You are on page 1of 42

1 2 3 4 5 6 7 8 9 10 11 12

SYMBOLS FOR LETTER CODE FOR LETTER CODE FOR


SYMBOLS FOR PIPING ELEMENTS IDENTIFICATION NOTES DETAILS
PROCESS AND INSTRUMENTATION INSTRUMENTATION PROCESS EQUIPMENT
PIPES LINE SYMBOLS FIRST LETTER PIPE NUMBER
1) ALL PIPING TO BE PROVIDED WITH
MEASURED OR LOW POINT DRAIN AND HIGH POINT VENT.
MODIFIER A PROCESS FILTER 20"-OG - 0101 - B24AX - H
INITIATING VARIABLES
C COLUMN 2) ALL LOCAL INSTRUMENTS MUST BE MAIN
A MAIN PROCESS LINE ON/OFF VALVE GATE VALVE SIGHT GLASS OSW
A ANALYSIS E HEAT EXCHANGER, AIR COOLER ACCESSIBLE. LINE
INSULATION / TRACING CODE CBD
B BURNER, COMBUSTION H HEATER
OTHER LINE PIPE CLASS/CODE 3) ALL GAS AND STEAM FLOW

INSULATION
CONTROL VALVE GLOBE VALVE SPOOL PIECE C I NOT TO BE USED MEASUREMENTS IN DCS ARE PRESSURE

IF OTHER
SEQUENCE NUMBER

THAN ET
WITH POSITIONER D DIFFERENTIAL K COMPRESSOR, FAN, BLOWER AND TEMPERATURE COMPENSATED.
STEAM TRACING FLUID CODE

MAIN
LINE
E VOLTAGE (EMF) M- ELECTRIC MOTOR 2"
NEEDLE VALVE NOMINAL DIAMETER 4) VENTING TO SAFE LOCATION IS VENTING
VALVE WITH MANUAL F FLOW RATE RATIO (PREFIX TO K, P, X, ETC.)
ELECTRIC TRACED SWING ELBOW AT HIGH POINT WHICH IS SAFE FOR
OPERATION DEVICE G P PUMP EQUIPMENT NUMBER

P
PERSONNEL.
BALL VALVE H HAND (MANUALLY INITIATED) R REACTOR

ET (IF MAIN
TRACED-MEDIA UNSPECIFIED P-101 1/2 or A/B 5) DEAD ENDS, INSTRUMENTATION AND

LINE ET)
I CURRENT (ELECTRICAL) T TANK, STORAGE INSTRUMENT PIPING (INCLUDING FIRST
AIR CYLINDER OPEN DRAIN
J POWER SCAN T- TURBINE DRIVE MAIN / STAND BY ISOLATION VALVE) WHERE FREEZING

BY EPC SPEC
MAIN
LINE
STEAM JACKETED OPERATED VALVE PLUG VALVE OR CONGEALING SERVICE MAY OCCUR 2" 2"
K TIME, TIME SCHEDULE TIME, RATE OF CHANGE (PREFIX TO G, K, P, OR X ONLY) FIRST OF TWO PARTS
B HAND OPERATED SHALL BE TRACED FOR WINTERIZATION.
DOWN L LEVEL V DRUM, SEPARATOR, VESSEL SERIAL NUMBER

P
SLOPE DOWN CONTROL VALVE TO BE FINALIZED DURING DETAILED
DIAPHRAGM VALVE M MONITORING (MOTORS) X MISCELLANEOUS EQUIPMENT EQUIPMENT GROUP LETTER ENGINEERING.
UP
S SILENCER
N OSW
SLOPE UP 6) IN ORDER TO ELIMINATE FORMATION OF CBD
SOLENOID VALVE O ICE WHEN AMBIENT TEMPERATURE IS
BUTTERFLY VALVE INSTRUMENT NUMBER
FREE DRAINING P PRESSURE, VACUUM BELOW 0°F, WEEP HOLES, DOWNSTREAM
(NO POCKETS) M
Q QUANTITY INTEGRATE, TOTALIZE VENTS AND PSV MUST BE DESIGNED SO
FIC - 0101 1/2 or A/B
NON-RETURN OR CHECK STAGNANT CONDENSATE IS NOT
ELECTRIC MOTOR R RADIATION POSSIBLE.
VALVE MAIN / STAND BY
INSTRUMENT LINES OPERATED VALVE S SPEED, FREQUENCY SAFETY
IN-LINE SILENCER FIRST OF TWO PARTS 7) LOW POINT DRAINS AND OTHER DEAD
T TEMPERATURE ENDS WHERE WATER CAN ACCUMULATE
SELF OPERATING ANGLE VALVE LOOP OR INSTRUMENT
COMMUNICATION LINK / U MULTIVARIABLE SHALL BE MADE OF ALLOY 625 MATERIAL
SOFTWARE SIGNAL / TYPE BACK PRESSURE NUMBER IN SECTION BETWEEN R-101 AND X-103.
REGULATING VALVE V VIBRATION
TO BE DEFINED DURING FUNCTIONAL IDENTIFICATION
C DETAILED ENGINEERING W WEIGHT, FORCE
3-WAY VALVE 8) FINAL CONTROL VALVE TYPE SELECTION
SELF OPERATING X UNCLASSIFIED X AXIS BY EPC.
PRESSURE VENT
ELECTRIC SIGNAL / TYPE TO Y EVENT, STATE, PRESENCE Y AXIS FLUID CODES
REDUCING VALVE
BE DEFINED DURING Z POSITION, DIMENSION Z AXIS, SAFETY
DETAILED ENGINEERING AD AMINE DRAIN
SPRING LOADED INSTRUMENTED
AF ANTIFOAM SOLUTION
QUICK CLOSING MINIMUM FLOW VALVE SYSTEM
PNEUMATIC SIGNAL OPEN VENT AM AMINE SOLUTION
VALVE-INTERMITTENT SUCCEEDING LETTER DESIGNATION OF NOZZLES BB BOILER BLOW-DOWN
BLOW DOWN MEASURED OR ON PROCESS EQUIPMENT BF BOILER FEED WATER
CAPILLARY TUBE MODIFIER BW
INITIATING VARIABLES BOILER WATER
SPRING LOADED SAFETY MIXING DEVICE A INLET CAU CAUSTIC SOLUTION
CONNECT TO PROCESS RELIEF VALVE A ALARM B OUTLET CBD CLOSED DRAIN
LIQUID SEAL B C CH HIGH PRESSURE STEAM CONDENSATE
HYDRAULIC SIGNAL COMPENSATOR CL LOW PRESSURE STEAM CONDENSATE
C CONTROL CLOSE D DRAIN
SPRING LOADED VACUUM CM MEDIUM PRESSURE STEAM CONDENSATE
D MECHANICAL LINK OR D DEVIATION E CWR
RELIEF VALVE ADJUSTABLE SPACER RINGS COOLING WATER RETURN
CONNECTION CWS
E PRIMARY ELEMENT F LEVEL SWITCH COOLING WATER SUPPLY
F G DS DIMETHYLDISULPHIDE (DMDS)
INSTRUMENT OR FUNCTION ORIFICE FLAME ARRESTOR DSL DIESEL
G GLASS, GAUGE H HANDHOLE DW DEMINERALIZED WATER
PULSATION DAMPER
H HIGH I FG FUEL GAS
NOISE ATTENUATION DEVICE FL
I INDICATE J RELIEF TO FLARE
INSTRUMENT SURROUNDED FO FUEL OIL
BY BOX IS PART OF J K GSO
VENTURI TEMPORARY STRAINER GAS OIL
DCS / ESD CONTROL SYSTEM K CONTROL STATION L LEVEL INSTRUMENT HC HYDROCARBONS GENERAL
AIR INTAKE L LIGHT LOW M MANHOLE HG HYDROGEN
FLOW NOZZLE HR HYDROGEN RICH GAS
Y-STRAINER M MANUAL INPUT MIDDLE, INTERMEDIATE N
IA INSTRUMENT AIR
FIELD MOUNTED N O SAMPLE CONNECTION KER KEROSENE
ROTAMETER O ORIFICE (RESTRICTION) OPEN P PRESSURE MEASUREMENT LPG LIQUEFIED PETROLEUM GAS
E
P POINT (TEST CONN.) Q MD MDEA SOLUTION
BUCKET TYPE STRAINER NAP
PRIMARY LOCATION NAPHTHA
POSITIVE DISPLACEMENT SPE SPECIAL PIPING Q R NG
(MAIN PANEL) NATURAL GAS
METER ELEMENT R RECORD RUN S SAFETY VALVE NI NITROGEN
STEAM TRAP WITHOUT S SWITCH STOP T TEMPERATURE MEASUREMENT OG OFF-GAS
BEHIND-PANEL DEVICE AVERAGE PITOT TUBE STRAINER OSW OILY SEWER WATER
STATIC MIXER T TRANSMITTER U UTILITY
(NORM. INACCESSIBLE) OR ANNUBAR PA PROCESS AIR
U MULTIFUNCTION MULTIFUNCTION V VENT PC PROCESS CONDENSATE
TURBINE OR STEAM TRAP WITH PH
V VALVE, DAMPER, LOUVER W PHOSPHATE SOLUTION
AUXILIARY LOCATION PROPELLER TYPE STRAINER PW
OFF PAGE CONNECTOR W WELL X PROCESS WATER
(LOCAL PANEL) FLOWMETER SA SERVICE AIR
X UNCLASSIFIED UNCLASSIFIED Y SC STEAM CONDENSATE
VORTEX SHEDDING FIGURE 8-TYPE BLIND,
INTERLOCK SAFETY RELAY, COMPUTE, Z SH HIGH PRESSURE STEAM
FLOWMETER NORMALLY CLOSED Y
IS
FUNCTION CONVERT SL LOW PRESSURE STEAM
1 XX XXX SM
F (GROUP 1) DRIVER, ACTUATOR, MEDIUM PRESSURE STEAM
FIGURE 8-TYPE BLIND, SW SOUR WATER
ULTRASONIC FLOWMETER Z UNCLASSIFIED FINAL
NORMALLY OPEN DIAGRAM NO.
OPC NO.
CONTROL ELEMENT IDENTIFICATION SWS
TWA
STRIPPED SOUR WATER
TREATED WATER
I INTERLOCK LOGIC
VALVE STATE UCO UNCONVERTED OIL
1 (GROUP 1) CORIOLIS FLOWMETER BLIND
ALARM VGO VACUUM GAS OIL
BL
FC FAILURE CLOSED
IS LOCAL INTERLOCK PANEL ALARM ON DCS ARE IDENTIFIED BY PLACING FO FAILURE OPEN
MAGNETIC FLOWMETER SPACER BATTERY LIMIT
1 (GROUP 1) INSTRUMENT DESIGNATION ADJACENT FL FAILURE LOCKED PIPE CLASS CODES
TO THE INSTRUMENT SYMBOLS i.e. : FL/DC FAILURE LAST POSITION/DRIFT CLOSED
U U1 FL/DO FAILURE LAST POSITION/DRIFT OPEN
RUPTURE DISC MANIFOLD/COLLECTOR FIRST IDENTIFIER: SECOND IDENTIFIER:
OTHER AD LC LOCKED CLOSED
DIAGRAM (U1) AH LO LOCKED OPEN B = Class 150 24 = Killed CS
FIC
AD : DEVIATION ALARM
LP LOCKED IN POSITION D = Class 300 36 = 2 1/4 Cr-1 Mo
UTILITY AH : HIGH ALARM
SPRAY NOZZLE HEADER F = Class 600 40 = SS304L
G SKIN TEMPERATURE AL AL : LOW ALARM
G = Class 900 42 = SS316L
MEASUREMENT H = Class 1500 44 = SS321
SPRAY NOZZLE J = Class 2500 47 = SS317L
INCORPORATING HOSE LIMITS TYPE OF LEVEL INSTRUMENTS INSULATION CODES
NNF NORMALLY NO FLOW 66 = SS347H
NON RETURN VALVE 491 = SS254SMO Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
A ACOUSTIC INSULATED 761 = ALLOY625
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

HOSE CONNECTION B= BICOLOR C COLD INSULATED


S THIRD IDENTIFIER:
B24 D24 C= CONDUCTIVITY H HOT INSULATED
3-WAY SOLENOID VALVE: CHANGE OF PIPE CLASS
LG 0 0 inch CA
GWR= GUIDED WAVE RADAR N NOT INSULATED
ARROW INDICATES STATE A 1/16 inch CA
FLANGED CONNECTION M= MAGNETIC NS ANTISWEAT
WHEN DE-ENERGIZED X B 1/8 inch CA 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
CHANGE OF NOMINAL R= REFLEX P PERSONNEL PROTECTION INSULATED
C 1/4 inch CA 0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
DIAMETER T= TRANSPARENT
INSTRUMENT WITH REV. DESCRIPTION DATE DRAWN CHECK APPR.
FLANGED END
DIAPHRAGM SEAL BATTERY LIMIT HEAT TRACING CODES FOURTH IDENTIFIER: Seabord Energy, USA
GENERAL NOTE X = NACE
HDT renewable feedstock Client Doc. No.: 32000-PID-01-0
H DESIGN CONDITIONS
DAMPER CAPPED END ET ELECTRIC TRACED SHEET SIZE UNIT
1. LETTER CODE FOR INSTRUMENTATION: SJ STEAM JACKETED
OPERATING CONDITIONS IDENTIFICATION LETTERS ARE IN ACCORDANCE NAME
ST STEAM TRACED EXAMPLE: B24AX Symbols and identifications
S01
WITH ANSI - ISA - S 5.1 TR TRACED - MEDIA UNSPECIFIED Piping and instrument diagram
SCREWED CAP
MULTIVANE LOUVER KILLED CS, 1/6 inch CA, CLASS 150, NACE DOCUMENT ID

S-09154 P42001 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

LIST OF DIAGRAMS LIST OF EQUIPMENT


DIAGRAM DOCUMENT EQUIPMENT DIAGRAM
DIAGRAM TITLE EQUIPMENT NAME
NAME NO. NO. NAME
S01 SYMBOLS AND IDENTIFICATIONS P42001 A-101 A FEED FILTER P03
A S02 LIST OF DIAGRAMS AND EQUIPMENT P42002 A-101 B FEED FILTER P03
S03 SYMBOLS AND IDENTIFICATIONS P42003
S04 SYMBOLS AND IDENTIFICATIONS P42004 C-101 PRODUCT STRIPPER P23
C-102 NAPHTHA STABILIZER P27
P01 FEED P42101
P02 FEED PREHEAT P42102 E-101 FEED / PRODUCT EXCHANGER P02
P03 FEED FILTER P42103 E-102 A HDO REACTOR EFFLUENT/TREAT GAS EXCHANGER P09
P04 FEED SURGE DRUM P42104 E-102 B HDO REACTOR EFFLUENT/TREAT GAS EXCHANGER P09
P05 FEED PUMP P42105 E-103 A ISOM REACTOR EFFLUENT/TREAT GAS EXCHANGER P09
P06 HEATER P42106 E-103 B ISOM REACTOR EFFLUENT/TREAT GAS EXCHANGER P09
P07 HDO REACTOR 1 P42107 E-104 RECYCLE OIL / EFFLUENT EXCHANGER 1 P09
P08 HDO REACTOR 2 P42108 E-105 A REACTOR EFFLUENT / STRIPPER FEED EXCHANGER P11
P09 REACTOR EFFLUENT COOLING I P42109 E-105 B REACTOR EFFLUENT / STRIPPER FEED EXCHANGER P11
P10 ISOM REACTOR P42110 E-105 C REACTOR EFFLUENT / STRIPPER FEED EXCHANGER P11
P11 REACTOR EFFLUENT COOLING II P42111 E-106 STRIPPER FEED / BOTTOMS EXCHANGER P11
B P12 REACTOR EFFLUENT COOLING III P42112 E-107 REACTOR EFFLUENT AIR COOLER P12
P13 HIGH PRESSURE COLD SEPARATOR P42113 E-108 PRODUCT STRIPPER OH AIR COOLER P25
P14 LOW PRESSURE FLASH DRUM P42114 E-109 NAPHTHA STABILIZER REBOILER P27
P15 RECYCLE PUMP P42115 E-110 NAPHTHA PRODUCT AIR COOLER P28
P16 WATER CIRCULATION PUMP P42116 E-111 DIESEL PRODUCT AIR COOLER P29
P17 RECYCLE GAS K.O. DRUM P42117 E-112 RECYCLE OIL / EFFLUENT EXCHANGER 2 P12
P18 RECYCLE GAS COMPRESSOR P42118 E-113 MU COMPRESSOR KICK BACK COOLER P20
P19 RGC OH COOLING P42119 E-114 PRODUCT STRIPPER OH TRIM COOLER P25
P20 MAKEUP GAS K.O. DRUM P42120 E-116 MAKEUP COMPRESSOR 1st STAGE INTERCOOLER P21
P21 MAKEUP GAS COMPRESSOR I P42121 E-117 MAKEUP COMPRESSOR 1st STAGE INTERCOOLER P22
P22 MAKEUP GAS COMPRESSOR II P42122
P23 PRODUCT STRIPPER P42123 H-101 HEATER P06
P24 DIESEL PRODUCT PUMP P42124
P25 PRODUCT STRIPPER OH COOLING P42125 K-101 A MAKEUP GAS COMPRESSOR P21
C P26 PRODUCT STRIPPER REFLUX DRUM P42126 K-101 B MAKEUP GAS COMPRESSOR P22
P27 NAPHTHA STABILIZER P42127 K-102 A RECYCLE GAS COMPRESSOR P18
P28 NAPHTHA PRODUCT COOLING P42128 K-102 B RECYCLE GAS COMPRESSOR P18
P29 DIESEL PRODUCT COOLING P42129
P30 DIESEL PRODUCT/ WATER SEPARATOR P42130 P-101 A FEED PUMP P05
P31 DIESEL PRODUCT DRYER P42131 P-101 B FEED PUMP P05
P32 SOUR WATER FLASH DRUM P42132 P-102 A RECYCLE PUMP P15
P33 HEATER, NATURAL GAS SECTION P42133 P-102 B RECYCLE PUMP P15
P-103 A WATER CIRCULATION PUMP P16
T01 INTERLOCK SYSTEM P42301 P-103 B WATER CIRCULATION PUMP P16
T02 INTERLOCK SYSTEM P42302 P-104 A SOUR WATER PUMP P26
T03 INTERLOCK SYSTEM P42303 P-104 B SOUR WATER PUMP P26
T04 INTERLOCK SYSTEM P42304 P-105 A PRODUCT STRIPPER REFLUX PUMP P26
T05 INTERLOCK SYSTEM P42305 P-105 B PRODUCT STRIPPER REFLUX PUMP P26
P-106 A DIESEL PRODUCT PUMP P24
D P-106 B DIESEL PRODUCT PUMP P24

