Professional Documents
Culture Documents
INSULATION
CONTROL VALVE GLOBE VALVE SPOOL PIECE C I NOT TO BE USED MEASUREMENTS IN DCS ARE PRESSURE
IF OTHER
SEQUENCE NUMBER
THAN ET
WITH POSITIONER D DIFFERENTIAL K COMPRESSOR, FAN, BLOWER AND TEMPERATURE COMPENSATED.
STEAM TRACING FLUID CODE
MAIN
LINE
E VOLTAGE (EMF) M- ELECTRIC MOTOR 2"
NEEDLE VALVE NOMINAL DIAMETER 4) VENTING TO SAFE LOCATION IS VENTING
VALVE WITH MANUAL F FLOW RATE RATIO (PREFIX TO K, P, X, ETC.)
ELECTRIC TRACED SWING ELBOW AT HIGH POINT WHICH IS SAFE FOR
OPERATION DEVICE G P PUMP EQUIPMENT NUMBER
P
PERSONNEL.
BALL VALVE H HAND (MANUALLY INITIATED) R REACTOR
ET (IF MAIN
TRACED-MEDIA UNSPECIFIED P-101 1/2 or A/B 5) DEAD ENDS, INSTRUMENTATION AND
LINE ET)
I CURRENT (ELECTRICAL) T TANK, STORAGE INSTRUMENT PIPING (INCLUDING FIRST
AIR CYLINDER OPEN DRAIN
J POWER SCAN T- TURBINE DRIVE MAIN / STAND BY ISOLATION VALVE) WHERE FREEZING
BY EPC SPEC
MAIN
LINE
STEAM JACKETED OPERATED VALVE PLUG VALVE OR CONGEALING SERVICE MAY OCCUR 2" 2"
K TIME, TIME SCHEDULE TIME, RATE OF CHANGE (PREFIX TO G, K, P, OR X ONLY) FIRST OF TWO PARTS
B HAND OPERATED SHALL BE TRACED FOR WINTERIZATION.
DOWN L LEVEL V DRUM, SEPARATOR, VESSEL SERIAL NUMBER
P
SLOPE DOWN CONTROL VALVE TO BE FINALIZED DURING DETAILED
DIAPHRAGM VALVE M MONITORING (MOTORS) X MISCELLANEOUS EQUIPMENT EQUIPMENT GROUP LETTER ENGINEERING.
UP
S SILENCER
N OSW
SLOPE UP 6) IN ORDER TO ELIMINATE FORMATION OF CBD
SOLENOID VALVE O ICE WHEN AMBIENT TEMPERATURE IS
BUTTERFLY VALVE INSTRUMENT NUMBER
FREE DRAINING P PRESSURE, VACUUM BELOW 0°F, WEEP HOLES, DOWNSTREAM
(NO POCKETS) M
Q QUANTITY INTEGRATE, TOTALIZE VENTS AND PSV MUST BE DESIGNED SO
FIC - 0101 1/2 or A/B
NON-RETURN OR CHECK STAGNANT CONDENSATE IS NOT
ELECTRIC MOTOR R RADIATION POSSIBLE.
VALVE MAIN / STAND BY
INSTRUMENT LINES OPERATED VALVE S SPEED, FREQUENCY SAFETY
IN-LINE SILENCER FIRST OF TWO PARTS 7) LOW POINT DRAINS AND OTHER DEAD
T TEMPERATURE ENDS WHERE WATER CAN ACCUMULATE
SELF OPERATING ANGLE VALVE LOOP OR INSTRUMENT
COMMUNICATION LINK / U MULTIVARIABLE SHALL BE MADE OF ALLOY 625 MATERIAL
SOFTWARE SIGNAL / TYPE BACK PRESSURE NUMBER IN SECTION BETWEEN R-101 AND X-103.
REGULATING VALVE V VIBRATION
TO BE DEFINED DURING FUNCTIONAL IDENTIFICATION
C DETAILED ENGINEERING W WEIGHT, FORCE
3-WAY VALVE 8) FINAL CONTROL VALVE TYPE SELECTION
SELF OPERATING X UNCLASSIFIED X AXIS BY EPC.
