GENERAL NOTES:

1. THIS DRAWING IS A PROPERTY OF


F studiobenangmerah
2. DO NOT SCALE FROM THIS DRAWING.
K 3. ALL DIMENSIONS MUST BE VERIFIED ON
PPT P Mt SITE PRIOR TO ORDER & MANUFACTURE
OF MATERIAL OR PRODUCTION OF SHOP
DRAWINGS.
Ø 1 1/4"
E 4. THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS ON SITE & NOTIFY THE
DESIGNER IMMEDIATELY FOR ALL
K DISCREPANCIES ON THE DRAWINGS.

PLUMBING LEGEND
SYMBOL DESCRIPTION

MT MATA AIR / SUMUR

P POMPA

T TANGKI

K K KRAN AIR ( H = + 0.80 m dr lantai )


PVB LT. 01 S SHOWER

Ø 1 1/4" D C CLOSET

J JET WASHER

STOP KRAN

WH WATER HEATER

CW CLEAN WATER / AIR BERSIH


C HW HOT WATER / AIR PANAS

NAIK PMT : pipa primer Ø 1 1 4 "


dari mata air ke pompa
PPT : pipa primer Ø 1 1 4 "
dari pompa ke tangki
PVB : pipa vertikal air bersih
CW : pipa sekunder Ø 3 4 "
HW : pipa air panas Ø 3 4 "

B Pipa outlet keran : Ø 12 "

Semua pipa menggunakan


PVC Ex. WAVIN

REV DATE DESCRIPTION BY


CLIENT :

PROJECT :
A1
DESATU HOUSE

CONSULTANT :

Studio Benangmerah

PARAF : DATE :

A2
CONTRACTOR :

PARAF : DATE :

OWNER :

PARAF : DATE :

A3

DRAWING TITLE :

01 FASE 01 - RENCANA AIR BERSIH LT.01 DENAH FASE 01 - LANTAI 01


SKALA 1 : 75 FILE : PAPER/SCALE:
1 2 3 4 AR 01-003 1:75
GENERAL NOTES:

1. THIS DRAWING IS A PROPERTY OF


F studiobenangmerah
2. DO NOT SCALE FROM THIS DRAWING.
3. ALL DIMENSIONS MUST BE VERIFIED ON
PPT K SITE PRIOR TO ORDER & MANUFACTURE
OF MATERIAL OR PRODUCTION OF SHOP
DRAWINGS.
Ø 1 1/4"
E 4. THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS ON SITE & NOTIFY THE
VOID DESIGNER IMMEDIATELY FOR ALL
DISCREPANCIES ON THE DRAWINGS.

PLUMBING LEGEND
SYMBOL DESCRIPTION

MT MATA AIR / SUMUR

P POMPA

T TANGKI

K KRAN AIR ( H = + 0.80 m dr lantai )


PVB LT. 01 S SHOWER

Ø 1 1/4" D K C CLOSET

J JET WASHER

PVB LT. 02 STOP KRAN

WATER HEATER
Ø 1 1/4" WH

CW CLEAN WATER / AIR BERSIH


C HW HOT WATER / AIR PANAS

PMT : pipa primer Ø 1 1 4 "


dari mata air ke pompa
PPT : pipa primer Ø 1 1 4 "
dari pompa ke tangki
PVB : pipa vertikal air bersih
CW : pipa sekunder Ø 3 4 "
HW : pipa air panas Ø 3 4 "

B Pipa outlet keran : Ø 12 "

Semua pipa menggunakan


PVC Ex. WAVIN
VOID

REV DATE DESCRIPTION BY


CLIENT :

PROJECT :
A1
DESATU HOUSE

CONSULTANT :

Studio Benangmerah

PARAF : DATE :

A2
CONTRACTOR :

PARAF : DATE :

OWNER :

PARAF : DATE :

A3

DRAWING TITLE :

01 FASE 01 - RENCANA AIR BERSIH LT.02 DENAH FASE 01 - LANTAI 01


SKALA 1 : 75 FILE : PAPER/SCALE:
1 2 3 4 AR 01-003 1:75
GENERAL NOTES:

1. THIS DRAWING IS A PROPERTY OF


F studiobenangmerah
2. DO NOT SCALE FROM THIS DRAWING.
3. ALL DIMENSIONS MUST BE VERIFIED ON
PPT SITE PRIOR TO ORDER & MANUFACTURE
OF MATERIAL OR PRODUCTION OF SHOP
DRAWINGS.
Ø 1 1/4"
E 4. THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS ON SITE & NOTIFY THE
VOID DESIGNER IMMEDIATELY FOR ALL
DISCREPANCIES ON THE DRAWINGS.

PLUMBING LEGEND
SYMBOL DESCRIPTION

MT MATA AIR / SUMUR

P POMPA

T TANGKI

K KRAN AIR ( H = + 0.80 m dr lantai )


PVB LT. 01 S SHOWER

Ø 1 1/4" D C CLOSET

J JET WASHER
T
PVB LT. 02 STOP KRAN

WATER HEATER
Ø 1 1/4" WH

CW CLEAN WATER / AIR BERSIH


C HW HOT WATER / AIR PANAS

PMT : pipa primer Ø 1 1 4 "


dari mata air ke pompa
PPT : pipa primer Ø 1 1 4 "
dari pompa ke tangki
PVB : pipa vertikal air bersih
CW : pipa sekunder Ø 3 4 "
HW : pipa air panas Ø 3 4 "

B Pipa outlet keran : Ø 12 "

Semua pipa menggunakan


PVC Ex. WAVIN

VOID

REV DATE DESCRIPTION BY


CLIENT :

PROJECT :
A1
DESATU HOUSE

CONSULTANT :

Studio Benangmerah

PARAF : DATE :

A2
CONTRACTOR :

PARAF : DATE :

OWNER :

PARAF : DATE :

A3

DRAWING TITLE :

01 FASE 01 - RENCANA AIR BERSIH LT.ATAP DENAH FASE 01 - LANTAI 01


SKALA 1 : 75 FILE : PAPER/SCALE:
1 2 3 4 AR 01-003 1:75