R-101 HDO REACTOR 1 P07


R-102 HDO REACTOR 2 P08
R-103 ISOM REACTOR P10

V-101 FEED SURGE DRUM P04


V-102 HIGH PRESSURE COLD SEPARATOR P13
V-103 LOW PRESSURE FLASH DRUM P14
V-104 SOUR WATER FLASH DRUM P32
V-105 RECYCLE GAS K.O. DRUM P17
V-106 MAKEUP GAS K.O. DRUM P20
V-107 PRODUCT STRIPPER REFLUX DRUM P26
V-108 DIESEL PRODUCT/ WATER SEPARATOR P30
V-109 A DIESEL PRODUCT DRIER P31
E
V-109 B DIESEL PRODUCT DRIER P31
V-110 MAKEUP GAS COMPRESSOR K.O. DRUM 2nd STAGE P21
V-111 MAKEUP GAS COMPRESSOR K.O. DRUM 2nd STAGE P22

X-101 STATIC MIXER 1 P07


X-102 STATIC MIXER 2 P08
X-103 STATIC MIXER 3 P12
X-105 EVACUATION EJECTOR P17

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seabord Energy, USA


HDT renewable feedstock Client Doc. No.: 32000-PID-02-0
H
SHEET SIZE UNIT

List of diagrams and equipments NAME


Piping and instrument diagram
S02
DOCUMENT ID

S-09154 P42002 1
JOB NUMBER DOCUMENT NUMBER REV
T:\TECH\S-09154\SmartPlant P&ID\S&T Diagrams\S02.igr
1 2 3 4 5 6 7 8 9 10 11 12

VARIOUS SYMBOLS
NOTE
SAMPLE STATIONS FOR GAS BELOW 140°F AND LIQUIDS SAMPLE STATIONS FOR GAS ABOVE 140°F AND LIQUIDS
1) MINIMUM 3 ft BARE TUBE FOR AIR COOLING BEFORE ENTERING
SYMBOLS ON P&I DIAGRAM DETAIL DRAWING SYMBOLS ON P&I DIAGRAM DETAIL DRAWING WATER COOLER.

A 2) HOSES AND BOTTLE SHALL BE DESIGNED FOR FULL OPERATING


NON HAZARDOUS CONDENSABLE PRESSURE OR PSV MUST BE PROVIDED.
NON-FLASHING GAS ABOVE 140°F. 1
PIPING
LIQUIDS BELOW 140°F. 3) TO MEASURE "STEAM /DRY GAS" RATIO REPLACE BOTTLE

PIPING

PIPING
FL BL
1/4" WITH GASOMETER.

3/4"

3/4"
4
3/4" 4) CONTROL VALVE OR OTHER EXISTING PRESSURE RESTRICTION
1/4" AP IN THE MAIN LINE.
AP TYPE 5
TYPE 1A ONLY TYPE B

2
SAMPLE

PIPING
COOLER 1/4"

3/4"
SAMPLE BOTTLE
B 2
AP CW BL 1/4"
TYPE 1B 3/4"
1 1/2" SAMPLE BOTTLE

3/4"
SS-SEPARATOR
100 x 250mm
CHEMICAL
SEWER OR DRAIN 3

1 1/2"
NON HAZARDOUS CHEMICAL CHEMICAL
FLASHING LIQUIDS SEWER OR DRAIN SEWER OR DRAIN
C OR NON-FLASHING
LIQUIDS ABOVE 140°F.
PIPING

PIPING
3/4"

3/4"
4 NON HAZARDOUS
GAS ABOVE 140°F. ATMOSPHERE
1/4" SAFE LOCATION
VENT TO ATMOSPHERE
AP 1 AT SAFE LOCATION.
TYPE 2A ONLY TYPE B
PIPING 1

1/4"
SAMPLE
COOLER AP 3/4"
TYPE 6

D CW BL
3/4"
1 1/2"
3/4"

AP
TYPE 2B SAMPLE
2 COOLER

SAMPLE BOTTLE
CW BL
3/4"

3/4"
11/2"
1 1/2"

1 1/2"
E

MINIMIZE

MINIMIZE
CHEMICAL CHEMICAL CHEMICAL
SEWER OR DRAIN SEWER OR DRAIN SEWER OR DRAIN
2

SAMPLE BOTTLE
NON HAZARDOUS ATMOSPHERE
GAS BELOW 140°F. SAFE LOCATION
VENT TO PIPING
ATMOSPHERE AT
SAFE LOCATION. 1/4"
3/4" FLASHING OR
F HAZARDOUS LIQUIDS FL BL
OR GAS ABOVE 140°F.

PIPING
AP VENT TO FLARE.

PIPING
TYPE 3
MINIMIZE

MINIMIZE

PIPING

3/4"

3/4"
4
GENERAL NOTES:

3/4"
2 ONLY TYPE B A) REQUIREMENT FOR TRACING TO BE CONSIDERED.
AP
TYPE 7A 1/4"
B) ALL SAMPLE CONNECTIONS SHALL BE FROM TOP OF PROCESS
SAMPLE BOTTLE 1 PIPE. UNLESS OTHERWISE SPECIFIED.

C) ALL SAMPLE TUBING TO BE 1/4" SS UNLESS OTHERWISE SPECIFIED.


SAMPLE
COOLER D) VALVES IN PIPING TO BE DOUBLED IN HIGH PRESSURE SYSTEMS.
FLASHING OR (AS PIPING SPECIFICATION).
G FL BL
HAZARDOUS LIQUIDS
OR GAS BELOW 140°F.
PIPING
PIPING

VENT TO FLARE.
PIPING

AP CW BL
TYPE 7B
3/4"

3/4"

3/4"

4 Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3/4"

11/2" and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1/4" ONLY TYPE B


AP
TYPE 4A
1 1/2"

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
MINIMIZE

MINIMIZE

MINIMIZE

MINIMIZE
CHEMICAL REV. DESCRIPTION DATE DRAWN CHECK APPR.
SEWER OR DRAIN Seabord Energy, USA
HDT renewable feedstock Client Doc. No.: 32000-PID-03-0
H AP 2 2 SHEET SIZE UNIT
TYPE 4B

Symbols and identifications NAME


SAMPLE BOTTLE SAMPLE BOTTLE
Piping and instrument diagram
S03
DOCUMENT ID

S-09154 P42003 1
JOB NUMBER DOCUMENT NUMBER REV
T:\IES3\HTAS SmartSketch\Templates\Process\PID\S02A.igr
1 2 3 4 5 6 7 8 9 10 11 12

VARIOUS SYMBOLS
NOTE
SAMPLE STATIONS FOR GAS ABOVE 140°F AND LIQUIDS SAMPLE STATIONS FOR SPECIAL CASE
1) MINIMUM 3 ft. BARE TUBE FOR AIR COOLING BEFORE ENTERING
SYMBOLS ON P&I DIAGRAM DETAIL DRAWING SYMBOLS ON P&I DIAGRAM DETAIL DRAWING WATER COOLER.

2) HOSES AND BOTTLE SHALL BE DESIGNED FOR FULL OPERATING


A
HIGH PRESSURE HAZARDOUS LIQUID/VAPOR PRESSURE OR PSV MUST BE PROVIDED.
HAZARDOUS GASSES ABOVE 140°F AND 870 psig.
ABOVE140°F CONTAINING
COMPONENT WITH DEW
POINT ABOVE AMBIENT CONNECTION FROM BOTTOM OF PIPE FL BL
TEMPERATURE E.G. AMMONIA.
AP

PIPING
TYPE 10

PIPING

MINIMIZE

3/4"
3/4"

2"
AP
TYPE 8 1/4"

1 FLUSHING OIL

1/2"
PRV

1 1/2"

CS
FL BL
PG SAMPLE

#2500 SS
COOLER

PIPING
SL BL
3/4" PG
SAMPLE

3/4"
COOLER CW BL
3/4"

3/4"
11/2" 1/2"
1/2" 3/4"
CW BL 1
C
3/4"

11/2" LG

1 1/2"
TG
1 1/2"

CHEMICAL
SEWER OR DRAIN
#2500 SS CS Press.

PSV
MINIMIZE

MINIMIZE
CHEMICAL

1 1/2"
SEWER OR DRAIN

FL BL

#2500 SS
2

3/4"
SAMPLE BOTTLE
D

CS
LO

SAMPLE BOTTLE

OSW

SAMPLE STATIONS FOR SPECIAL CASE SAMPLE STATIONS


F SYMBOLS ON P&I DIAGRAM DETAIL DRAWING SYMBOLS ON P&I DIAGRAM STEAM TRAPS

HOT FLUE GAS


UNDER VACUUM. GENERAL NOTES:
STEAM LINE
A) REQUIREMENT FOR TRACING TO BE CONSIDERED.
T SC BL
CONNECTION TO SUIT PORTABLE SAMPLE BOTTLE

3/4"
LINE SIZE
WITH VACUUM PUMP OR PORTABLE ANALYZER. 1 B) ALL SAMPLE CONNECTIONS SHALL BE FROM TOP OF PROCESS
SS

AP PIPE. UNLESS OTHERWISE SPECIFIED.


1/4"

TYPE 9

C) ALL SAMPLE TUBING TO BE 1/4" SS UNLESS OTHERWISE SPECIFIED.


INCONEL

3/4"
D) VALVES IN PIPING TO BE DOUBLED IN HIGH PRESSURE SYSTEMS.
SC BL (AS PIPING SPECIFICATION).
G MIN. 13 ft. OF BARE 1/4" INCONEL IF FLUE GAS
TEMPERATURE IS ABOVE 930°F. CONDENSATE HEADER

TUBE INSERTED CLOSE TO EDGE


OF BRICK WORK. CONAX FITTING WITH LAVA SEAL. Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

FLUE GAS DUCT ROOF / WALL


STEAM LINE

T LINE SIZE 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
2
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seabord Energy, USA


HDT renewable feedstock Client Doc. No.: 32000-PID-04-0
H
SHEET SIZE UNIT
3/4"

Symbols and identifications NAME


Piping and instrument diagram
S04
CHEMICAL SEWER CHEMICAL SEWER
DOCUMENT ID
OR DRAIN OR DRAIN
S-09154 P42004 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

PI
A
0103

PT PG
0103 0104

4"-HC-0102-D24B-ET
100 P02
FEED
TO E-101

B I
102

3/4" SP
FIC
D
0101
TYPE 1B AL
AP T COMP.

FC
0101
3/4" FV
D
0101

3/4"
FT
D
0101

3/4"
D

IS
D
2

UZV UZY
0101 S 0101

FC UZLO
PI PT 0101
0102 0102
AC
UZC UZLC
PG 0101 0101
0101
E TI
0101

MINIMIZE

D24B D24A
MINIMIZE

4"-HC-0103-D24B-ET
3/4"

By EPC D24B
F D
4"-HC-0101-D24B-ET
INTERMITTANT LINE

INTERMITTANT LINE

INTERMITTANT LINE
MINIMIZE

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-DSL-3108-D24A-ET
3"-HC-0104-D24B-ET

and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
3/4"
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
104

DIESEL PRODUCT RECYCLE

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-05-0
H
RENEWABLE FEED

SHEET SIZE UNIT


P31

P04
BL

BL

.
FROM V-109 A/B

FROM LIC-0402
FLUSHING OIL

P05
FLUSHING OIL
TO P-101 A/B

V-101 LEVEL

Feed NAME
P01
FROM BL

FROM BL

Piping and instrument diagram


DOCUMENT ID
167

103

S-09154 P42101 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:31:28
1 2 3 4 5 6 7 8 9 10 11 12

E-101 FEED / PRODUCT EXCHANGER


NOTE

1) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP (LOCKABLE)


FOR SETTING THE MINIMUM VALVE OPENING. THE OPENING IS SET
DURING COMMISSIONING.
A

PG
0204

4"-HC-0201-D24B-ET
101 P03
AH FEED
TIC TO A-101 A/B
0203
AL
B

E-101
B1 A2

4"-DSL-0201-D24A-H
A1 B2

PG
0202

TI
0202

PT PI
0201 0201

PG
E 4"-HC-0102-D24B-ET 0203
100 P01
FEED
FROM BL

TV
0203
4"-DSL-0202-D24A-ET 4"-DSL-0203-D24A-ET

3/4"
FC

3/4"
F
MIN. 10 x PIPE ID

D D

TI
0201

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

4"-DSL-1101-D24A-H
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-0204-D24A-P

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
165

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-06-0
H SHEET SIZE UNIT
P11
DIESEL PRODUCT

DIESEL PRODUCT

.
FROM E-106 A/B
P29

NAME
Feed preheat
P02
TO E-111

Piping and instrument diagram


DOCUMENT ID
116

S-09154 P42102 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:31:49
1 2 3 4 5 6 7 8 9 10 11 12

A-101 A /B FEED FILTER


NOTE

DESIGN OF CARTRIDGE TYPE FILTER BY VENDOR 1) THE PSV SETTING DOES NOT TAKE INTO ACCOUNT THE LIQUID
HEIGHT. DURING DETAILED DESIGN THE SET PRESSURE MUST
1 BE ADJUSTED.
A
265 psig 2) LOW POINT PROCESS DRAIN.
PSV
0304
Down LO
FL BL
PG

3/4"
0303 3/4"
D
D24B By EPC D
A-101 A

Down
LO
V1 P1

A1 S1
B
MINIMIZE D24B By EPC

B24A D24B
D1

U1

3/4"
B1

C D
MINIMIZE
2

OSW
4"-HC-0201-D24B-ET

B24B D24B
101 P02 CBD
FEED
FROM E-101

D
265 psig
PSV
0305
4"-HC-0301-D24B-ET

Down
LO
FL BL
PG

3/4"
0302 3/4"
D
D24B By EPC D

Down
LO
A-101 B V1 P1

A1 S1
E
MINIMIZE D24B By EPC

3/4"
D
D24B

B24A D24B
D1
B24B

2"-NI-0302-B24A-N
U1
3/4"

B1

F D
MINIMIZE
2

OSW
B24B D24B

CBD
4"-HC-0302-B24B-ET

4"-HC-0304-B24B-ET 4"-HC-0303-B24B-ET
102 P04
FEED
TO V-101
START-UP LINE
G

PDT
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
0301 and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-NI-0301-B24A-N

AH
PDI
0301
1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-07-0
H SHEET SIZE UNIT
BL

.
NAME
Feed filter
NITROGEN

P03
FROM BL

Piping and instrument diagram


DOCUMENT ID

S-09154 P42103 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:32:10
1 2 3 4 5 6 7 8 9 10 11 12

V-101 FEED SURGE DRUM


NOTE

1) SET POINT FOR CONTROLLERS TO BE DIFFERENT.

3"-HC-0505-B24B-ET
2) V-101 IS TRACED UPTO MAXIMUM LEVEL.
A P05 105
3) INTERFACE LEVEL.
Down
MINIMUM FLOW
FROM P-101 A/B
FL BL 4) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO ENSURE
SUFFICIENT NPSH FOR P-101 A/B.

PV
3/4" 5) LOW POINT PROCESS DRAIN.

B24B By EPC
D
0402 B
6) AMINE INJECTION PUMP AND TANK WILL BE PROVIDED BY
1 1 CHEMICAL VENDOR.

FC
AH 3/4"
PIC PIC 100 psig 100 psig
D
0402 A 0402 B PSV PSV
AL
0403 A 0403 B

LO

LO
B PV PV Down Down
PV
0402 A

3/4"
3/4"
2"-NG-0401-B24A-ET 3/4" 3/4"
B24B By EPC B24B By EPC
D D
D D

3/4"
3/4"

LC
FO

LO
B24A B24B
D D

PY PT By EPC-HC-0402-B24B-ET
0402 0402 PG

By EPC-HC-0401-B24B-ET
0401

2"-NG-0402-B24B-ET
AH
LIC
4"-HC-0303-B24B-ET 0402
C 102 P03 AL
FEED

MEDIAN
A-101 A/B

2 V-101 B1 S1 V1
A1 LY IS
0402 1

L7 L5 L3 L1

LZY LZAL
LG LZT LZT LZT 0402 0402
M1 2oo3
0401 0402 A 0402 B 0402 C
LZAH
M
B24A B24B 0402
D
L8 L6 L4 L2
U1
B2 IS
ELEVATION 2

D
TI 4
MINIMIZE 0401
L11 L9

3 3
AH
LI LT LG LG
E 0403 0403 0403 0404
M M

L12 L10 TYPE 2A


AP
0401

D1
INTERMITTANT LINE

F
5
6"-HC-0403-B24B-ET
106 P05
FEED

MINIMIZE
TO P-101 A/B
2"-NG-3302-B24A-ET

3"-SL-0401-B24A-H

2"-AM-0401-B24B-ET
IN VIEW
OSW

CBD

3/4"
D

G
OSW

CBD

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

103
AMINE Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-08-0
H SHEET SIZE UNIT
P33

6
BL

.
NATURAL GAS

P01
V-101 LEVEL NAME
TO FIC-0101
Feed surge drum
P04
LP STEAM
FROM BL

Piping and instrument diagram


FROM BL

DOCUMENT ID
174

S-09154 P42104 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:32:31
1 2 3 4 5 6 7 8 9 10 11 12

P-101 A /B FEED PUMP


NOTE

1) PUMP MINIMUM FLOW REQUIREMENT/ARRANGEMENT TO BE


REVIEWED DURING DETAILED DESIGN.