PRESSURE VENT
ELECTRIC SIGNAL / TYPE TO Y EVENT, STATE, PRESENCE Y AXIS FLUID CODES
REDUCING VALVE
BE DEFINED DURING Z POSITION, DIMENSION Z AXIS, SAFETY
DETAILED ENGINEERING AD AMINE DRAIN
SPRING LOADED INSTRUMENTED
AF ANTIFOAM SOLUTION
QUICK CLOSING MINIMUM FLOW VALVE SYSTEM
PNEUMATIC SIGNAL OPEN VENT AM AMINE SOLUTION
VALVE-INTERMITTENT SUCCEEDING LETTER DESIGNATION OF NOZZLES BB BOILER BLOW-DOWN
BLOW DOWN MEASURED OR ON PROCESS EQUIPMENT BF BOILER FEED WATER
CAPILLARY TUBE MODIFIER BW
INITIATING VARIABLES BOILER WATER
SPRING LOADED SAFETY MIXING DEVICE A INLET CAU CAUSTIC SOLUTION
CONNECT TO PROCESS RELIEF VALVE A ALARM B OUTLET CBD CLOSED DRAIN
LIQUID SEAL B C CH HIGH PRESSURE STEAM CONDENSATE
HYDRAULIC SIGNAL COMPENSATOR CL LOW PRESSURE STEAM CONDENSATE
C CONTROL CLOSE D DRAIN
SPRING LOADED VACUUM CM MEDIUM PRESSURE STEAM CONDENSATE
D MECHANICAL LINK OR D DEVIATION E CWR
RELIEF VALVE ADJUSTABLE SPACER RINGS COOLING WATER RETURN
CONNECTION CWS
E PRIMARY ELEMENT F LEVEL SWITCH COOLING WATER SUPPLY
F G DS DIMETHYLDISULPHIDE (DMDS)
INSTRUMENT OR FUNCTION ORIFICE FLAME ARRESTOR DSL DIESEL
G GLASS, GAUGE H HANDHOLE DW DEMINERALIZED WATER
PULSATION DAMPER
H HIGH I FG FUEL GAS
NOISE ATTENUATION DEVICE FL
I INDICATE J RELIEF TO FLARE
INSTRUMENT SURROUNDED FO FUEL OIL
BY BOX IS PART OF J K GSO
VENTURI TEMPORARY STRAINER GAS OIL
DCS / ESD CONTROL SYSTEM K CONTROL STATION L LEVEL INSTRUMENT HC HYDROCARBONS GENERAL
AIR INTAKE L LIGHT LOW M MANHOLE HG HYDROGEN
FLOW NOZZLE HR HYDROGEN RICH GAS
Y-STRAINER M MANUAL INPUT MIDDLE, INTERMEDIATE N
IA INSTRUMENT AIR
FIELD MOUNTED N O SAMPLE CONNECTION KER KEROSENE
ROTAMETER O ORIFICE (RESTRICTION) OPEN P PRESSURE MEASUREMENT LPG LIQUEFIED PETROLEUM GAS
E
P POINT (TEST CONN.) Q MD MDEA SOLUTION
BUCKET TYPE STRAINER NAP
PRIMARY LOCATION NAPHTHA
POSITIVE DISPLACEMENT SPE SPECIAL PIPING Q R NG
(MAIN PANEL) NATURAL GAS
METER ELEMENT R RECORD RUN S SAFETY VALVE NI NITROGEN
STEAM TRAP WITHOUT S SWITCH STOP T TEMPERATURE MEASUREMENT OG OFF-GAS
BEHIND-PANEL DEVICE AVERAGE PITOT TUBE STRAINER OSW OILY SEWER WATER
STATIC MIXER T TRANSMITTER U UTILITY
(NORM. INACCESSIBLE) OR ANNUBAR PA PROCESS AIR
U MULTIFUNCTION MULTIFUNCTION V VENT PC PROCESS CONDENSATE
TURBINE OR STEAM TRAP WITH PH
V VALVE, DAMPER, LOUVER W PHOSPHATE SOLUTION
AUXILIARY LOCATION PROPELLER TYPE STRAINER PW
OFF PAGE CONNECTOR W WELL X PROCESS WATER
(LOCAL PANEL) FLOWMETER SA SERVICE AIR
X UNCLASSIFIED UNCLASSIFIED Y SC STEAM CONDENSATE
VORTEX SHEDDING FIGURE 8-TYPE BLIND,
INTERLOCK SAFETY RELAY, COMPUTE, Z SH HIGH PRESSURE STEAM
FLOWMETER NORMALLY CLOSED Y
IS
FUNCTION CONVERT SL LOW PRESSURE STEAM
1 XX XXX SM
F (GROUP 1) DRIVER, ACTUATOR, MEDIUM PRESSURE STEAM
FIGURE 8-TYPE BLIND, SW SOUR WATER
ULTRASONIC FLOWMETER Z UNCLASSIFIED FINAL
NORMALLY OPEN DIAGRAM NO.
