showing starting and finishing points and width at
various point
Look for any marks or stains on the wall cause by the leaking overflow gutter
and down pipes
Rainwater disposal
What material has been used? It is compatible(sepadan)? How it is fixed?
It dimensions?
Signs of leakage or failure
Condition of the surface
Is the capacity of the system adequate?
The placement of the gutter, is it clear and beyond the face of the wall
below?
Is the gutter clear debris?
Does the roof felt discharge into the gutter or does water run behind the
face of the above wall?
Eave detail
If water penetrates into the wall will it do any damage?
Is there any stain on the wall to give a clue that water run off into a gutter,
Page 22
or behind it?
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
Wall
Type of construction, material used
The type of finishes and it condition, do it need repair?
Are there any signs of crack? What type of crack? How serious? It size and
depth. What is the cause – thermal, drying out, component failure or
settlement?
Are the wall straight or are there any bulged? If so how far has the wall
bulged? How much disturbance is there to the internal door frames, window
jambs or door jambs?
Windows and doors
Note the types of windows and doors. What material used and what are
their condition
Inspect the water is likely to bypass the frame or glass. If so where will the
water get trapped, what the damage?
Page 23
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
Page 24
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
viii) Examination and testing of drain (External)
Page 25
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
CONDITION SURVEY PROCEDURE (Cont’)
5) PREPARING THE REPORT
Page 26
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
CONDITION SURVEY PROCEDURE (Cont’)
5) PREPARING THE REPORT
In respect of each section of the construction and services, it is advised that,
where relevant, the report narrative:
describes the form of construction and materials used for each element;
outlines the performance characteristics of the material or construction;
describes obvious defects;
describes the identifiable risk of potential or hidden defects;
outlines remedial options;
if considered to be significant, explains the likely consequences of non-repair;
makes general recommendations in respect of the likely timescale for necessary
work;
includes, where appropriate, recommendation for further investigation prior to
commitment to purchase;
cross-refers to the surveyor’s overall assessment where necessary;
identifies the nature of risks in areas which have not been inspected.
Page 27
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
Dealing With Occupier
- Great care should be taken in dealing with occupier furniture and floor
covering, bearing in mind that a liability arise for any damage caused.
- If suspended timber floor under fitted carpet need to be inspect of it parts
of the structure need to be opened up – get occupiers written agreement
and indemnity (pampasan).
Page 28
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
Example of Limitation / Clause Relevant
The report shall be for the benefit of the addressee only.
Drainage – there are no visible access manhole to the drainage system. It was
not possible to decide whether a separate of rainwater below ground level.
Damp Prove Course(DPC) – It was not possible to inspect the whole of DPC,
therefore we cannot confirm on their condition.
Foundation – Surveyor cannot advise client as to the depth and size of the
foundation provided to this property. Excavation of trial holes around the base of
main wall is needed.
Ceiling, wall, and partitions inspected from floor level but without moving
furniture and wall hangings.
Services – inspected visually where accessible, tests are not applied and
comments on the general condition only are given.
Purpose of report – use of client only not by other third party.
Any relevant clause should be applied.
Page 29
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
INSPECTION PROCEDURE (Cont’)
Page 30
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
An Example: Building inspection
BUILDING
PART C : APPENDICES
INSPECTION
DAMPNESS DIAGNOSIS
• Visual inspection
01
• Further inspection
03
• Detail Analysis
04
Page 32
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
An Example: Building inspection
VISUAL INSPECTION
Symptoms
Moisture meter reading shows a firm reading for the dampness area
about more than 90% - 100%.
Page 33
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
An Example: Building inspection
SOURCES:
Roof sheeting showing signs of rusting and break Internal roof trusses and
down of galvanized coating purlins
Page 34
UiTM:M.N Baharuddin
SNAW (2014)/BSR205
©All rights reserved
An Example: Building inspection
FURTHER INSPECTION:
Page 35
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
An Example: Building inspection
Tools used:
8 9
18 8 10 10 18
16 10 23 19 16
15 24
16 45 25
25
11 10
21 10 17 23 23 21
20 25 18
70 27 35 70 70 27
45
23 23 23 19 19 16
23
21 19 45 80 45 45 35 20
45
80 35
23 23 23 23 23
23 100 80 19
23 90 70 90
45 50
23 43
70
Page 36
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
An Example: Building inspection
DETAIL ISNPECTION (Destructive Testing):
GRAVIMETRIC METHOD/OVEN DRYING
Page 37
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
An Example: Building inspection
LAB ANALYSIS:
0.07 0.06
0.06
0.05 0.04 0.04
Percentage % 0.04 0.03 0.03 0.03
0.03 0.02 Chloride (Cl)
0.02
0.01
0
0 1 2 3 4 5 6 0.25 0.2
en en en en en en en 0.2
im im im c im im im em
ec p ec pec e ec pec eci 0.15
Sp S S Sp Sp S
Percentage % Nitrates (NO4)
Sp 0.1
0.03 0.02
0.05 0.01 0.02 0.003 0.003
Seven Drilling Samples
0
0 1 2 3 4 5 6
en en en en en en en
im im im im im im em
ec ec p ec ec ec ec ci
p p S p p p e
S S S S S Sp
3 2.6
Seven Drilling Samples
2.5
2
Percentage % 1.5 Sulphate (SO4)
1
0.5 0.04 0.06 0.07 0.07 0.16 0.017
0
0 1 2 3 4 5 6
en en en en en en en
m m m m m m m
e ci e ci e ci eci e ci e ci c ie
Sp Sp Sp Sp Sp Sp Spe
Seven Drilling Samples
Page 38
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
REFERENCES
Page 39
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved
THANK YOU……
Page 40
UiTM:M.N Baharuddin (2014)/BSR205
©All rights reserved