A 2) DIFFERENT TYPES OF NON-SLAMMING CHECK VALVES TO BE


INSTALLED TO MINIMIZE RISK OF FAILURE.

IS
FV 3
0503
B 3"-HC-0505-B24B-ET
P04 105
FO FZAL FFI

3/4"
MINIMUM FLOW

3/4"
TO V-101 0504 0505
D D AL

FZY FI FFY
B24B G24B 0504 0504 0505 RECYCLE OIL TO
1 AL
T COMP. FRESH FEED RATIO

FIC
AC
0503 AL UZLO UZLC

3"-HC-0504-G24B-ET
PI UZY 0501 0501

FT 0507 FZT 0501


C
0503 0504 IS
AH S
PDI PG PT 3 UZC
0501 0503 0507 UZV 0501
0501

PDT PG
B24B G24B 0501 0502

3/4"
P-101 A FC
MINIMIZE 2
D

MINIMIZE
6"-HC-0403-B24B-ET
106 P04
FEED 6"-HC-0510-G24B-ET
FROM V-101 FO
0502
D 3/4" ML UZY
D
0502
M 0502

MZAL
3"-HC-0509-G24B-ET

4"-HC-0502-G24B-ET
6"-HC-0501-B24B-ET

0502 IS
1
D
3/4"
IS
1
3

E
3"-HC-0508-G24B-ET

D24B G24B
AH
D PDI PG
0504 0506

PDT PG
0504 0505
3/4"

P-101 B
D

MINIMIZE
6"-HC-0511-G24B-ET FO
B24B G24B
0501
F
ML UZY
0503
M 0503
INTERMITTANT LINE

MZAL
0504 IS
START-UP LINE

START-UP LINE
1

IS
1

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

4"-HC-0503-G24B-ET
3"-HC-0104-D24B-ET

and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
3"-HC-0507-G24B-H

4"-HC-0506-G24B-H

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
206

125

107
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-09-0
H

RECYCLE OIL FLOW


RENEWABLE FEED
SHEET SIZE UNIT
P01

P15
.

TO R-101 / R-102
FROM V-109 A/B

P23

P15

P07
FLUSHING OIL

START-UP OIL

START-UP OIL
TO P-102 A/B

NAME
Feed pump
P05
TO C-101

FIC-1501
Piping and instrument diagram
DOCUMENT ID
104

129
S-09154 P42105 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:32:52
1 2 3 4 5 6 7 8 9 10 11 12

DESIGN BY VENDOR/EPC CONTRACTOR


H-101 HEATER
H-101 NOTE

1) MIN. 2 TUBE SKIN THERMOCOUPLES PER PASS.


TI PG
2) TO BE LOCATED AT SAFE DISTANCE (MIN. 50 ft) FROM H-101.
0607 0607
A
HIC 3) VENDOR/EPC CONTRACTOR MUST DESIGN INLET AND OUTLET
0601 MANIFOLD PIPING IN A WAY WHICH ENSURES THAT EACH
TUBE PASS CONTAINS EQUAL AMOUNTS OF GAS AS WELL AS
LIQUID. THE INLET SPLITS MUST EACH HAVE TWO OUTLETS
THAT ARE SYMMETRICAL AND FLUID DISTRIBUTION MUST BE
UNAFFECTED BY GRAVITY. THE UPSTREAM BEND TO EACH SPLIT
MUST BE PERPENDICULAR TO THE PLANE OF THE SPLIT.
FL/DO ESTIMATED NUMBER OF HEATER PASSES IS TWO.
HZV
0601
E DIA
x PIP
. 10
MIN
TYPE 9
AP
B 0602 E DIA
PG PIP
AH x
0605 TI . 10
AH MIN
0606 PZT MEDIAN PI
0606 A 0606
E DIA

MEDIAN
PIP
x
2oo3
. 10
PI PZT PZY PZAH IS MIN
0602 IS TZAH TZY 0606 B 0606 0606 6
6 0606 0606 4) BURNER MANAGEMENT SYSTEM SHALL BE INCLUDED.

PG PT 2oo3 PZT 5) INSTRUMENTATION FOR EACH BURNER BLOCK.


0601 0602 0606 C
3 7
6) STEAM FOR SNUFFING.

C 7) SPOOL PIECE FOR PIGGING/DECOKING.

8) HEATER EMERGENCY SHUT-DOWN PUSH BUTTON. TO BE


PROVIDED AT SAFE DISTANCE (MIN. 50 ft) FROM HEATER.
O2
AT AI 9) CONNECTION TO HAVE TOP ENTRY.
AH
TI 0601 0601
10 AL 10) INSTRUMENTATION FOR EACH HEATER PASS.
0604
AH AH
TI TI TI 11) UTILITY CONNECTION FOR SODA ASH WASHING.
AH
0603 0602 TI MIN. 10 X PIPE ID 0601
10 7 9
1 0605
MINIMIZE 8"-HC-0601-G44A-H 10"-HC-0602-G44A-H
108 P07
MAIN PILOT 3" REACTOR FEED
D
IS BZAL BZSL BZSL BZAL IS MIN. 10 x PIPE ID TO R-101
5A 0602 0602 0601 0601 7A 3
PT PG
8 5 5 AH
TI TZAH 11 0604 0603

BURNER MANAGEMENT 0608 0608


SYSTEM
HZS IS IS PI
0601 6 8 0604
4 IS
6
(REFER TO P33 FOR NATURAL GAS SECTION)

F 2

G
By EPC-SL-0601-B24A-H

6"-HR-0904-G44A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
8"-HC-0904-G44A-H

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-10-0
H SHEET SIZE UNIT
P09

P09
BL

FROM E-103 A/B


RECYCLE OIL

NAME
FROM E-104

TREAT GAS
Heater
P06
LP STEAM
FROM BL

Piping and instrument diagram


DOCUMENT ID
110

109
S-09154 P42106 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:33:12
1 2 3 4 5 6 7 8 9 10 11 12

R-101 HDO REACTOR 1 X-101 STATIC MIXER 1


NOTE

1) 4 TOP LAYER THERMOELEMENTS TI-0703/0708 A-D


(SEE DETAIL A).

A 2) 8 BOTTOM LAYER THERMOELEMENTS


TI-0707/0712 A-H. SEE DETAIL B

3) REACTOR SKIRT HEIGHT MUST ENABLE SUITABLE


CATALYST UNLOADING THROUGH DUMP NOZZLES. TO BE
DETERMINED DURING DETAILED DESIGN.
H47A G24B

4"-HC-0701-H47A-ET 4"-HC-0702-G24B-ET 4) TRACING TEMPERATURE TO BE MAINTAINED ABOVE 350°F.

5) CONNECTION TO HAVE TOP ENTRY.

PI
6) UTILITY CONNECTION FOR SODA ASH WASHING.
0703
MIN. 5 ft.

7) 4 SKIN THERMOCOUPLES.

B PT PG 6 8) 4 MIDDLE LAYER THERMOELEMENTS


10"-HC-0602-G44A-H 0703 0704
TI-0704/0705/0706/0709/0710/0711 A-D SEE DETAIL "A"
5
MIN 10 x PIPE ID

3"
10"-HC-0704-H47A-H
108 P06
REACTOR FEED AD
FROM H-101 TIC
X-101 0701 R-101 AH 3/4"
DETAIL A
TI FV
1 D
0703 A 0703 REACTOR
B-D WALL

FC
4 AH
A1/M1 TI
8 3/4"
0704 A I FIC
B-D D
103 0703
C AH AL
TI
T1 8
0705 A
AH B-D
PDI PDT
0701 0701 DETAIL B
AH
TI FT REACTOR
8 WALL
0706 A 0703
B-D
AH
TI
4 H1 T3 2
0707 A
B-H 6"-HC-0708-H47A-H

D
5 H47A G24B MINIMIZE
6"-HC-0705-G24B-ET
A2

MINIMIZE
MIN. 5 ft 5

F24A G24B
AH
TI I FV 3/4"
T2 1 D
0708 A 103 0702
B-D

FC
AH
TI
AH 8

3"-HR-0701-F24A-H
PDI PDT 0709 A FIC 3/4"
B-D D
E 0702 0702 0702
AH AL
TI
8
0710 A
7 B-D
H2 T4 AH
TI
8
TI 0711 A FT
B-D
0713 A 0702
B-D
ELEVATION TI FV 3/4"

3"-HC-0706-G24B-ET

4"-HC-0703-G24B-ET
2 D
0712 A 0704
B-H
3

FL/DO
B1

FIC 3/4"
F D
4 0704
AL

FT FIC I
0701 0701 103

FT
B24A H47A 0704 FV
PI 0701
5 3"-HC-0710-G24B-ET
0706
3/4"

182 P08

3/4"
FC RENEWABLE FEED

3/4"
D 3"-HC-0707-G24B-ET
MINIMIZE PG PT TO R-102
AH D D
0705 0706 TI
G
0714
12"-HC-0709-H47A-H
185 P08
4" HDO REACTOR 1 EFFLUENT
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
TO R-102 and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
5

4"-HC-0503-G24B-ET
3"-HR-1007-F24A-H
3"-NI-0701-B24A-N

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
173
R-101 INLET TEMPERATURE

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-11-0
H
RENEWABLE FEED

SHEET SIZE UNIT


P10

P05
BL

.
FROM K-102 A/B

FROM P-101 A/B


SOAKING GAS
P33

NAME
TO PIC-3308

HDO reactor 1
NITROGEN

P07
FROM BL

Piping and instrument diagram


DOCUMENT ID
114

107

S-09154 P42107 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:33:35
1 2 3 4 5 6 7 8 9 10 11 12

R-102 HDO REACTOR 2 X-102 STATIC MIXER 2 NOTE

1) 4 TOP LAYER THERMOELEMENTS TI-0802/0808 A-D


(SEE DETAIL A).

A 2) 8 BOTTOM LAYER THERMOELEMENTS


TI-0807/0811 A-H. SEE DETAIL B

3) REACTOR SKIRT HEIGHT MUST ENABLE SUITABLE


CATALYST UNLOADING THROUGH DUMP NOZZLES. TO BE
G24B H47A DETERMINED DURING DETAILED DESIGN.
3"-HC-0803-H47A-ET
3"-HC-0710-G24B-ET 4) TRACING TEMPERATURE TO BE MAINTAINED ABOVE 350°F.
182 P07
RENEWABLE FEED 5) CONNECTION TO HAVE TOP ENTRY.
FROM P-101 A/B
PI
6) UTILITY CONNECTION FOR SODA ASH WASHING.
0805
7) 4 SKIN THERMOCOUPLES.

MIN. 5 ft.
B PT PG 6 8) 4 MIDDLE LAYER THERMOELEMENTS
0805 0806
TI-0803/0804/0805/0806/0809/0810 A-H SEE DETAIL "A"
TI
X-102 0801 5
4"
12"-HC-0709-H47A-H 12"-HC-0801-H47A-H
185 P07 AH
MIN 10 x PIPE ID TI DETAIL A
HDO REACTOR 1 EFFLUENT 1
FROM R-101 0802 A REACTOR
B-D WALL
AH
R-102 TI
4 8
0803 A
B-D
AH
A1/M1 TI
8
0804 A
C B-D
AH
TI DETAIL B
AH T1 8
PDI PDT 0805 A REACTOR
B-D WALL
0804 0804
AH
TI
8
0806 A
B-D
AH
TI
4 T3 2
0807 A
H1 B-H
4"-HR-0802-H47A-H

D
5 H47A F24A
4"-HR-0801-F24A-ET
A2
MIN. 5 ft.

AH AD
TI TY TIC
T2
0808 A 0808 0808
B-D AVG
AH
TI
AH 8
PDI PDT 0809 A
B-H
E 0803 0803 TI FV 3/4"
7 T4 8 D
0810 A 0801

SP
H2 B-D

FL/DO
TI TI
2 3/4"
0812 A 0811 A FIC
B-D B-H D
ELEVATION 0801
AL
3
B1

FT
0801
F 4

B24A G44A

NNF
PI
5
0801
3/4"

D
PG PT
MINIMIZE AH
0802 0801 TI
G
0813
12"-HC-0802-G44A-H
111 P09
4" HDO REACTOR 1 EFFLUENT
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
TO E-102 and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
5
3"-NI-0801-B24A-N

3"-HR-1008-F24A-ET

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-12-0
H SHEET SIZE UNIT
P10
BL

.
FROM K-102 A/B
SOAKING GAS

NAME
HDO reactor 2
NITROGEN

P08
FROM BL

Piping and instrument diagram


DOCUMENT ID
207

S-09154 P42108 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:33:56
1 2 3 4 5 6 7 8 9 10 11 12

E-102 A /B HDO REACTOR EFFLUENT/TREAT GAS EXCHANGER E-103 A /B ISOM REACTOR EFFLUENT/TREAT GAS EXCHANGER E-104 RECYCLE OIL / EFFLUENT EXCHANGER 1
NOTE

1) UTILITY CONNECTION FOR SODA ASH WASHING.

2) CONTROL FUNCTION FOR TIC-0901.


A
VALVE OPENING, %
12"-HC-0901-G44A-H
112 P10 100
HDO REACTOR EFFLUENT A B
TO R-103

12"-HC-1002-G44A-H
P10 113 OUTPUT, %
ISOM REACTOR EFFLUENT 0 50 100
FROM R-103
TI 3) CONNECTION TO HAVE TOP ENTRY.
PG 0905 AL
4) QUENCH NOZZLE.
B 0901 TI MIN. 10 X PIPE ID
0906 PROCESS FLOW
12"-HC-0802-G44A-H 6"-HR-0906-G44A-H
111 P08
TI
HDO REACTOR 2 EFFLUENT

6"-HR-0907-G44A-H
FROM R-102 0904
PROCESS
FLOW

PG
0905 PG
E-102 B E-103 B E-104 0907
A1 B2 A1 B2 A1 B2

C
TI
B1 A2 B1 A2 B1 A2 0907

12"-HC-0905-G44A-H
E-102 A E-103 A D 1
4"
A1 B2 A1 B2

3,4

B1 B1 4"-HC-0903-G44AX-ET
A2 A2
D
TI
0903

PG

MIN. 10 X PIPE ID
0909 PG PG
AD
TIC 0902 TI 0903
2
0901 0902 PG
D 1 D 1
0904
3" 3"
6"-HR-0905-F24A-H

TI
0908

E PG

6"-HR-0909-G44A-H
0906
6"-HR-0903-F24A-H

THIC THIC HV 3/4"


D
0901 A 0901 B TI 0901

G24BX G44AX
0909

FO
AL
D

COOL DOWN LINE


HIC 3/4"
3/4" D
FO 0901
FO

0901

TV
D
3/4" 0901 A I
F
PG 116
G44A 0908
6"-HR-0901-F24A-H

F24A

NNF
TV
0901 B
G 6"-HR-0902-F24A-H

FC
3/4"

3/4"

D D Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

4"-HC-1507-G24BX-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
12"-HC-0902-F36B-H

8"-HC-1206-G24A-H

8"-HC-0904-G44A-H

6"-HR-0904-G44A-H
6"-HR-1902-F24A-H

6"-HR-0908-F24A-ET

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
FO
REV. DESCRIPTION DATE DRAWN CHECK APPR.
0903
117

110

109
ISOM REACTOR EFFLUENT

RECYCLE OIL / TREAT GAS

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-13-0

BYPASS RECYCLE OIL


H SHEET SIZE UNIT
P19

P12

P15
.
FROM K-102 A/B

FROM P-102 A/B


TO E-105 A/B/C
P11

P06

P06
RECYCLE OIL
NAME
FROM E-112
TREAT GAS

TREAT GAS
Reactor effluent cooling I
P09
TO H-101

TO R-101
Piping and instrument diagram
DOCUMENT ID
136

118

126
S-09154 P42109 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:34:18
1 2 3 4 5 6 7 8 9 10 11 12

R-103 ISOM REACTOR


NOTE

1) 4 TOP LAYER THERMOELEMENTS TI-1002/1005 A-D. SEE DETAIL A.

2) 12 BOTTOM LAYER THERMOELEMENTS TI-1003/1006 A-L.

G44A F24A
A SEE DETAIL B. TRANSMITTERS TO BE PROVIDED WITH DOWNSCALE

3"-HR-1001-G44A-H
BURNOUT.

3) TRACING TEMPERATURE TO BE MAINTAINED ABOVE 350°F.

TIC PG 5 4) REACTOR SKIRT HEIGHT MUST ENABLE SUITABLE CATALYST

MIN. 5 ft.