OPC NO.
CONTROL ELEMENT IDENTIFICATION SWS
TWA
STRIPPED SOUR WATER
TREATED WATER
I INTERLOCK LOGIC
VALVE STATE UCO UNCONVERTED OIL
1 (GROUP 1) CORIOLIS FLOWMETER BLIND
ALARM VGO VACUUM GAS OIL
BL
FC FAILURE CLOSED
IS LOCAL INTERLOCK PANEL ALARM ON DCS ARE IDENTIFIED BY PLACING FO FAILURE OPEN
MAGNETIC FLOWMETER SPACER BATTERY LIMIT
1 (GROUP 1) INSTRUMENT DESIGNATION ADJACENT FL FAILURE LOCKED PIPE CLASS CODES
TO THE INSTRUMENT SYMBOLS i.e. : FL/DC FAILURE LAST POSITION/DRIFT CLOSED
U U1 FL/DO FAILURE LAST POSITION/DRIFT OPEN
RUPTURE DISC MANIFOLD/COLLECTOR FIRST IDENTIFIER: SECOND IDENTIFIER:
OTHER AD LC LOCKED CLOSED
DIAGRAM (U1) AH LO LOCKED OPEN B = Class 150 24 = Killed CS
FIC
AD : DEVIATION ALARM
LP LOCKED IN POSITION D = Class 300 36 = 2 1/4 Cr-1 Mo
UTILITY AH : HIGH ALARM
SPRAY NOZZLE HEADER F = Class 600 40 = SS304L
G SKIN TEMPERATURE AL AL : LOW ALARM
G = Class 900 42 = SS316L
MEASUREMENT H = Class 1500 44 = SS321
SPRAY NOZZLE J = Class 2500 47 = SS317L
INCORPORATING HOSE LIMITS TYPE OF LEVEL INSTRUMENTS INSULATION CODES
NNF NORMALLY NO FLOW 66 = SS347H
NON RETURN VALVE 491 = SS254SMO Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
A ACOUSTIC INSULATED 761 = ALLOY625
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
S-09154 P42001 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
S-09154 P42002 1
JOB NUMBER DOCUMENT NUMBER REV
T:\TECH\S-09154\SmartPlant P&ID\S&T Diagrams\S02.igr
1 2 3 4 5 6 7 8 9 10 11 12
VARIOUS SYMBOLS
NOTE
SAMPLE STATIONS FOR GAS BELOW 140°F AND LIQUIDS SAMPLE STATIONS FOR GAS ABOVE 140°F AND LIQUIDS
1) MINIMUM 3 ft BARE TUBE FOR AIR COOLING BEFORE ENTERING
SYMBOLS ON P&I DIAGRAM DETAIL DRAWING SYMBOLS ON P&I DIAGRAM DETAIL DRAWING WATER COOLER.
PIPING
PIPING
FL BL
1/4" WITH GASOMETER.
3/4"
3/4"
4
3/4" 4) CONTROL VALVE OR OTHER EXISTING PRESSURE RESTRICTION
1/4" AP IN THE MAIN LINE.
AP TYPE 5
TYPE 1A ONLY TYPE B
2
SAMPLE
PIPING
COOLER 1/4"
3/4"
SAMPLE BOTTLE
B 2
AP CW BL 1/4"
TYPE 1B 3/4"
1 1/2" SAMPLE BOTTLE
3/4"
SS-SEPARATOR
100 x 250mm
CHEMICAL
SEWER OR DRAIN 3
1 1/2"
NON HAZARDOUS CHEMICAL CHEMICAL
FLASHING LIQUIDS SEWER OR DRAIN SEWER OR DRAIN
C OR NON-FLASHING
LIQUIDS ABOVE 140°F.