3"-HR-1002-F24A-H
1001 1005 UNLOADING THROUGH DUMP NOZZLES. TO BE DETERMINED
6 DURING DETAILED DESIGN.
4"
12"-HC-0901-G44A-H 12"-HC-1001-G44A-H
112 P09
5) UTILITY CONNECTION FOR SODA ASH WASHING.
HDO REACTOR EFFLUENT
FROM E-102 A/B MIN. 10 x PIPE ID 6) CONNECTION TO HAVE TOP ENTRY.
6,9
PT 7) 4 SKIN THERMOCOUPLES. TRANSMITTERS TO BE PROVIDED WITH
1006 R-103
DOWNSCALE BURNOUT.
B 3
PI A1/M1
8) 8 SKIN THERMOCOUPLES. TRANSMITTERS TO BE PROVIDED WITH
1006 DOWNSCALE BURNOUT.
AH 9) QUENCH NOZZLE.
PDI PDT 1
1004 1004
AH QUENCH GAS
TI
AH
TI T1 1002 A
B-D AH
1004 A TI
B-H
2 1003 A PROCESS
8 B-L FLOW

C 3 IS TZAH TZY TZY TZAH IS


T3
4 1004 1004 1003 1003 4 FV 3/4" 10) IF TI -1008 A-H IS INSTALLED ON INNER WALL OF REACTOR THEN 4
1oo8 1oo12 D
1001 SKIN THERMOCOUPLES TO BE INSTALLED ON OUTER WALL OF
H1
REACTOR.

FL/DO
G44A F24A DETAIL A
SP
4"-HR-1006-G44A-H 4"-HR-1005-F24A-ET 3/4" REACTOR
FIC WALL
A2 D
1001

6
MIN. 5 ft.

AH AD
TI TY TIC FT
D
T2 1005 A 1005 1005 1001
AH B-D AVG DETAIL B
PDI PDT
AH REACTOR
1003 1003 TI WALL
1006 A
B-L
3
FV 3/4"
D
8 TZY TZAH IS 1002
T4
1006 1006 4

FL/DO
1oo12
IS TZAH TZY SP
4 1008 1008 2 FIC 3/4"
1oo8 D
1002
AH
E ELEVATION TI
AH 10
PI TI 1007 A
B-D
1002 1008 A 4 H2
B-H
B1
PG PT 7 FT
AH
1001 1002 TI 1002
1010 6 TZY TZAH IS

3"-HR-1003-F24A-H
12"-HC-1002-G44A-H 1009 1009 4

3"-HR-1004-F24A-ET
P09 113 1oo4
ISOM REACTOR EFFLUENT 4"
TO E-103 A/B
6 AH
TI
5 1009 A
F
MINIMIZE

B-D

D
3/4"
G44A
B24A

NNF
G

3"-HR-1008-F24A-ET
3"-HR-1007-F24A-H

4"-HR-1904-F24A-H
3"-NI-1001-B24A-N

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

SOAKING AND QUENCH GAS


114

207
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-14-0
H SHEET SIZE UNIT
P19
BL

FROM K-102 A/B


.
P07

P08
SOAKING GAS

SOAKING GAS
NAME
Isom reactor
NITROGEN

P10
FROM BL

TO R-101

TO R-102
Piping and instrument diagram
DOCUMENT ID
141

S-09154 P42110 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:34:40
1 2 3 4 5 6 7 8 9 10 11 12

E-105 A /B /C REACTOR EFFLUENT / STRIPPER FEED EXCHANGER E-106 STRIPPER FEED / BOTTOMS EXCHANGER NOTE

1) PSV IS PROVIDED FOR PROTECTION OF PIPING IN CASE OF


195 psig
TUBE RUPTURE IN E-105 A/B/C. DURING DETAILED DESIGN
PSV IT WILL BE REVISITED IF PIPING DESIGN PRESSURE SHALL
Down
A FL BL
1110 A BE INCREASED TO HANDLE TUBE RUPTURE CASE.

3/4"
LO
195 psig 3/4"
D
PSV D

LO
1110 B By EPC D24BX
Down

3/4"
LO
3/4"
D
D

Down

LC
D24BX By EPC
By EPC D24BX

B
By EPC-HC-1104-D24BX-ET
By EPC-HC-1103-D24BX-ET

MINIMIZE
1

E-105 C
B2 A1

A2 B1
C

E-105 B E-105 A
B2 A1 B2 A1

PI
1109

A2 B1 A2 B1
PG PT
1107 1109

D 12"-HC-1101-F36B-H
TI
119 P12
1104
REACTOR EFFLUENT
PG TI TO X-103
1108 1105 AL

6"-HC-1102-D24BX-H
E
E-106
A2 B1
PG
1101

B2 A1
PT PI
1102 1102

PG
1103

TI
1101
F AL
NO VAPOR POCKETS

PG
1104

TI PG
1106 1105

NNF 4"-DSL-1102-D24A-ET TI
1103

TI PT PI
G
1102 1106 1106
6"-HC-1105-D24BX-H
12"-HC-0902-F36B-H

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
4"-HC-1402-B24BX-N

and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-2704-D24A-H

4"-DSL-1101-D24A-H

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
151

116

Seaboard Energy, USA


ISOM REACTOR EFFLUENT

HDT renewable feedstock Client Doc. No.:32000-PID-15-0


H SHEET SIZE UNIT
P09

P27

P14
DIESEL PRODUCT

DIESEL PRODUCT

.
STRIPPER FEED

STRIPPER FEED
P23

P02

NAME
FROM E-104

FROM E-109

FROM V-103

Reactor effluent cooling II


P11
TO C-101

TO E-101

Piping and instrument diagram


DOCUMENT ID
117

162

122

S-09154 P42111 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:35:01
1 2 3 4 5 6 7 8 9 10 11 12

E-112 RECYCLE OIL / EFFLUENT EXCHANGER 2 X-103 STATIC MIXER 3 E-107 REACTOR EFFLUENT AIR COOLER NOTE

1) VENDOR/EPC CONTRACTOR MUST DESIGN INLET AND OUTLET


MANIFOLD PIPING IN A WAY WHICH ENSURES THAT EACH
BUNDLE CONTAINS EQUAL AMOUNTS OF GAS AS WELL AS
A LIQUID. THE INLET SPLITS MUST EACH HAVE TWO OUTLETS
THAT ARE SYMMETRICAL AND FLUID DISTRIBUTION MUST BE
UNAFFECTED BY GRAVITY. THE UPSTREAM BEND TO EACH SPLIT
MUST BE PERPENDICULAR TO THE PLANE OF THE SPLIT.
MINIMIZE
.
x DIA
. 10
N
MI

PG
1201 TI
1202 AL
12"-HC-1101-F36B-H 12"-HC-1201-F761AX-H
.
119 P11
x DIA
10
REACTOR EFFLUENT MIN. 10 X PIPE ID N.
B FROM E-105 A/B/C MI
X-103
PI PT
1202 1202 .

NO LIQUID POCKETS
x DIA
. 10
N
MI

2) ESTIMATED NUMBER OF BUNDLES IS EIGHT. NUMBER OF BUNDLES


AND FANS TO BE VERIFIED BY VENDOR.

3) HIGH VIBRATION SWITCH FOR TRIP OF AIR COOLER FAN


E-112 TO BE FURNISHED BY VENDOR.
B2 A1
C
4) INDIVIDUAL WASH WATER QUENCH NOZZLE TO EACH BUNDLE
TYPICAL DETAIL.

F491AX F24A
A2 B1 PROCESS FLOW
PG

MINIMIZE
TI 1205
1201
AL PROCESS
12"-HC-1202-F491AX-P
FLOW
6"-HC-1205-F24BX-N

5) 50 % OF AIR COOLER FANS TO HAVE VARIABLE PITCH OR


8 VARIABLE SPEED DRIVE FOR TEMPERATURE CONTROL.

PG 6) INDIVIDUAL WASH WATER CONNECTION TO EACH BUNDLE.


D
1204
7) INSTRUMENTATION FOR EACH TUBE BUNDLE
G40AX F491AX
1
MINIMIZE 8) CONNECTION TO HAVE TOP ENTRY.
PG FG
4
1203 1201

3/4"
TI
1204 D 6

NO LIQUID POCKETS

MIN. 10 x PIPE ID
7
START-UP LINE TI
8
1203

F24A G24A
MIN. 10 x PIPE ID

HIC
E 1202
6"-HR-1201-F24A-ET

6"-HC-1204-F24BX-N

8
2 E-107
F24B F24BX

3 TI
DESIGN BY VENDOR/EPC CONTRACTOR

7
HV 1206
F D
3/4" 1201 FV VSHH VAHH
G24BX F24BX

D
3/4" 1501 1201 1201
FC

NNF
FC

D
3/4" HIC
1201
D M
3/4" 1

MIN. 10 x PIPE ID
ML
1201

G 5
AH
3"-SW-1605-G40AX-ET

TIC
3"-SW-1604-G40AX-ET

1205
6"-HC-1506-G24BX-N
6"-HR-1903-F24A-ET

AL
3"-HR-1905-F24B-H
8"-HC-1206-G24A-H

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

PG
1206

PI PT 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


1207 1207 0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
10"-HC-1203-G40AX-N
118

120 P13 Seaboard Energy, USA


RECYCLE OIL/TREAT GAS

HDT renewable feedstock Client Doc. No.:32000-PID-16-0


GAS / LIQUID
H TO V-102 SHEET SIZE UNIT
P19

P19

P15

P15

P16

P19

P16
RECYCLE WATER

RECYCLE WATER

.
FROM K-102 A/B

FROM K-102 A/B

FROM P-102 A/B

FROM P-103 A/B

FROM P-103 A/B


FROM FIC-1501

RECYCLE GAS
FROM FV-1901
P09

RECYCLE OIL

NAME
TREAT GAS

TREAT GAS

Reactor effluent cooling III


P12
TO E-104

Piping and instrument diagram


SIGNAL

DOCUMENT ID
138

139

128

127

195

229

132

S-09154 P42112 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:35:22
1 2 3 4 5 6 7 8 9 10 11 12

V-102 HIGH PRESSURE COLD SEPARATOR HV HIC


NOTE
920 psig 1302 1302

By EPC F24BX PSV By EPC-HR-1303-F24BX-ET 1) LOW POINT PROCESS DRAIN.

By EPC-HR-1302-F24BX-ET
1303 A FC

3/4"

3/4"
Down 2) INTERFACE LEVEL.
LO
A FL BL
D 4,8 D
3) EMERGENCY DEPRESSURIZATION PUSH BUTTON. MUST BE

3/4"
AO
920 psig UZLO UZLC EASILY ACCESSIBLE.
D
By EPC F24BX PSV D 3/4" 3 UZY 1303 1303

Down
4) LOCATED AT FIRE SAFE LOCATION.

LO
1303 B 1303

LO
LO HZS IS 5) AIR BOTTLE TO BE PROVIDED TO ALLOW FOR AT LEAST 3

Down
3/4" By EPC-HR-1305-F24BX-ET S VALVE STROKES.
1301 4 UZO

3/4"
D
UZV 1303 FSO F24BX By EPC 6) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO
LC LC 1303 1302 ENSURE SUFFICIENT NPSH FOR P-103 A/B.
D
Down Down
FL BL 7) WATER COMPARTMENT TO BE TRACED UP TO MAX.
By EPC-HR-1304-F24BX-ET LO LO FO LO LO INTERFACE LEVEL.

3/4"
3/4"
TI
B D D 8) HV-1302 TO BE USED AS BACKUP FOR UZV-1303. HV-1302 IS USED

By EPC-HR-1301-F24BX-ET
4,5 1301
FOR CONTROLLED DEPRESSURIZATION OF UNIT DURING
NO LIQUID POCKETS
SHUT-DOWN ALSO. MAX. FLOW IS GOVERNED BY FSO-1302.
10"-HC-1203-G40AX-N
120 P12
PG LZAH IS 9) DIFFERENT TYPES OF CHECK VALVES TO BE INSTALLED TO
GAS / LIQUID
1302 1301 9 MINIMIZE RISK OF FAILURE.
FROM E-107 PT
2oo3 1306
LZY LY LZAL IS 10) PIPE SPEC TO BE UPDATED BY EPC ONCE THE DESIGN OF THE
1301 1301 1301 10 HYDROGEN PRODUCTION UNIT IS FINALIZED.
V-102 S1 V1 B1
AH
A1 PIC

MEDIAN
1306
AL
IS
L1 L3 L5 L7 L9 L11 L13
12

C 2 2 2

LZT LG LZT LG LZT LG LG LZT LZT LZT


M1 M2
1303 C 1303 C 1303 B 1303 B 1303 A 1303 A 1302 1301 C 1301 A 1301 B
M M M M

F24BX B24A
B24A G40AX L2 L4 L6 L8 L10 L12 L14
U2
U1 B3 B2

ELEVATION D
7
D MINIMIZE
D 1 1 6
MINIMIZE IS LZAL LZY
AC
13 1303 1303 UZLC UZC
2oo3
MINIMIZE 1301 1301
START-UP LINE

MEDIAN LY UZLO
1303 1301
9

FC
AH OSW OSW
LIC I
1303 113 CBD CBD
UZY S 1301
AL
1301 UZV

FT FI IS
E 1301 1301 12
AL
2"-SL-1302-B24A-H

IN VIEW

6"-HC-1301-F24BX-N
IS
AH
IS 13 I LIC
14 UZY UZV 112 1301
AL
UZV UZY 1302 S 1302
1304 S 1304

FC
LIC HS SELECTOR
FC

UZLO 1301 B 1301 SWITCH

UZLO 1302
F
1304 LIC
AC D D
UZLC UZC 3/4" 3/4" 1301 A
AC
UZC UZLC LV 1302 1302

FC

FC
1304 1304 1303
2"-SW-1301-G40AX-ET LV LV
D D
PG FC 3/4" 1301 B 3/4" 1301 A
3/4"

3/4"

1304
D D

PZT PZAL PI
1305 1305 1305
2"-BF-1301-HOLD-ET

AL
6"-HC-1302-F24BX-N
FSO
G 10 121 P14
TI 1303
COLD LIQUID
1302

8"-HR-1306-F24BX-ET
IS AP TO V-103
4"-SW-1303-G40AX-ET

14 1301
2"-SW-1606-G40AX-ET

2"-SW-1302-G40AX-ET

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
TYPE 4B and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-1301-B24A-H

3/4"
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
175

130

146

133
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-17-0
H SHEET SIZE UNIT
P16
BL

BL

V-102 PRESSURE
FROM P-103 A/B
MINIMUM FLOW

RECYCLE GAS
P32

P16

P21

P17
SOUR WATER

SOUR WATER
TO P-103 A/B

NAME
High pressure cold separator

TO HS-1306
P13
LP STEAM
FROM BL

FROM BL

TO V-104

TO V-105
Piping and instrument diagram
HP BFW

DOCUMENT ID
131

S-09154 P42113 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:35:46
1 2 3 4 5 6 7 8 9 10 11 12

V-103 LOW PRESSURE FLASH DRUM NOTE


180 psig
PSV 1) LOW POINT PROCESS DRAIN.
1407 A
Down 2) INTERFACE LEVEL.
LO
A FL BL
3) CONNECTION TO HAVE TOP ENTRY.

3/4"
AH
180 psig 3/4" TI
D 3 4) SPLIT RANGE CONTROL FUNCTION OF PIC-1401.
PSV D 1402

Down

LO
1407 B VALVE OPENING, %
LO By EPC B24BX
100

MINIMIZE
3/4"
3/4" PG

B24BX
D LC A B
D 1406
By EPC B24BX FT

D24A
AH
PT PIC 1402
By EPC-OG-1402-B24BX-ET
OUTPUT, %

By EPC-OG-1401-B24BX-ET
6"-HC-1302-F24BX-N 1401 1401
0 50 100

IN VIEW
121 P13 4 AL
B LZAL IS FI
COLD LIQUID
FROM V-102 1403 17 1402 5) LOCAL OPERATION MUST BE POSSIBLE FROM SAFE LOCATION.
3/4"
MEDIAN
AH D 6) AIR BOTTLE TO BE PROVIDED TO ALLOW FOR AT LEAST 3
LZY LY LIC VALVE STROKES.
1403 1403 1403

3"-OG-1403-B24BX-ET

3"-OG-1404-B24BX-ET
AL
2oo3 7) EMERGENCY VALVES/ACTUATORS ETC. WITHIN A FIRE SCENARIO
ENVELOPE ARE TO BE FIRE SAFE/FIREPROOFED IN ACCORDANCE
V-103 WITH API 553.

50-100 %
A2 A1 S1 V1 B1

0-50 %
8) PERMISSIVE TO START PUMP P-102 A/B WITH FULLY OPEN HV-1401.

L7 L1 L3 L5 9) INTERMEDIATE LIMIT SWITCHS. TO BE INSTALLED AT OPENING


POSITION ALLOWING USE OF PARTIAL STROKE TEST WITHOUT
C ACTIVATION OF TRIP GROUP.

10) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO


LG LZT LZT LZT PHIC 3/4"
M1 D ENSURE SUFFICIENT NPSH FOR P-102 A/B AND SUFFICIENT
1402 1403 A 1403 B 1403 C 1401 A TYPE 4B HEAD TO OVERCOME FRICTIONAL AND CONTROL VALVE
M AP PRESSURE LOSS IN CONNECTING PIPE BETWEEN V-103

FC
1402
AND V-104.
B24A B24BX 3/4"
L8 L2 L4 L6
PV 11) BOOT TO BE TRACED UP TO MAX. INTERFACE LEVEL.
D
1401 A
B2
U1
PHIC 3/4"
D
ELEVATION 1401 B
L11 L9
D 2oo3

FC
D 2 2
MINIMIZE HZZAL HZZY 10
1401 1401 PV 3/4" PG
D

By EPC B24BX
LT LG LG 1401 B 1405
1401 1401 1404 9
HZLC
M M
IS 1401
1

Down
15

HZLO
L12 L10 8
1401
H1 FL BL

11

FC
B3 6,7 OSW

CBD
S HY HV
E 1401 1401 8"-HC-1404-B24BX-N
124 P15
CLOSE RECYCLE OIL

4"-HC-1401-B24BX-N
1
HSS TO P-102 A/B
5
1401 C

START-UP LINE
MINIMIZE
OPEN
HSS 3
1401 B PT PI
AH
LIC CLOSE 1404 1404
1401 HSS FT
AL OSW
1401 A 1401 TI
CBD 1401
ON/OFF

F LV
1401 3/4" FIC SP
D
2"-SW-1401-B24CX-ET 1401

AP
3/4"

3/4"

FC TYPE 4B
FC

1403
NNF

3/4" FV I
D D
D
1401 117

3"-OG-1405-B24BX-ET
NNF
G

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-1402-B24CX-ET

2"-OG-3201-B24BX-ET
3"-HC-1403-B24BX-ET
3"-HC-1508-F24BX-ET

2"-PC-1702-F24BX-ET

4"-HC-1402-B24BX-N

and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

2"-HG-2002-D24A-N
3"-SL-1401-B24A-H

3/4"
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN

FROM MAKE-UP HYDROGEN BL


REV. DESCRIPTION DATE DRAWN CHECK APPR.
202

152

122

Seaboard Energy, USA


STRIPPER FEED BYPASS

HDT renewable feedstock Client Doc. No.:32000-PID-18-0

TO H2S REMOVAL UNIT


PRESSURIZATION GAS

H SHEET SIZE UNIT


P15

P17

P20

P32
BL

.
STRIPPER FEED
FROM P-102 A/B
MINIMUM FLOW

P32

P23

P11
CONDENSATE

SOUR WATER

BL
NAME
FROM V-105

FROM V-104
Low pressure flash drum
TO TV-2301

P14
LP STEAM
FROM BL

OFF GAS
TO V-104

TO E-106

Piping and instrument diagram

OFFGAS
DOCUMENT ID
123

134

142

177
S-09154 P42114 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:36:10
1 2 3 4 5 6 7 8 9 10 11 12

P-102 A /B RECYCLE PUMP NOTE

1) PUMP MINIMUM FLOW REQUIREMENT/ARRANGEMENT TO BE


REVIEWED DURING DETAILED DESIGN.

A 2) DIFFERENT TYPES OF NON-SLAMMING CHECK VALVES TO BE


INSTALLED TO MINIMIZE RISK OF FAILURE.

3) DMDS INJECTION PUMP AND TANK WILL BE PROVIDED BY CHEMICAL


VENDOR.
IS
6

IS
16

FZAL I
1501 116
B
2oo3
MEDIAN AD
FZY FY FIC PV
1501 1501 1501
AL
T COMP.

FZT FZT FZT


1501 A 1501 B 1501 C
AC
UZLO UZLC
PI UZY 1501 1501
1507 1501
C
PDI AH IS
S
1501 PG PT 16 UZC
1503 1507 UZV 1501
1501

PDT PG
1501 1502 FC

3/4"
B24BX G24BX
P-102 A
8"-HC-1404-B24BX-N D 2
124 P14

MINIMIZE
RECYCLE OIL 8"-HC-1502-G24BX-ET

3"-HC-1505-G24BX-ET
FROM V-103 FT
MINIMIZE

1502

6"-HC-1504-G24BX-ET
D

G24BX
ML UZY
1501
M 1502

G24B
MZAL
D
1502 IS 3/4"
15
D
3/4" 1
IS
B24B B24BX

15
8"-HC-1501-B24BX-ET

FIC
D
1502 3/4"

G24BX
FO
E
AH
PDI FV

F24BX
D
1504 PG 1502 3/4"
1506
2"-DS-1501-B24B-N

PDT PG
1504 1505
3/4"

P-102 B
D

8"-HC-1503-G24BX-ET

B24BX G24BX
F
ML UZY
DMDS 1503
M 1503

MZAL
3
1504 IS
15

IS
START-UP LINE

15

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

4"-HC-1507-G24BX-ET
3"-HC-1508-F24BX-ET

6"-HC-1506-G24BX-N
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-HC-0506-G24B-H

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
123

127

129

126

128
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-19-0

BYPASS RECYCLE OIL


H

RECYCLE OIL FLOW


SHEET SIZE UNIT
P05

.
FROM P-101 A/B
MINIMUM FLOW
P14

P12

P05

P09

P12
START-UP OIL

RECYCLE OIL
TO FFY-0505
NAME
Recycle pump

TO FV-1501
P15

TO H-101
TO V-103

TO E-112
Piping and instrument diagram

SIGNAL
DOCUMENT ID
125

S-09154 P42115 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:36:31
1 2 3 4 5 6 7 8 9 10 11 12

P-103 A/B WATER CIRCULATION PUMP NOTE

1) PUMP MINIMUM FLOW REQUIREMENT/ARRANGEMENT TO BE


REVIEWED DURING DETAILED DESIGN.

PDI AH
1605 PG
1602

PDT PG 3"-SW-1602-G40AX-ET
1605 1607 P-103 A

3/4"
4"-SW-1607-G40AX-ET D

FO
ML 1604
1601
M

UZY
1602

IS
PDI AH 13
D
1606 PG
1603

PDT PG 3"-SW-1603-G40AX-ET
1606 1604 P-103 B

3/4"
4"-SW-1601-G40AX-ET D

PI PT
1601 1601
FO
ML 1603
E 1603
M

UZY
1604

IS
13 FT
FO
1 1601
1602

LO
F

I FIC 3/4"
D
113 1601
AL
T COMP.

FC
FV 3/4"
D
1601

G
NNF

2"-SW-1606-G40AX-ET

3"-SW-1604-G40AX-ET

3"-SW-1605-G40AX-ET
4"-SW-1303-G40AX-ET

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
131

132

195
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-20-0
H SHEET SIZE UNIT
P13

RECYCLE WATER

RECYCLE WATER
.
MINIMUM FLOW
P13

P12

P12
SOUR WATER

NAME
FROM V-102

Water circulation pump


P16
TO V-102

TO X-103

TO E-107
Piping and instrument diagram
DOCUMENT ID
130

S-09154 P42116 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 10:12:43
1 2 3 4 5 6 7 8 9 10 11 12

V-105 RECYCLE GAS K.O. DRUM X-105 EVACUATION EJECTOR NOTE

1) LOCATE V-105 CLOSE TO K-102A/B.

2) LOW POINT PROCESS DRAIN.


A
3) TO BE TRACED UP TO MAX. LIQUID LEVEL.

4) VACUUM PRESSURE GAUGE.

5) TO BE PROVIDED WITH WEEP HOLE DIA 1/2" AT LOW POINT.

H2 H2S
AI AI AH
1702 1701
AL AL

AT AT
1702 1701
B
FIC FT 8"-HR-1702-F24BX-ET
135 P18
1701 1701
RECYCLE GAS
TO K-102 A/B
FV
1701
4"-HR-1703-F24BX-ET

4"-HR-1704-F24BX-ET
3/4"

3/4"

FC

MINIMIZE
D D

8"-HR-1701-F24BX-ET
Down

C FSO
1702

AP
1701 PG
TYPE 4B
1705

SAFE LOCATION
B1 V1 V-105
1

A1

L5
L3

3/4"
L1 L7

START-UP LINE
D

6"-SM-1701-D24A-ET
M1

LZAH LZY LZT LZT LZT


1702 1702 1702 C 1702 B 1702 A
LG
2oo3
E 1701
M
5
IS LY
9 1702 4

IS
L2 L8 PG
MEDAIN

PG 10
L4 1704
1701
L6 F24BX D24A
F24BX B24A
AH
PI PT LIC X-105
3 U1
1702 1702 1702

3/4"
AL B2

MINIMIZE
D
F TI D
ON/OFF

1701 LV
1702 2
2"-PC-1701-F24BX-ET
3/4"
FC
3/4"

3/4"

D
NO LIQUID POCKETS
4"-OG-1701-F24BX-ET

D D

PG
FSO 1703
OSW
1703
NNF

G CBD

2"-SM-2302-D24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
8"-HR-1306-F24BX-ET
2"-PC-1702-F24BX-ET

and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-1701-B24A-H

3/4"
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
134

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-21-0
TO H2S REMOVAL UNIT

H SHEET SIZE UNIT


P13

P23
BL

.
RECYCLE GAS
P14
CONDENSATE
BL

NAME
PURGE GAS

FROM V-102

Recycle gas K.O. drum


P17
MP STEAM
LP STEAM
FROM BL

FROM BL
TO V-103

Piping and instrument diagram


DOCUMENT ID
133

209

S-09154 P42117 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 10:12:08
1 2 3 4 5 6 7 8 9 10 11 12

K-102 A/B RECYCLE GAS COMPRESSOR


NOTE

1) NON-SLAMMING TYPE CHECK VALVE.

DESIGN BY VENDOR/EPC CONTRACTOR 2) K-101 A AND K-102 A HAVE A COMMON MOTOR.


A
1250 psig 3) K-101 B AND K-102 B HAVE A COMMON MOTOR.
PSV V
1803

3/4"
Down
FL BL
LO

V
3/4"

Down
LO
AH AH
PDI PI
1801 1802

PDT PT
AH
B 1801 1802 TI
1802
8"-HR-1702-F24BX-ET K-102 A
135 P17 228 P19
LO LO LO LO
RECYCLE GAS RECYCLE GAS
FROM V-105 TO FV-1901
1
2

IS UZY ML
9 1801
M 1801

1250 psig
IS MZAL PSV V
9 1802 1806
C

3/4"
Down

LO

V
3/4"

Down
LO
AH AH
PDI PI
1804 1805

PDT PT
AH
1804 1805 TI
1801
K-102 B
D
LO LO LO LO

1
3

IS UZY ML
10 1802
M 1803

IS MZAL
10 1804

G
By EPC-CWR-1801-B24A-ET
By EPC-CWS-1801-B24A-ET
By EPC-SL-1801-B24A-H
By EPC-NI-1801-B24A-N

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-22-0
H SHEET SIZE UNIT
BL

BL

BL
COOLING WATER

COOLING WATER

.
BL

NAME
Recycle gas compressor
NITROGEN

P18
LP STEAM
FROM BL

FROM BL

FROM BL

Piping and instrument diagram


TO BL

DOCUMENT ID
S-09154 P42118 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:37:34
1 2 3 4 5 6 7 8 9 10 11 12

NOTE

1) TYPE OF NON-SLAMMING CHECK VALVE TO BE DIFFERENT FROM


NON-SLAMMING TYPE CHECK VALVE AT M.U. GAS COMPRESSOR
DISCHARGE IN ORDER TO MINIMIZE RISK OF FAILURE.
A

DESIGN BY VENDOR/EPC CONTRACTOR

B FV
1901

228 P18
FL/DO

3/4"
3/4"
RECYCLE GAS
FROM K-102 A/B
D D

6"-HR-1901-F24A-H
MINIMIZE

3/4"
MIN. 6 ft.

F24A B24A
D

D
MIN, 10 X PIPE ID

1
TYPE 7A
AP
1901

FIC IS FZAL
1901 4 1901 FZT
AL
1901 A
MEDIAN

2oo3
E FY FZY FZT
1901 1901 1901 B

FZT
1901 C

3"-HR-1906-F24A-H

FT
1902
START-UP LINE

FIC
F24A

1902 3/4"
D
FC

F24B

G D
FV 3/4"
1902

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
6"-HR-1903-F24A-ET
3"-HG-2101-F24A-H

3"-HR-1905-F24B-H

6"-HR-1902-F24A-H

4"-HR-1904-F24A-H

4"-NI-1901-B24A-N

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
SOAKING AND QUENCH GAS
139

136

138

141

229

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-23-0
TO R-101 / R-102 / R-103
MAKEUP HYDROGEN

H
TO E-102 / E-103 A/B

SHEET SIZE UNIT


P21

BL

.
FROM K-101 A/B

RECYCLE GAS
P12

P09

P12

P10

P12

NAME
TREAT GAS

TREAT GAS

TREAT GAS

RGC OH cooling
NITROGEN

P19
FROM BL
TO E-112

TO E-104

TO E-107

Piping and instrument diagram


DOCUMENT ID
145

S-09154 P42119 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:37:54
1 2 3 4 5 6 7 8 9 10 11 12

V-106 MAKEUP GAS K.O. DRUM E-113 MU COMPRESSOR KICK BACK COOLER NOTE

1) LOCATE V-106 CLOSE TO K-102 A/B.

DESIGN BY VENDOR/EPC CONTRACTOR

P21 143
E-113 SPILL BACK
FROM P-1306 A

P22 230
B
SPILL BACK
FROM P-1306 B

144 P21
MAKEUP HYDROGEN
TO K-101 A

B24A D24A
1

D V-106
3/4"

TYPE 4A
AP
2001

FT FI
E 2001 2001

TI
AH
2001 PT PI
2002 2002
AL

PG
2001
START-UP LINE

F
FL BL
6"-HG-2001-D24A-N

G
By EPC-SL-2001-B24A-H

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-HG-2002-D24A-N

D
3"-NI-2001-B24A-N

3/4"

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
142

149
HTRC MAKEUP HYDROGEN

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-24-0
PRESSURIZATION GAS

MAKEUP HYDROGEN
H SHEET SIZE UNIT
BL

BL

BL

.
P14

P22
NAME
Makeup gas K.O. drum

TO K-101 B
NITROGEN

P20
LP STEAM
FROM BL

FROM BL

FROM BL
TO V-103

Piping and instrument diagram


DOCUMENT ID
S-09154 P42120 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:38:16
1 2 3 4 5 6 7 8 9 10 11 12

K-101 A MAKEUP GAS COMPRESSOR E-116 MAKEUP COMPRESSOR 1st STAGE INTERCOOLER V-110 MAKEUP GAS COMPRESSOR K.O. DRUM 2nd STAGE NOTE

1) NON-SLAMMING TYPE CHECK VALVE.

2) K-101 A AND K-102 A HAVE A COMMON MOTOR.


A

1250 psig
DESIGN BY VENDOR/EPC CONTRACTOR
PSV V
2103

3/4"
Down
FL BL
LO

V
3/4"

Down
LO
AH AH
PDI PI
2104 2102
B
PDT PT
AH
2104 2102 TI
2102
K-101 A
144 P20
MAKEUP HYDROGEN
FROM V-106
1

E-116

231 P22
V-102 PRESSURE
PV-1306 B

IS
PIC PV 9
M 1306 B 1306 A UZV UZY
2101 S 2101

FO

FC
SELECTOR HS PIC
SWITCH 1306 1306 A UZLO
V-110 2101

UZC UZLC
E 2101 2101
AC

UZLO UZLC AC

UZY 2102 2102


2102

IS

S
10 UZC
UZV 2102
2102
FL BL
P22 147
FC MAKEUP HYDROGEN
F FROM K-101 B

PT PI
3"-HG-2201-F24A-H
2101 2101

TI
P20 143
2101
SPILL BACK
TO E-113
FT FI
2101 2101
AL

G
By EPC-CWR-2101-B24A-ET
By EPC-CWS-2101-B24A-ET
By EPC-SL-2101-B24A-H
By EPC-NI-2101-B24A-N

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

3"-HG-2101-F24A-H
1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

145
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-25-0

MAKEUP HYDROGEN
H SHEET SIZE UNIT
P13
BL

BL

BL

COOLING WATER

.
COOLING WATER

V-102 PRESSURE
FROM PIC-1306

P19

TO MIX POINT
BL

NAME
Makeup gas compressor I
NITROGEN

P21
LP STEAM
FROM BL

FROM BL

FROM BL

Piping and instrument diagram


TO BL

DOCUMENT ID
146

S-09154 P42121 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:38:38
1 2 3 4 5 6 7 8 9 10 11 12

K-101 B MAKEUP GAS COMPRESSOR E-117 MAKEUP COMPRESSOR 1st STAGE INTERCOOLER V-111 MAKEUP GAS COMPRESSOR K.O. DRUM 2nd STAGE NOTE

1) NON-SLAMMING TYPE CHECK VALVE.

2) K-101 B AND K-102 B HAVE A COMMON MOTOR.


A

3"-HG-2201-F24A-H
P21 147
MAKEUP HYDROGEN
TO MIXPOINT

DESIGN BY VENDOR/EPC CONTRACTOR


B

1250 psig
PSV V
2203

3/4"
Down
FL BL
LO
231 P21
3/4"
V-102 PRESSURE V
FROM PIC-1306 B

Down
LO
AH AH
PDI PI
2201 2202

C
PDT PT
AH
2201 2202 TI
K-101 B 2201

E-117

FO
PV
1306 B

V-111

FL BL

G
By EPC-CWR-2201-B24A-ET
By EPC-CWS-2201-B24A-ET
By EPC-SL-2201-B24A-H
By EPC-NI-2201-B24A-N

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

230
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-26-0
MAKEUP HYDROGEN

H SHEET SIZE UNIT


P20

BL

BL

BL
COOLING WATER

COOLING WATER

P20 .
BL

NAME
FROM V-106

SPILL BACK Makeup gas compressor II


NITROGEN

P22
LP STEAM
FROM BL

FROM BL

FROM BL

TO E-113 Piping and instrument diagram


TO BL

DOCUMENT ID
149

S-09154 P42122 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:39:00
1 2 3 4 5 6 7 8 9 10 11 12

C-101 PRODUCT STRIPPER NOTE


By EPC B24BX 125 psig 0-50 %
PSV 1) UTILITY CONNECTION FOR OPTIONAL ADDITION OF CORROSION
2309 A INHIBITOR. CONNECTION TO HAVE TOP ENTRY. CONNECTION
Down AH TO BE LOCATED 6 ft DOWNSTREAM HIGH POINT.
LO PIC 50-100%
A FL BL 5
2307 2) LOW POINT PROCESS DRAIN.
AL

3/4"
By EPC B24BX 125 psig 3/4"
D 3) TO BE PROVIDED WITH WEEP HOLE DIA 1/2" AT LOW POINT
PSV D PG PT DOWNSTREAM OF LAST BLOCK VALVE.