PIPING
PIPING
3/4"
3/4"
4 NON HAZARDOUS
GAS ABOVE 140°F. ATMOSPHERE
1/4" SAFE LOCATION
VENT TO ATMOSPHERE
AP 1 AT SAFE LOCATION.
TYPE 2A ONLY TYPE B
PIPING 1
1/4"
SAMPLE
COOLER AP 3/4"
TYPE 6
D CW BL
3/4"
1 1/2"
3/4"
AP
TYPE 2B SAMPLE
2 COOLER
SAMPLE BOTTLE
CW BL
3/4"
3/4"
11/2"
1 1/2"
1 1/2"
E
MINIMIZE
MINIMIZE
CHEMICAL CHEMICAL CHEMICAL
SEWER OR DRAIN SEWER OR DRAIN SEWER OR DRAIN
2
SAMPLE BOTTLE
NON HAZARDOUS ATMOSPHERE
GAS BELOW 140°F. SAFE LOCATION
VENT TO PIPING
ATMOSPHERE AT
SAFE LOCATION. 1/4"
3/4" FLASHING OR
F HAZARDOUS LIQUIDS FL BL
OR GAS ABOVE 140°F.
PIPING
AP VENT TO FLARE.
PIPING
TYPE 3
MINIMIZE
MINIMIZE
PIPING
3/4"
3/4"
4
GENERAL NOTES:
3/4"
2 ONLY TYPE B A) REQUIREMENT FOR TRACING TO BE CONSIDERED.
AP
TYPE 7A 1/4"
B) ALL SAMPLE CONNECTIONS SHALL BE FROM TOP OF PROCESS
SAMPLE BOTTLE 1 PIPE. UNLESS OTHERWISE SPECIFIED.
VENT TO FLARE.
PIPING
AP CW BL
TYPE 7B
3/4"
3/4"
3/4"
4 Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3/4"
11/2" and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
MINIMIZE
MINIMIZE
MINIMIZE
CHEMICAL REV. DESCRIPTION DATE DRAWN CHECK APPR.
SEWER OR DRAIN Seabord Energy, USA
HDT renewable feedstock Client Doc. No.: 32000-PID-03-0
H AP 2 2 SHEET SIZE UNIT
TYPE 4B
S-09154 P42003 1
JOB NUMBER DOCUMENT NUMBER REV
T:\IES3\HTAS SmartSketch\Templates\Process\PID\S02A.igr
1 2 3 4 5 6 7 8 9 10 11 12
VARIOUS SYMBOLS
NOTE
SAMPLE STATIONS FOR GAS ABOVE 140°F AND LIQUIDS SAMPLE STATIONS FOR SPECIAL CASE
1) MINIMUM 3 ft. BARE TUBE FOR AIR COOLING BEFORE ENTERING
SYMBOLS ON P&I DIAGRAM DETAIL DRAWING SYMBOLS ON P&I DIAGRAM DETAIL DRAWING WATER COOLER.
PIPING
TYPE 10
PIPING
MINIMIZE
3/4"
3/4"
2"
AP
TYPE 8 1/4"
1 FLUSHING OIL
1/2"
PRV
1 1/2"
CS
FL BL
PG SAMPLE
#2500 SS
COOLER
PIPING
SL BL
3/4" PG
SAMPLE
3/4"
COOLER CW BL
3/4"
3/4"
11/2" 1/2"
1/2" 3/4"
CW BL 1
C
3/4"
11/2" LG
1 1/2"
TG
1 1/2"
CHEMICAL
SEWER OR DRAIN
#2500 SS CS Press.
PSV
MINIMIZE
MINIMIZE
CHEMICAL
1 1/2"
SEWER OR DRAIN
FL BL
#2500 SS
2
3/4"
SAMPLE BOTTLE
D
CS
LO
SAMPLE BOTTLE
OSW
3/4"
LINE SIZE
WITH VACUUM PUMP OR PORTABLE ANALYZER. 1 B) ALL SAMPLE CONNECTIONS SHALL BE FROM TOP OF PROCESS
SS
TYPE 9
3/4"
D) VALVES IN PIPING TO BE DOUBLED IN HIGH PRESSURE SYSTEMS.