Down

LO

By EPC-HC-2303-B24BX-ET
2309 B 2308 2307
4 4) TEMPERATURE MEASUREMENT MUST BE LOCATED CLOSE TO

1"
NO LIQUID POCKETS STRIPPER OUTLET.
LO

3/4"
3/4"
D AH
5) SPLIT RANGE CONTROL FUNCTION OF PIC-2307.
D TIC

LC
1
2303
AL VALVE OPENING, %

100
B

SP
By EPC-HC-2304-B24BX-ET
C-101 A B
B1 FIC FT
V1
2303 2303

OUTPUT, %
FV TI 0 50 100
P1
2303 2302
2"-NAP-2301-B24BX-N 2"-NAP-2302-B24BX-N 6) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO
M1 A3 ENSURE SUFFICIENT NPSH FOR P-106 A/B.
MINIMIZE FO

3/4"
3/4"
AH 1 D24BX B24BX 7) CONNECTION TO HAVE TOP ENTRY.
PDI PDT D D
2301 2301 8) QUENCH NOZZLE.
C 2
AP
3 2301 PROCESS FLOW
TYPE 4B

PROCESS

2"-NAP-2303-B24BX-N
5 FLOW
6"-HC-2302-D24BX-H NO VAPOR POCKETS
A1 M2
P2
6

7
D
SAFE LOCATION

20
FT
M3 2302
AH 21
PDI PDT
AC
TIC 2302 2302 UZLO UZLC

3/4"
3/4"
AL 2301 30 UZY 2301 2301 FIC
MIN. 10 x PIPE ID

D
2301 2302
3
31
PG IN VIEW IS T COMP.

FC
S
E 2303 18 UZC
B24BX D24BX 32

SP
TG UZV 2301 3/4" FV
P3 D
3"-HC-2301-B24BX-ET 2301 2301 2302
7,8 G24B D24A
A4 A2 2"-SM-2303-D24A-H
MINIMIZE
FC
3/4"

3/4"
MINIMIZE
D 3/4"
D MINIMIZE FV I
D
2301 118
L1

FC
L3
3/4" IS
D L5
19 3/4" FIC
L7 D
2301
F
FC

AL

TV 3/4" LZT LZT LZT LZY LZAL


D M4
2301 2302 A 2302 B 2302 C 2302 2302 PI
2oo3
LG LZAH 2304 FT
2301 2302 2301
M
LY PT
L6
2302 2304 PG
START-UP LINE

L4
IS 2305
MEDIAN
L8 L2
18
D24A B24A
ELEVATION TI PG
U1 AH
LIC 2304 2306
G
2302
6 B2 AL

2"-SM-2301-D24A-H
D

2"-NAP-2304-B24BX-N
MINIMIZE

2"-SM-2302-D24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

3"-NAP-2604-B24BX-N
3"-HC-1403-B24BX-ET

3"-DSL-2405-D24A-H
6"-HC-1105-D24BX-H

6"-HC-2305-B24BX-P
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2
3"-HC-0507-G24B-H

3"-SL-2301-B24A-H

6"-DSL-2301-D24A-H 3/4"
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

V-107 HYDROCARBON LEVEL


221

168

209

160

153

158

154
Seaboard Energy, USA
STRIPPER FEED BYPASS

HDT renewable feedstock Client Doc. No.:32000-PID-27-0

C-101 OH PRESSURE

C-101 OH PRESSURE
H

STRIPPER REFLUX
SHEET SIZE UNIT
P14

P11

P24

P05

P26

P26
BL

BL
FROM E-105 A/B/C

DIESEL PRODUCT

OSW
.
STRIPPER FEED

FROM P-106 A/B

FROM P-101 A/B

FROM P-105 A/B


MINIMUM FLOW

TO PHIC-2307 B

TO PHIC-2307 A
WILD NAPHTHA

FROM LIC-2603
P24

P31

P17

P27

P25

P26

P26
START-UP OIL

STRIPPER OH
TO P-106 A/B

C-101 LEVEL

CBD NAME
FROM V-103

TO FIC-3101

Product stripper
P23
MP STEAM

MP STEAM
LP STEAM
FROM BL

FROM BL

TO C-102
TO X-105

TO E-108
Piping and instrument diagram
DOCUMENT ID
152

151

220

206

157

155
S-09154 P42123 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:39:25
1 2 3 4 5 6 7 8 9 10 11 12

P-106 A/B DIESEL PRODUCT PUMP NOTE

1) PUMP MINIMUM FLOW REQUIREMENT/ARRANGEMENT TO BE


REVIEWED DURING DETAILED DESIGN.

PG
PDI AH 2402
2406

PDT PG

3/4"
2406 2404 P-106 A

D
6"-DSL-2402-D24A-ET

4"-DSL-2404-D24A-ET
ML
2401
M

UZY
2402

IS
19
D
PG
PDI AH 2403
2405
4"-DSL-2403-D24A-ET

PDT PG

3/4"
2405 2407 P-106 B
D
6"-DSL-2401-D24A-ET PI PT
2401 2401

E ML
2403
M

UZY
2404

IS FO
19 1
2401

LO
F

3"-DSL-2405-D24A-H

4"-DSL-2406-D24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
6"-DSL-2301-D24A-H

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
220

216
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-28-0
H SHEET SIZE UNIT
P23
DIESEL PRODUCT

DIESEL PRODUCT
.
MINIMUM FLOW
P23

P27
NAME
FROM C-101

Diesel product pump


P24
TO C-101

TO E-109
Piping and instrument diagram
DOCUMENT ID
221

S-09154 P42124 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:39:45
1 2 3 4 5 6 7 8 9 10 11 12

E-108 PRODUCT STRIPPER OH AIR COOLER E-114 PRODUCT STRIPPER OH TRIM COOLER NOTE

1) NUMBER OF BUNDLES AND FANS TO BE VERIFIED BY VENDOR.

2) HIGH VIBRATION SWITCH FOR TRIP OF AIR COOLER FAN


TI TO BE FURNISHED BY VENDOR.
A 5
2505
NO LIQUID POCKETS 8"-HC-2501-B24BX-P 3) INSTRUMENTATION FOR EACH TUBE BUNDLE.

4) 50 % OF AIR COOLER FANS TO HAVE VARIABLE PITCH OR


MIN 10 x PIPE ID VARIABLE SPEED DRIVE FOR TEMPERATURE CONTROL.
HIC
2501 5) CONNECTION TO HAVE TOP ENTRY.

1 E-108
B

VSHH VAHH
2501 2501 TI
3
2504
2

M
C
NO LIQUID POCKETS

ML
2501

MIN 10 x PIPE ID
4
AH
TIC
2503
AL
80 psig

PSV PG
D 2503 2502

8"-HC-2502-B24CX-N
By EPC-CWR-2503-B24A-ET

MINIMIZE

E
E-114
B1 A2

TG
2502

A1 B2

PG
2501 AH
6"-CWR-2501-B24A-ET

TI
6"-CWS-2502-B24A-ET

2501
6"-HC-2503-B24CX-N
F 156 P26
STRIPPER OH
TO V-107
3/4"
3/4"

LO

LO

NNF
D D

G
6"-CWR-2502-B24A-ET

6"-CWS-2501-B24A-ET

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-HC-2305-B24BX-P

3"-HC-2701-B24BX-P

and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seaboard Energy, USA


Client Doc. No.:32000-PID-29-0
PRODUCT STRIPPER OH

HDT renewable feedstock


H SHEET SIZE UNIT
P23

P27

BL
COOLING WATER

COOLING WATER

.
BL

NAME
FROM C-101

FROM C-102

Product stripper OH cooling


OH VAPOR

P25
FROM BL

Piping and instrument diagram


TO BL

DOCUMENT ID
153

159

S-09154 P42125 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:40:05
1 2 3 4 5 6 7 8 9 10 11 12

P-104 A /B SOUR WATER PUMP V-107 PRODUCT STRIPPER REFLUX DRUM P-105 A /B PRODUCT STRIPPER REFLUX PUMP NOTE

FT FI 1) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO ENSURE


2601 2601 SUFFICIENT NPSH FOR P-104 A/B AND P-105 A/B.

A 2) CONNECTION TO HAVE TOP ENTRY.


TI
2 3) INTERFACE LEVEL.
2602
2
4) LOW POINT PROCESS DRAIN.
6"-HC-2503-B24CX-N
156 P25
5) PUMP MINIMUM FLOW REQUIREMENT/ARRANGEMENT TO BE

MINIMIZE
PT PI
STRIPPPER OH REVIEWED DURING DETAILED DESIGN.
FROM E-114 2604 2604 PG IN VIEW
2603 6) BOOT TO BE TRACED UP TO MAX. INTERFACE LEVEL.
B24CX V-107
A1 V1 B1
7) PUMP P-104 A/B TO BE ELECTRICAL TRACED.
LO

8) PUMP P-104 A/B SHALL BE PROVIDED WITH VARIABLE


B24BX

4"-OG-2601-B24BX-ET
SPEED DRIVE.
B 3/4"
L3 L1 D 9) LINE TO BE SIZED DURING DETAILED DESIGN.
5

B24BX
AH
FO LG LT LIC
M1

B24A
2602 2604 2603 2603

4"-OG-2602-B24BX-ET
M AL

B24A B24CX
L4 L2

U1
B2

ELEVATION PV 3/4"
D
D 2307 B
C

By EPC B24BX
1

FC
L5 L7
MINIMIZE
3/4"
3 4
3 D
3/4"
PHIC PV
AH D
LIC LT LG LG 2307 B 2307 A TYPE 4B
2602 2602 2602 2601
AP

FC
AL M M
2601
3/4"

50-100 %
L6 L8 D
PHIC
B3 H1 OSW
2307 A
6
CBD

Down
D 2"-NAP-2605-B24BX-N

0-50 %
2"-SW-2601-B24CX-ET

3"-NAP-2601-B24BX-H
195 psig
PSV
9 AH
2616 PDI PG
LO 4 2619 2605
3/4" AH
PDI FL BL
3/4"

D
2613 PDT PG
LO

D 2619 2608
9

3/4"
E 7, 8
PG PG PDT
2615 2611 2613 D PG
P-104 A OSW P-105 A 2602
9
CBD 3"-NAP-2602-B24BX-ET

PT PI
3/4"

3"-NAP-2607-B24BX-ET
195 psig 2"-SW-2606-B24CX-ET 2601 2601
M
D PSV
2617 ML TI
LO M 2601 2601
ML
3/4"
2"-SW-2603-B24CX-ET

2603
3/4"

D SELECTOR
AH
SWITCH PDI
LO

D HS SP SIC 2612 PG
F 9
2601 2602 2606
7, 8 AH
PG PG PDT PDI 3"-NAP-2606-B24BX-ET
2614 2610 2612 2609
2"-SW-2604-B24CX-ET P-104 B

3/4"
PDT PG
2609 2607 D
3/4"

2"-SW-2602-B24CX-ET

4"-OG-2603-B24BX-ET
START-UP LINE
D
SP SIC ML
P-105 B
2601
M 2602
3"-NAP-2603-B24BX-ET PI PT
G TYPE 4B
AP 2618 2618
2602
M

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-2605-B24CX-ET

ML 3"-NAP-2604-B24BX-N

3"-NG-3303-B24A-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-2601-B24A-H

2604 3/4"
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

FROM NATURAL GAS HEADER


C-102 HYDROCARBON LEVEL
176

155

157
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-30-0

PRESSURIZATION GAS

C-101 OH PRESSURE

C-101 OH PRESSURE
H
STRIPPER REFLUX

SHEET SIZE UNIT

P33

P23

P23
BL

OFF GAS TO H2S


TO C-101 / C-102

REMOVAL UNIT
FROM PIC-2307

FROM PIC-2307
P32

P23

P23
SOUR WATER

BL
NAME
TO FIC-2303

Product stripper reflux drum


P26
LP STEAM
FROM BL

TO V-104

Piping and instrument diagram


DOCUMENT ID
170

158

154
S-09154 P42126 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:40:30
1 2 3 4 5 6 7 8 9 10 11 12

E-109 NAPHTHA STABILIZER REBOILER C-102 NAPHTHA STABILIZER NOTE

1) LINE SIZE AND REBOILER ELEVATION TO BE CONFIRMED BY EPC


CONTRACTOR BASED ON LOOP HYDRAULICS AND THERMAL DESIGN
OF REBOILER.
NO LIQUID POCKETS
A
TI 2) TEMPERATURE MEASUREMENT MUST BE LOCATED CLOSE TO
2 2703 C-102 OUTLET.
B1 V1
3) LOW POINT PROCESS DRAIN.

4) CONTROL FUNCTION OF TIC-2702.


C-102

VALVE OPENING, %
A1
P1 100
1
V1 A B
6
B 7
AH
PDT PDI
2705 2705 OUTPUT, %
11 0 50 100
12
AH 5) TOP OF WEIR TO BE 32 inch BELOW DRAW OFF TRAY OF C-102.
TIC
T1 TO BE VERIFIED DURING DETAILED DESIGN.
2702 AL 13
I 6) CONNECTION TO HAVE TOP ENTRY.
121 4 PG
P2
M2
2704 7) QUENCH NOZZLE.
B3
PG
AH
TI 2703 TI LIC
163 P28 PROCESS FLOW
2705 2704 2702
C AL
AL C-102 LEVEL
TO FIC-2801

3"-HC-2703-B24A-H
A2 L5

MEDIAN
NO LIQUID POCKETS
L3
PG PROCESS
L7 L1 FLOW
2701 LY IS
2702 20
E-109
B2
LG LZT LZT LZT LZY LZAL
2701 2702 A 2702 B 2702 C 2702 2702
4"-DSL-2701-D24A-H

M 2oo3
A1 LZAH
5 1
2702
D

B1 A2 A3 ELEVATION
I
L8 L2
121
L4
PG 2"-NAP-2702-B24A-H
A3 L6
2702

U1 H1
2"-DSL-2703-D24A-H

THIC THIC

3"-HC-2702-B24A-H
2702 A 2702 B D
D
3/4" TI MINIMIZE
B2
E 2706
FO

TV
D 3
3/4" 2702 A TI
3 2"-NAP-2701-B24A-P
2707
164 P28
D STABILIZED NAPHTHA
3/4" TO E-110
FC

TV
D
2702 B 3/4"
F OSW

OSW
CBD

CBD

4"-DSL-2702-D24A-H
MIN. 10 x PIPE ID

6,7

TI
2701
G

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-2406-D24A-H
2"-NAP-2304-B24BX-N

2"-SL-2701-B24A-H
4"-DSL-2704-D24A-H
3"-HC-2701-B24BX-P

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
159

162

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-31-0
H SHEET SIZE UNIT
P23

P24

BL
DIESEL PRODUCT

DIESEL PRODUCT

.
FROM P-105 A/B

FROM P-106 A/B


WILD NAPHTHA
P25

P11

NAME
Naphtha stabilizer
P27
OH VAPOR

LP STEAM
FROM BL
TO E-108

TO E-106

Piping and instrument diagram


DOCUMENT ID
160

216

S-09154 P42127 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 12:09:35
1 2 3 4 5 6 7 8 9 10 11 12

E-110 NAPHTHA PRODUCT AIR COOLER NOTE

1) NUMBER OF BUNDLES AND FANS TO BE VERIFIED BY VENDOR.

2) INSTRUMENTATION FOR EACH TUBE BUNDLE.


A
3) HIGH VIBRATION SWITCH FOR TRIP OF AIR COOLER FAN TO BE
FURNISHED BY VENDOR.

2"-NAP-2701-B24A-P
164 P27
STABILIZED NAPHTHA
FROM C-102 TI
2804
B

1
E-110

3
PG
AH
VSHH VAHH TW TI 2803
2
2801 2801 2803 2802
2"-NAP-2801-B24A-N

C
MIN. 10 x PIPE ID
M

ML FT 3/4"
D
2801 2801

3/4"
D

SP
FIC
163 P27
2801 3/4"
C-102 LEVEL T COMP. D
FROM LIC-2702
AP

FC
TYPE 1B
I 2801
120 3/4"
FV
D
E 2801

TI
2801

PG
2802

IS
20 PT PI
UZY UZV 2801 2801
2801 S 2801

FC
UZLO
2801 NNF

AC
UZLC UZC
2801 2801

2"-NAP-2803-B24A-N
2"-NAP-2802-B24A-N

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
3/4" 3/4"
D D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-32-0
STABILIZED NAPHTHA

OFF. SPEC. NAPHTHA

H SHEET SIZE UNIT


.
BL

BL

NAME
Naphtha product cooling
Piping and instrument diagram
P28
TO BL

TO BL

DOCUMENT ID

S-09154 P42128 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:41:22
1 2 3 4 5 6 7 8 9 10 11 12

E-111 DIESEL PRODUCT AIR COOLER


NOTE

1) NUMBER OF BUNDLES AND FANS TO BE VERIFIED BY VENDOR.

2) INSTRUMENTATION FOR EACH TUBE BUNDLE.


A
3) HIGH VIBRATION SWITCH FOR TRIP OF AIR COOLER FAN TO BE
FURNISHED BY VENDOR.

PG
B 2902

HIC
2901

C
1
E-111

VSHH VAHH
2901 2901

TW
D M 2902
2
PG
AH
TI 2901
2901

ML 4"-DSL-2901-D24A-N
166 P30
2901
DIESEL PRODUCT
MIN. 10 x PIPE ID TO V-108

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-0204-D24A-P

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-33-0
H SHEET SIZE UNIT
P02
DIESEL PRODUCT

.
NAME
FROM E-101

Diesel product cooling


Piping and instrument diagram
P29
DOCUMENT ID
165

S-09154 P42129 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:41:42
1 2 3 4 5 6 7 8 9 10 11 12

V-108 DIESEL PRODUCT/ WATER SEPARATOR


NOTE
265 psig

PSV D24A By EPC 1) LOW POINT PROCESS DRAIN.


3002
LO Down 2) INTERFACE LEVEL.
A 3 FL BL
3) THE PSV SETTING DOES NOT TAKE INTO ACCOUNT THE LIQUID
3/4" 3/4"
HEIGHT. DURING DETAILED DESIGN THE SET PRESSURE MUST
D BE ADJUSTED.
D

LO
By EPC-DSL-3001-D24A-ET
4) BOOT TO BE TRACED UP TO HIGH INTERFACE LEVEL.

Down
D24A By EPC

TYPE 1A
PG AP
B 3001 3002

4"-DSL-2901-D24A-N 4"-DSL-3002-D24A-ET 4"-DSL-3003-D24A-N


166 P29 169 P31
START-UP LINE

3/4"
DIESEL PRODUCT DIESEL PRODUCT
FROM E-111 TO V-109 A/B
PDT D
3003

AH
PDI
3003

V-108 A1 S1 V1 B1
C

M1 M2
B24A D24A
D24A B24A

U1 U2

D
D D
MINIMIZE MINIMIZE

L1 L3

2
2
AH
LIC LT LG LG
3001 3001 3001 3002
AL M M

L4
L2 H1
E
B2

4
1

2"-SW-3001-D24A-ET

OSW

CBD
F

D
D24A

3/4"
AP
D40A

FC TYPE 1B
3001
3/4"
LV
D
3001

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-3002-D40A-ET

and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-3001-B24A-H

2"-SL-3002-B24A-H
1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
234

Seaboard Energy, USA


HDT renewable feedstock Client Doc. No.:32000-PID-34-0
H SHEET SIZE UNIT
BL

BL

.
P32
SOUR WATER

NAME
Diesel product/ water separator
P30
LP STEAM

LP STEAM
FROM BL

FROM BL

Piping and instrument diagram


TO BL

DOCUMENT ID

S-09154 P42130 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:42:05
1 2 3 4 5 6 7 8 9 10 11 12

V-109 A /B DIESEL PRODUCT DRIER


NOTE

1) INTERFACE LEVEL.

2) THE PSV SETTING DOES NOT TAKE INTO ACCOUNT THE LIQUID
A HEIGHT. DURING DETAILED DESIGN THE SET PRESSURE MUST
BE ADJUSTED AGAINST HEIGHT.

3) TO BE TRACED UP TO HIGH INTERFACE LEVEL.

4"-DSL-3106-D24A-H

4"-DSL-3107-D24A-H
B FT
D
265 psig 3101

PSV D24A By EPC


3104
Down
FL BL D
LO

3/4"
2 265 psig
D

Down
D24A By EPC

Down
D PSV
3/4"
3105

LO
D24A By EPC
AH
PDT PDI 2 LO

3/4"
3101 3101

Down
C I FIC
D D
By EPC-DSL-3105-D24A-ET D 119 3101 3/4"
3/4" T COMP
D24A By EPC
PG PG SP AP

FC
LO
TYPE 1B
3103 3102 3101

FV
D
3101 3/4"
By EPC-DSL-3104-D24A-ET
V-109 A V-109 B
B1 B1
M1 V1 M1 V1
P1 S1 P1 S1

TI
3101
D
PG
3107

PI PT
3106 3106

MINIMIZE
H1 H1

E
L1 L3 L3
3/4"
1 M2 1 L1 M2 D
LG LG
AH 3103 AH 3101
LI LT LG 1 LI LT LG 1
M M
3104 3104 3104 M 3102 3102 3102
M
A1 A1
B24A D24A B24A D24A
L2 L4 L2 L4

U1 U1

D1 D1
D D
3
3
F MINIMIZE MINIMIZE

IN VIEW IN VIEW

NNF
4"-DSL-3101-D24A-ET
3"-SL-3101-B24A-H

3"-SL-3102-B24A-H

4"-DSL-3109-D24A-H

4"-DSL-3110-D24A-H
OSW OSW

INTERMITTANT LINE
CBD CBD

4"-DSL-3102-D24A-ET
G

3"-DSL-3108-D24A-ET
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
D D
4"-DSL-3003-D24A-N START-UP LINE 4"-DSL-3103-D24A-ET
3/4" 3/4"
169 P30
3/4"

DIESEL PRODUCT
FROM V-108
D 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

167
DIESEL PRODUCT RECYCLE
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-35-0
H SHEET SIZE UNIT

P23

OFF-SPEC DIESEL
BL

DIESEL PRODUCT
.

FROM LIC-2302

TO FEED E-101
P01

BL

BL
C-101 LEVEL
NAME
Diesel product dryer
P31
LP STEAM
FROM BL

Piping and instrument diagram

TO BL

TO BL
DOCUMENT ID
168

S-09154 P42131 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 12:11:04
1 2 3 4 5 6 7 8 9 10 11 12

V-104 SOUR WATER FLASH DRUM


NOTE

1) LOW POINT PROCESS DRAIN.

2) NOZZLE FOR OIL SKIMMING.


A
3) TO BE TRACED UP TO HIGH LIQUID LEVEL.

4) SET POINT FOR CONTROLLERS TO BE DIFFERENT.

PV
180 psig 3204 B

PSV
3202 A

3/4"
FC

3/4"
Down LO
FL BL

2"-OG-3204-B24BX-ET
D D

3/4"
3/4" 4 4
D
By EPC B24BX 180 psig D

Down

LO
AH
B PSV PIC PIC
3202 B By EPC B24BX 3204 B 3204 A
AL
LO PV

B24BX By EPC
PV PV

3/4"
3/4" 3204 A
D 2"-OG-3205-B24BX-ET
D
FO

3/4"

3/4"
LC
PT PY D D
3204 3204
By EPC-OG-3203-B24BX-ET

By EPC-OG-3202-B24BX-ET
PG
3203 B24BX B24A
C

B1
V1
V-104
S1

A2

A1

D
MINIMIZE

L3 L1

2
2"-HC-3201-D40AX-ET
D1
AH
LG LT LIC
3202 3201 3201
M AL
INTERMITTANT LINE

SP
M1
B24A D40AX FIC
L4 L2
E 3201

U1
FT
IN VIEW

3201
B2
D
MINIMIZE 3 FV
3201
2"-SW-3201-D40AX-ET

FC

3/4"

3/4"
D

D
1
F
OSW
AP
CBD 3201
TYPE 4B PG
OSW
3201
CBD

2"-SW-3202-D40AX-ET
G
2"-SW-1302-G40AX-ET

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-1402-B24CX-ET

2"-SW-2605-B24CX-ET

2"-OG-3201-B24BX-ET
2"-SW-3002-D40A-ET

2"-NG-3304-B24A-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-3201-B24A-H

3/4"
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

TO H2S REMOVAL UNIT AT BL


177
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-36-0
H SHEET SIZE UNIT
P14

P26

P13

P30

P33
BL

.
FROM P-104 A/B

NATURAL GAS

P14
SOUR WATER

SOUR WATER

SOUR WATER

SOUR WATER

SOUR WATER
BL
NAME
FROM V-103

FROM V-102

FROM V-108
Sour water flash drum
P32
LP STEAM
FROM BL

FROM BL

OFF GAS
Piping and instrument diagram

TO BL
DOCUMENT ID
202

176

175

234

232
S-09154 P42132 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:42:55
1 2 3 4 5 6 7 8 9 10 11 12

DESIGN BY VENDOR/EPC CONTRACTOR NOTE


I
106 1) TYPICAL ARRANGEMENT FOR ONE BURNER.

2) BURNER MANAGEMENT SYSTEM SHALL BE INCLUDED.


A AH
SP PIC 3) CONNECTION AT TOP OF PIPE.
3308
AL 4) SWEEP GAS FOR FLARE HEADER.
COMMON

MEDIAN
LOCAL
RESET
HS IS (REFER TO P06 FOR HEATER)
SAFE LOCATION
3301 6 IS PY IS BURNER MANAGEMENT SYSTEM
6 3308 6 ONE BURNER BLOCK

PILOT BURNER
UZV

MAIN BURNER
UZY
3302 S 3302
AC 2oo3 2
IS UZLO UZLC PZY PZAL

FO
S
B 6 3305 3305 3308 3308

UZY 3/4" UZO UZLO


D
3305 3302 3302
AO
UZC PZT PZT PZT IS IS
PV UZV 3305 UZLC 3308 A 3308 B 3308 C 5 7
3308 3305 3302 UZY UZV UZY
UZV
3303 S 3303 3304 S 3304

3/4"
FC FC
3/4"

1 1

FC
FC
D D UZLO UZLO
3303 3304

C IN VIEW PG
AC AC
3309 UZC UZLC UZC UZLC
3303 3303 3304 3304

COMMON
LOCAL SAFE LOCATION
RESET IS
FI HS IS 8
3302 P, T 3302 8 UZV UZY
COMP. 3/4" 3/4" 3306 S 3306
D D AC
UZY UZLO UZLC
D

FO
AH
PDT PDI 3301 3301 3301
AO
3307 3307 IS UZO UZLO
S
8 3306 3306

PG UZC
PCV 3304 UZV 3301 UZLC
3306 3301 3306

FC

PG PZT PZT PZT


3305 3303 A 3303 B 3303 C
E

3 AH
PI MEDIAN PZY PZAL IS
3303 3303 3303 8
3 AL 2oo3

4
3
AP
3301

TYPE 4A
FL BL PG
F
PI PT 3302
3301 3301
START-UP LINE

AL
TI
3301

FT FI
3301 3301
3"-NG-3301-B24A-ET
3/4"

MINIMIZE

D
G
2"-NG-3302-B24A-ET

2"-NG-3304-B24A-ET

3/4"
2"-NI-3301-B24A-N
3"-NG-3303-B24A-ET

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
D

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
170

174

232

R-101 INLET TEMPERATURE


Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-37-0
PRESSURIZATION GAS

H SHEET SIZE UNIT

P07
BL

BL

.
NATURAL GAS
NATURAL GAS

NATURAL GAS
P26

P04

P32

FROM TIC-115
NAME
Heater, natural gas section
NITROGEN

P33
TO V-104
FROM BL

FROM BL
TO V-107

TO V-101

Piping and instrument diagram


DOCUMENT ID

173
S-09154 P42133 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:43:19
1 2 3 4 5 6 7 8 9 10 11 12

NOTE

1) TRIP GROUP AUTOMATICALLY RESET WHEN IS-GROUP IS RESET.

2) CONTROLLER TO MANUAL WITH 0 % OUTPUT.


A
3) INACTIVATION USED DURING START-UP FOR CATALYST
DRYING.
EMERGENCY
IS- 3) RESET PERMISSIVE ONLY IF PIC-1301 IS LESS THAN 30 PSIG.
T01

DEPRESSURIZATION OF BLOCK FEED


4 HP LOOP IS-

T01
3 TO HP LOOP
MT 3
LZAL- LOW LEVEL IN
P04

2oo3 FEED SURGE DRUM, IN D UZY- STOP FEED PUMP MOTOR,


0402 V-101 5 sec
IS-1

P05
FOR P-101 A
502
MZAL FEED PUMP,
P05

P-101 A TRIP OF UZY- STOP FEED PUMP MOTOR,


0502 NOT RUNNING

P05
FEED TO FOR P-101 B
AND 503
B MZAL- FEED PUMP, REACTOR SECTION
P05

P-101 B P-101 A/B REQUIREMENTS


0504 NOT RUNNING DETAILED BY VENDOR/EPC
R
P-101 A/B REQUIREMENTS
DETAILED BY VENDOR/EPC

MT

UZY- CLOSE SHUT-OFF VALVE CLOSE


IS-2

P01
RE FOR RENEWABLE FEED UZV
LZAH- HIGH LEVEL IN 0101 FROM BL 0101
I-102
P04

2oo3 FEED SURGE DRUM, D


0402 V-101 5 sec TRIP OF FZY- CLOSE CONTROL VALVE CLOSE

P01
FEED FOR RENEWABLE FEED FV 2
STOP 0101 0101
FROM BL
FEED TO
D FROM BL
R

1
EXECUTION OF IS-/I-GROUPS:
TRIP OF FEED TO MT STOP AMINE
IS- IS- SAFETY INTERLOCK LOGIC EXECUTED IN

P04
T01

REACTOR SECTION INJECTION BY EPC AN INDEPENDENT FAIL SAFE PLC.


1
IS- BLOCK RECYCLE OIL IS-3 UZY- BLOCK FEED CLOSE FIC- CLOSE FEED TO CLOSE
I- INTERLOCK EXECUTED IN A REDUNDANT
CONFIGURATED DCS/PLC.

P05

P07
RE
T04

TO HP LOOP TO HP LOOP UZV- HDO REACTOR 1, BED1 FV- 2


16 BLOCK FEED 0501 0501 0703 CONTROL VALVE 0703

FZAL- LOW FEED


TO HP LOOP I-103 FIC- CLOSE FEED TO CLOSE
LEGEND:
E
P05

P07
FLOW TO HP LOOP HDO REACTOR 1, BED2 FV- 2 D ACTION DELAYED X TIME.
0504 STOP 0702 CONTROL VALVE 0702 X sec/min
R FEED TO IN ACTION MAY BE INACTIVATED .
FIC- CLOSE FEED TO CLOSE
HP LOOP

P07
HDO REACTOR 2, BED1 FV- 2
TRIP OF COMPRESSORS, 0701 CONTROL VALVE 0701 MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.
IS- MT
MANUAL ACTIVATION OF I-UNIT FROM DCS.
T03

K-101 A AND K-102 A


9 TRIP OF FEED TO
IS- 1

T01
AND REACTOR SECTION R MANUAL RESET OF IS-/I-UNIT FROM DCS.
IS- TRIP OF COMPRESSORS, 1
T03

K-101 B AND K-102 B FINAL ELEMENT TO BE RESET FROM DCS


10 TOTAL PILOT
IS-
RE
AFTER RESET OF IS-/I-UNIT.

T03
BURNER TRIP, H-101
TZAH- HIGH TEMPERATURE IN 8 RL FINAL ELEMENT TO BE RESET LOCALLY
P10

1oo12 ISOM REACTOR (BED 1), AFTER RESET OF IS-/I-UNIT.


F 1003 R-103 TRIP OF COMPRESSORS,
IS- PULSE SIGNAL TO ALLOW OPERATOR ACTION

T03
K-101 A AND K-102 A
TZAH- HIGH TEMPERATURE IN MT 9 BEFORE RESET OF IS-/I-UNIT.
P10

1oo12 ISOM REACTOR (BED 2),


1006 R-103 TRIP OF COMPRESSORS, NEGATION OF INPUT.
IS-
TZAH- HIGH SKIN TEMPERATURE IN IS-4 K-101 B AND K-102 B
10
T03
P10

1oo8 ISOM REACTOR (BED 1), AND AND GATE. OR GATE.


1004 R-103 EMERGENCY TRIP OF WATER
IS-
T04

DEPRESSURIZATION FROM HIGH PRESSURE COLD


TZAH- HIGH SKIN TEMPERATURE IN SEPARATOR, V-102 13
OF HP LOOP
P10

1oo8 ISOM REACTOR (BED 2), MooN M OUT OF N VOTING.


1008 R-103 TRIP OF HP BFW
IS-
T04

FROM BL
TZAH- HIGH SKIN TEMPERATURE IN 14
P10

G 1oo4 ISOM REACTOR (OUTLET),


1009 R-103 TRIP OF RECYCLE OIL
IS-
T04

HZS- FIELD PUSH BUTTON 15


P13

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
1301 UZY- OPENING OF EMERGENCY OPEN and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
P13

DEPRESSURIZATION VALVE UZV-


FZAL- LOW TREAT GAS 1303 1303
P19

2oo3 FLOW TO REACTORS


1901
1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
PIC- PIC-1301 0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
P13

INDICATION < 30 psig REV. DESCRIPTION DATE DRAWN CHECK APPR.


1301 Seabord Energy, USA
AND HDT renewable feedstock Client Doc. No.: 32000-PID-38-0
H
SHEET SIZE UNIT
4 R

Interlock system NAME


Interlock diagram
T01
DOCUMENT ID

S-09154 P42301 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

NOTE

1) INACTIVATION USED DUING START-UP FOR CATALYST DRYING.

2) ONE INTERLOCK GROUP FOR EACH BURNER.


A
MT 3) ACTIVE IF MORE THAN X% OF BURNERS ARE OUT, TO BE
SPECIFIED BY VENDOR.
TOTAL MAIN BURNER TRIP, TOTAL MAIN BURNER TRIP,
IS- IS- 4) TRIP GROUP AUTOMATICALLY RESET WHEN IS-GROUP IS RESET.
IS-5A
T02

T02
AT MULTIPLE MAIN
6 BURNER FAILURE 6
5) CONTROLLER TO MANUAL WITH 0 % OUTPUT.
BZAL- FAILURE OF MAIN BURNER A, TRIP OF UZY- BLOCK NATURAL GAS CLOSE
P06

RL

P33
H-101 MAIN BURNER A TO MAIN BURNER A, H-101 UZV-
0602 3303 3303
H-101

R
2

TRIP OF
IS-
T02

MAIN BURNER A,
5A H-101
3
TRIP OF
C
IS- MAIN BURNER B, TRIP OF
5B H-101 IS-

T02
MAIN BURNER A,
AND H-101 5A
TRIP OF
MAIN BURNER B,
IS-
H-101 5B
TRIP OF
IS- MAIN BURNER "n",
5n H-101
1
FZAL- LOW RECYCLE OIL FLOW MT
P15

2oo3 TO HP LOOP IN TRIP OF


1501 MAIN BURNER "n",
IS-
D HZS- HEATER EMERGENCY IS-6 H-101 5n
P06

SHUT DOWN HS
0601 TOTAL MAIN BURNER TRIP 3301
UZY- BLOCK OF NATURAL GAS, CLOSE
H-101

P33
PZAH- HIGH PRESSURE IN HEATER TO H-101 UZV-
3305 3305
P06

2oo3 BOX, H-101 D EXECUTION OF IS-/I-GROUPS:


RL
0606 10 sec
UZY- BLEED OF NATURAL GAS, OPEN IS- SAFETY INTERLOCK LOGIC EXECUTED IN

P33
TZAH- HIGH PROCESS TEMPERATURE R TO H-101 UZV- AN INDEPENDENT FAIL SAFE PLC.
3302 3302
P06

OUTLET,
0608 H-101 I- INTERLOCK EXECUTED IN A REDUNDANT
H-101 REQUIREMENTS CONFIGURATED DCS/PLC.
TZAH- HIGH STACK TEMPERATURE, DETAILED BY VENDOR/EPC
P06

2oo3 H-101
0606 I-106 PIC- CLOSE NATURAL GAS CLOSE
LEGEND:
E

P33
TO MAIN BURNER PV- 5 D ACTION DELAYED X TIME.
PZAL- LOW NATURAL GAS
STOP NATURAL GAS 3308 CONTROL VALVE 3308 X sec/min
P33

2oo3 PRESSURE, IN
3308 TO MAIN BURNER, IN ACTION MAY BE INACTIVATED .
H-101
H-101 REQUIREMENTS
MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.
DETAILED BY VENDOR/EPC MT
MANUAL ACTIVATION OF I-UNIT FROM DCS.
4
R MANUAL RESET OF IS-/I-UNIT FROM DCS.