SC BL (AS PIPING SPECIFICATION).
G MIN. 13 ft. OF BARE 1/4" INCONEL IF FLUE GAS
TEMPERATURE IS ABOVE 930°F. CONDENSATE HEADER
T LINE SIZE 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
2
REV. DESCRIPTION DATE DRAWN CHECK APPR.
PI
A
0103
PT PG
0103 0104
4"-HC-0102-D24B-ET
100 P02
FEED
TO E-101
B I
102
3/4" SP
FIC
D
0101
TYPE 1B AL
AP T COMP.
FC
0101
3/4" FV
D
0101
3/4"
FT
D
0101
3/4"
D
IS
D
2
UZV UZY
0101 S 0101
FC UZLO
PI PT 0101
0102 0102
AC
UZC UZLC
PG 0101 0101
0101
E TI
0101
MINIMIZE
D24B D24A
MINIMIZE
4"-HC-0103-D24B-ET
3/4"
By EPC D24B
F D
4"-HC-0101-D24B-ET
INTERMITTANT LINE
INTERMITTANT LINE
INTERMITTANT LINE
MINIMIZE
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-DSL-3108-D24A-ET
3"-HC-0104-D24B-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
3/4"
D
P04
BL
BL
.
FROM V-109 A/B
FROM LIC-0402
FLUSHING OIL
P05
FLUSHING OIL
TO P-101 A/B
V-101 LEVEL
Feed NAME
P01
FROM BL
FROM BL
103
S-09154 P42101 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:31:28
1 2 3 4 5 6 7 8 9 10 11 12
PG
0204
4"-HC-0201-D24B-ET
101 P03
AH FEED
TIC TO A-101 A/B
0203
AL
B
E-101
B1 A2
4"-DSL-0201-D24A-H
A1 B2
PG
0202
TI
0202
PT PI
0201 0201
PG
E 4"-HC-0102-D24B-ET 0203
100 P01
FEED
FROM BL
TV
0203
4"-DSL-0202-D24A-ET 4"-DSL-0203-D24A-ET
3/4"
FC
3/4"
F
MIN. 10 x PIPE ID
D D
TI
0201
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
4"-DSL-1101-D24A-H
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-0204-D24A-P
DIESEL PRODUCT
.
FROM E-106 A/B
P29
NAME
Feed preheat
P02
TO E-111
S-09154 P42102 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:31:49
1 2 3 4 5 6 7 8 9 10 11 12
DESIGN OF CARTRIDGE TYPE FILTER BY VENDOR 1) THE PSV SETTING DOES NOT TAKE INTO ACCOUNT THE LIQUID
HEIGHT. DURING DETAILED DESIGN THE SET PRESSURE MUST
1 BE ADJUSTED.
A
265 psig 2) LOW POINT PROCESS DRAIN.
PSV
0304
Down LO
FL BL
PG
3/4"
0303 3/4"
D
D24B By EPC D
A-101 A
Down
LO
V1 P1
A1 S1
B
MINIMIZE D24B By EPC
B24A D24B
D1
U1
3/4"
B1
C D
MINIMIZE
2
OSW
4"-HC-0201-D24B-ET
B24B D24B
101 P02 CBD
FEED
FROM E-101
D
265 psig
PSV
0305
4"-HC-0301-D24B-ET
Down
LO
FL BL
PG
3/4"
0302 3/4"
D
D24B By EPC D
Down
LO
A-101 B V1 P1
A1 S1
E
MINIMIZE D24B By EPC
3/4"
D
D24B
B24A D24B
D1
B24B
2"-NI-0302-B24A-N
U1
3/4"
B1
F D
MINIMIZE
2
OSW
B24B D24B
CBD
4"-HC-0302-B24B-ET
4"-HC-0304-B24B-ET 4"-HC-0303-B24B-ET
102 P04
FEED
TO V-101
START-UP LINE
G
PDT
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
0301 and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-NI-0301-B24A-N
AH
PDI
0301
1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
.
NAME
Feed filter
NITROGEN
P03
FROM BL
S-09154 P42103 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:32:10
1 2 3 4 5 6 7 8 9 10 11 12
3"-HC-0505-B24B-ET
2) V-101 IS TRACED UPTO MAXIMUM LEVEL.