RE FINAL ELEMENT TO BE RESET FROM DCS


AFTER RESET OF IS-/I-UNIT.

RL FINAL ELEMENT TO BE RESET LOCALLY


AFTER RESET OF IS-/I-UNIT.
F
PULSE SIGNAL TO ALLOW OPERATOR ACTION
BEFORE RESET OF IS-/I-UNIT.

NEGATION OF INPUT.

AND AND GATE. OR GATE.

MT
MooN M OUT OF N VOTING.
TOTAL PILOT BURNER TRIP, TOTAL PILOT BURNER TRIP
IS- IS-
IS-7A
T03

T03

H-101 H-101, AT MULTIPLE


G
8 PILOT BURNER FAILURE 8
BZAL- FAILURE OF TRIP OF UZY- BLOCK PILOT GAS CLOSE
RL
P06

P33

PILOT BURNER A, PILOT BURNER A, TO PILOT BURNER A, UZV-


0601 H-101 3304 H-101 3304
H-101 Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

R
2

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seabord Energy, USA


HDT renewable feedstock Client Doc. No.: 32000-PID-39-0
H
SHEET SIZE UNIT

Interlock system NAME


Interlock diagram
T02
DOCUMENT ID

S-09154 P42302 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

NOTE

1) ACTIVE IF MORE THAN X % OF BURNERS ARE OUT.


TO BE SPECIFIED BY VENDOR.

A EMERGENCY
IS-
T01
DEPRESSURIZATION
4 OF HP LOOP

TRIP OF TRIP OF
IS- IS-
T02

T02
PILOT BURNER A, H-101 PILOT BURNER A, H-101
7A 7A
1
TRIP OF TRIP OF
IS- PILOT BURNER B, H-101 PILOT BURNER B, H-101
IS-
7B 7B
AND
MT

B
IS- TRIP OF IS-8 TRIP OF
IS-
PILOT BURNER "n", H-101 PILOT BURNER "n", H-101
7n TOTAL HS
7n
PILOT BURNER TRIP, 3302
HZS- HEATER EMERGENCY UZY- BLOCK OF PILOT GAS, CLOSE
H-101
P06

P33
SHUT DOWN H-101 UZV-
0601 3301 3301
RL
PZAL- LOW PILOT GAS PRESSURE, R UZY- BLEED OF PILOT GAS, OPEN
P33

P33
2oo3 H-101 IN H-101 UZV-
3303 3306 3306

H-101 REQUIREMENTS H-101 REQUIREMENTS


DETAILED BY VENDOR/EPC DETAILED BY VENDOR/EPC
C

EMERGENCY
IS-
T01

DEPRESSURIZATION
4 OF HP LOOP

LZAH- HIGH HYDROCARBON LEVEL EMERGENCY


IS-
P13

T01
2oo3 IN HIGH PRESSURE COLD D DEPRESSURIZATION OF
1301 SEPARATOR,V-102 5 sec MT HP LOOP 4
D
LZAH- HIGH LEVEL IN RECYCLE GAS UZY- STOP MOTOR FOR
IS-9
P17

P18
2oo3 K.O. DRUM, COMPRESSORS,
1702 V-105 1801 K-101 A / K-102 A

MZAL- RECYCLE GAS COMPRESSOR, TRIP OF UZY- SHUT-OFF MAKEUP CLOSE EXECUTION OF IS-/I-GROUPS:
P18

P21
K-102 A AND MUG COMP., COMPRESSORS, HYDROGEN FROM K-101 A UZV-
1802 K-101 A NOT RUNNING 2101 TO HP SECTION 2101 IS- SAFETY INTERLOCK LOGIC EXECUTED IN
K-101 A AND K-102 A AN INDEPENDENT FAIL SAFE PLC.
HIGH LEVEL IN MAKE-UP GAS K-101 A / K-102 A
P20

K.O. DRUM, REQUIREMENTS I- INTERLOCK EXECUTED IN A REDUNDANT


V-106 R DETAILED BY VENDOR/EPC CONFIGURATED DCS/PLC.

K-101 A / K-102 A
LEGEND:
REQUIREMENTS
E DETAILED BY VENDOR/EPC
D ACTION DELAYED X TIME.
X sec/min
IN ACTION MAY BE INACTIVATED .

MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.


MT
MANUAL ACTIVATION OF I-UNIT FROM DCS.

R MANUAL RESET OF IS-/I-UNIT FROM DCS.

RE FINAL ELEMENT TO BE RESET FROM DCS


EMERGENCY AFTER RESET OF IS-/I-UNIT.
IS-
T01

DEPRESSURIZATION FINAL ELEMENT TO BE RESET LOCALLY


4 OF HP LOOP RL
AFTER RESET OF IS-/I-UNIT.
F
LZAH- HIGH HYDROCARBON LEVEL EMERGENCY PULSE SIGNAL TO ALLOW OPERATOR ACTION
IS-
P13

T01
2oo3 IN HIGH PRESSURE COLD D DEPRESSURIZATION OF BEFORE RESET OF IS-/I-UNIT.
1301 SEPARATOR,V-102 5 sec MT HP LOOP 4
NEGATION OF INPUT.
LZAH- HIGH LEVEL IN RECYCLE GAS UZY- STOP MOTOR FOR
IS-10
P17

2oo3 K.O. DRUM, COMPRESSORS, P18


1702 V-105 1802 K-101 B / K-102 B
AND AND GATE. OR GATE.
MZAL- RECYCLE GAS COMPRESSOR, TRIP OF UZY- SHUT-OFF MAKEUP CLOSE
P18

P21

K-102 B AND MUG COMP., COMPRESSORS, HYDROGEN FROM K-101 B UZV-


1804 K-101 B NOT RUNNING 2102 TO HP SECTION 2102
K-101 B AND K-102 B MooN M OUT OF N VOTING.
HIGH LEVEL IN MAKE-UP GAS K-101 B / K-102 B
P20

K.O. DRUM, REQUIREMENTS


V-106 R DETAILED BY VENDOR/EPC
G
K-101 A / K-102 A
REQUIREMENTS
DETAILED BY VENDOR/EPC
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seabord Energy, USA


HDT renewable feedstock Client Doc. No.: 32000-PID-40-0
H
SHEET SIZE UNIT

Interlock system NAME


Interlock diagram
T03
DOCUMENT ID

S-09154 P42303 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

NOTE
MT

1) TRIP GROUP AUTOMATICALLY RESET WHEN IS-GROUP IS RESET.


UZY- CLOSE SHUT-OFF VALVE CLOSE
IS-12

P13
RE DOWNSTREAM HIGH PRESS. UZV-
LZAL- LOW HYDROCARBON LEVEL 1301 COLD SEPARATOR, V-102 1301 2) CONTROLLER TO MANUAL WITH 0% OUTPUT.

I-112
P13
A 2oo3 IN HP COLD SEPARATOR, D
1301 V-102 5 sec TRIP OF HYDROCARBON LIC- CLOSE HIGH PRESSURE COLD CLOSE 3) INACTIVATION USED DURING START-UP FOR FLUSHING OF
CATALYST.

P13
LIQUID FROM HIGH PRESS. SEPARATOR HC CONTROL LV- 2
STOP HC FLOW FROM 1301 VALVE 1301A/B
COLD SEPARATOR, V-102
HIGH PRESSURE
COLD SEPARATOR, V-102
R

B UZY- CLOSE SHUT-OFF VALVE CLOSE


RE

P13
DOWNSTREAM HIGH PRESS. UZV-
MT 1302 COLD SEPARATOR, V-102 1302

EMERGENCY UZY- STOP WATER CIRCULATION


IS-
IS-13

P16
T01

DEPRESSURIZATION MOTOR, P-103 A


4 OF HP LOOP 1602

LZAL- LOW WATER LEVEL IN HIGH TRIP OF WATER FROM UZY- STOP WATER CIRCULATION
P13

P16
2oo3 PRESSURE COLD SEPARATOR, D HIGH PRESSURE COLD MOTOR, P-103 B LIC- CLOSE HIGH PRESSURE CLOSE
1303 V-102 5 sec 1604

P13
SEPARATOR, V-102 COLD SEPARATOR WATER LV- 2
I-113 1303 CONTROL VALVE 1303

R STOP WATER FLOW FROM FIC- CLOSE RECYCLE WATER CLOSE

P16
C HIGH PRESSURE CONTROL VALVE FV- 2
1601 1601
COLD SEPARATOR, V-102

MT 1

EMERGENCY
IS-
IS-14
T01

DEPRESSURIZATION
4 OF HP LOOP UZY- CLOSE SHUT-OFF VALVE CLOSE

P13
RE FOR HP BFW FROM BL UZV-
PZAL LOW HP BFW PRESSURE TRIP OF 1304 1304
P13

HP BFW
1305
FROM BL
D

R
EMERGENCY
IS-
T01

DEPRESSURIZATION
4 OF HP LOOP
EXECUTION OF IS-/I-GROUPS:

TRIP OF HYDROCARBON BLOCK RECYCLE OIL IS- SAFETY INTERLOCK LOGIC EXECUTED IN
IS- IS- AN INDEPENDENT FAIL SAFE PLC.
T04

T04
LIQUID FROM LOW PRESSURE TO HP LOOP
17 FLASH DRUM, V-103 MT 16
I- INTERLOCK EXECUTED IN A REDUNDANT
HZZAL VALVE UPSTREAM UZY- STOP RECYCLE PUMP MOTOR, CONFIGURATED DCS/PLC.

IS-15
P14

P15
2oo3 RECYCLE PUMP, P-102 A/B P-102 A
1401 CLOSING 1502 LEGEND:
E MZAL- RECYCLE PUMP, TRIP OF UZY- STOP RECYCLE PUMP MOTOR, D ACTION DELAYED X TIME.
P15

P15
P-102 A RECYCLE OIL P-102 B X sec/min
1502 NOT RUNNING 1503
AND IN ACTION MAY BE INACTIVATED .
MZAL- RECYCLE PUMP, P-102 A/B REQUIREMENTS
P15

P-102 B DETAILED BY VENDOR/EPC MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.


1504 NOT RUNNING R MT
MANUAL ACTIVATION OF I-UNIT FROM DCS.
P-102 A/B REQUIREMENTS R MANUAL RESET OF IS-/I-UNIT FROM DCS.
DETAILED BY VENDOR/EPC

RE FINAL ELEMENT TO BE RESET FROM DCS


AFTER RESET OF IS-/I-UNIT.

RL FINAL ELEMENT TO BE RESET LOCALLY


MT BLOCK FEED TO
3 IS- AFTER RESET OF IS-/I-UNIT.

T01
F HP LOOP
IS- TRIP OF RECYCLE OIL 3 PULSE SIGNAL TO ALLOW OPERATOR ACTION

IS-16 BEFORE RESET OF IS-/I-UNIT.


T04

IN
15 UZY- CLOSE SHUT-OFF VALVE CLOSE

P15
RE DOWNSTREAM RECYCLE UZV- NEGATION OF INPUT.
FZAL- LOW RECYCLE OIL FLOW BLOCK RECYCLE OIL 1501 PUMP, P-102 A/B 1501 FIC- CLOSE CONTROL VALVE CLOSE
I-116
P15

P15
2oo3 TO HP LOOP TO HP LOOP DOWNSTREAM RECYCLE PUMP FV- 2
1501 1501 P-102 A/B 1501 AND AND GATE. OR GATE.
STOP LIQUID FROM HIC- CLOSE RECYCLE OIL CONTROL CLOSE

P09
RECYCLE PUMPS, VALVE UPSTREAM HV- 2
R 0901 H-101 0901
P-102 A/B MooN M OUT OF N VOTING.

G 1

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
MT

TRIP OF RECYCLE OIL


IS-
IS-17
T04

LZAL- LOW HYDROCARBON LEVEL 15 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN

I-117
P14

2oo3 IN LOW PRESSURE FLASH D 0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
1403 DRUM, V-103 5 sec TRIP OF HYDROCARBON FIC- CLOSE STRIPPER FEED CLOSE REV. DESCRIPTION DATE DRAWN CHECK APPR.

P14
LIQUID FROM LOW PESSURE CONTROL VALVE FV- 2
Seabord Energy, USA
STOP HYDROCARBON 1401 1401 HDT renewable feedstock Client Doc. No.: 32000-PID-41-0
FLASH DRUM, V-103
H FLOW FROM LOW PRESS
SHEET SIZE UNIT
FLASH DRUM, V-103
R NAME
Interlock system
Interlock diagram
T04
DOCUMENT ID
1
S-09154 P42304 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

NOTE

1) TRIP GROUP AUTOMATICALLY RESET WHEN IS-GROUP IS RESET.

2) CONTROLLER TO MANUAL WITH 0 % OUTPUT.


A
3) CONTROLLER TO MANUAL WITH 100 % OUTPUT.
MT

UZY- CLOSE SHUT-OFF VALVE CLOSE-


IS-18

P23
RE FOR STEAM UZV-
LZAH- HIGH LEVEL IN PRODUCT 2301 2301
I-118
P23

2oo3 STRIPPER,C-101 D
2302 5 sec TRIP OF FIC- CLOSE CONTROL VALVE CLOSE-

P23
STEAM TO PRODUCT FOR STEAM FV- 2
STOP STEAM TO 2301 2301
STRIPPER, C-101
PRODUCT STRIPPER

R
B
1

UZY- STOP DIESEL PRODUCT

P24
PUMP MOTOR, FOR P-106 A
MT 2402

UZY- STOP DIESEL PRODUCT


IS-19

P24
C PUMP MOTOR, FOR P-106 B
LZAL- LOW LEVEL IN PRODUCT 2404
P23

2oo3 STRIPPER,C-101 D
2302 5 sec TRIP OF P-106 A/B REQUIREMENTS
LIQUID FROM DETAILED BY VENDOR/EPC
PRODUCT STRIPPER, C-101
I-119 FIC- CLOSE DIESEL PRODUCT CLOSE

P31
CONTROL VALVE TO BL FV- 2
R STOP LIQUID FROM 3101 3101
PRODUCT STRIPPER, C-101

D 1

EXECUTION OF IS-/I-GROUPS:

IS- SAFETY INTERLOCK LOGIC EXECUTED IN


AN INDEPENDENT FAIL SAFE PLC.
MT I- INTERLOCK EXECUTED IN A REDUNDANT
CONFIGURATED DCS/PLC.
UZY- CLOSE SHUT-OFF VALVE CLOSE
IS-20

P28
RE AT BL UZV-
LZAL- LOW LEVEL IN 2801 2801 LEGEND:

I-120
P27

E
2oo3 NAPHTHA STABILIZER, D
2702 C-102 5 sec TRIP OF FIC- CLOSE STABILIZED NAPHTHA CLOSE D ACTION DELAYED X TIME.
X sec/min

P28
LIQUID FROM PRODUCT PRODUCT CONTROL VALVE FV- 2
STOP STABILIZER NAPHTHA 2801 2801 IN ACTION MAY BE INACTIVATED .
NAPHTHA STABILIZER, C-102
PRODUCT TO BL
MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.
MT
R MANUAL ACTIVATION OF I-UNIT FROM DCS.

R MANUAL RESET OF IS-/I-UNIT FROM DCS.


1

RE FINAL ELEMENT TO BE RESET FROM DCS


AFTER RESET OF IS-/I-UNIT.

RL FINAL ELEMENT TO BE RESET LOCALLY


AFTER RESET OF IS-/I-UNIT.
F
PULSE SIGNAL TO ALLOW OPERATOR ACTION
BEFORE RESET OF IS-/I-UNIT.
MT
NEGATION OF INPUT.
TIC- CLOSE CONTROL VALVE CLOSE
I-121
P27
OUTLET NAPHTHA STABILIZER TV- 2
LZAH HIGH LEVEL IN 2702 REBOILER 2702B AND AND GATE. OR GATE.
P27

2oo3 NAPHTHA STABILIZER, D


2702 C-102 5 sec TRIP OF TIC- OPEN CONTROL VALVE OPEN
3
P27

NAPHTHA STABILIZER OUTLET NAPHTHA STABILIZER TV-


2702 REBOILER BYPASS 2702A MooN M OUT OF N VOTING.
REBOILER, E-109

G R

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.

1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN


0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Seabord Energy, USA


HDT renewable feedstock Client Doc. No.: 32000-PID-42-0
H
SHEET SIZE UNIT

Interlock system NAME


Interlock diagram
T05
DOCUMENT ID

S-09154 P42305 1
JOB NUMBER DOCUMENT NUMBER REV

You might also like