A P05 105
3) INTERFACE LEVEL.
Down
MINIMUM FLOW
FROM P-101 A/B
FL BL 4) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO ENSURE
SUFFICIENT NPSH FOR P-101 A/B.
PV
3/4" 5) LOW POINT PROCESS DRAIN.
B24B By EPC
D
0402 B
6) AMINE INJECTION PUMP AND TANK WILL BE PROVIDED BY
1 1 CHEMICAL VENDOR.
FC
AH 3/4"
PIC PIC 100 psig 100 psig
D
0402 A 0402 B PSV PSV
AL
0403 A 0403 B
LO
LO
B PV PV Down Down
PV
0402 A
3/4"
3/4"
2"-NG-0401-B24A-ET 3/4" 3/4"
B24B By EPC B24B By EPC
D D
D D
3/4"
3/4"
LC
FO
LO
B24A B24B
D D
PY PT By EPC-HC-0402-B24B-ET
0402 0402 PG
By EPC-HC-0401-B24B-ET
0401
2"-NG-0402-B24B-ET
AH
LIC
4"-HC-0303-B24B-ET 0402
C 102 P03 AL
FEED
MEDIAN
A-101 A/B
2 V-101 B1 S1 V1
A1 LY IS
0402 1
L7 L5 L3 L1
LZY LZAL
LG LZT LZT LZT 0402 0402
M1 2oo3
0401 0402 A 0402 B 0402 C
LZAH
M
B24A B24B 0402
D
L8 L6 L4 L2
U1
B2 IS
ELEVATION 2
D
TI 4
MINIMIZE 0401
L11 L9
3 3
AH
LI LT LG LG
E 0403 0403 0403 0404
M M
D1
INTERMITTANT LINE
F
5
6"-HC-0403-B24B-ET
106 P05
FEED
MINIMIZE
TO P-101 A/B
2"-NG-3302-B24A-ET
3"-SL-0401-B24A-H
2"-AM-0401-B24B-ET
IN VIEW
OSW
CBD
3/4"
D
G
OSW
CBD
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
103
AMINE Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-08-0
H SHEET SIZE UNIT
P33
6
BL
.
NATURAL GAS
P01
V-101 LEVEL NAME
TO FIC-0101
Feed surge drum
P04
LP STEAM
FROM BL
DOCUMENT ID
174
S-09154 P42104 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:32:31
1 2 3 4 5 6 7 8 9 10 11 12
IS
FV 3
0503
B 3"-HC-0505-B24B-ET
P04 105
FO FZAL FFI
3/4"
MINIMUM FLOW
3/4"
TO V-101 0504 0505
D D AL
FZY FI FFY
B24B G24B 0504 0504 0505 RECYCLE OIL TO
1 AL
T COMP. FRESH FEED RATIO
FIC
AC
0503 AL UZLO UZLC
3"-HC-0504-G24B-ET
PI UZY 0501 0501
PDT PG
B24B G24B 0501 0502
3/4"
P-101 A FC
MINIMIZE 2
D
MINIMIZE
6"-HC-0403-B24B-ET
106 P04
FEED 6"-HC-0510-G24B-ET
FROM V-101 FO
0502
D 3/4" ML UZY
D
0502
M 0502
MZAL
3"-HC-0509-G24B-ET
4"-HC-0502-G24B-ET
6"-HC-0501-B24B-ET
0502 IS
1
D
3/4"
IS
1
3
E
3"-HC-0508-G24B-ET
D24B G24B
AH
D PDI PG
0504 0506
PDT PG
0504 0505
3/4"
P-101 B
D
MINIMIZE
6"-HC-0511-G24B-ET FO
B24B G24B
0501
F
ML UZY
0503
M 0503
INTERMITTANT LINE
MZAL
0504 IS
START-UP LINE
START-UP LINE
1
IS
1
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
4"-HC-0503-G24B-ET
3"-HC-0104-D24B-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
3"-HC-0507-G24B-H
4"-HC-0506-G24B-H
125
107
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-09-0
H
P15
.
TO R-101 / R-102
FROM V-109 A/B
P23
P15
P07
FLUSHING OIL
START-UP OIL
START-UP OIL
TO P-102 A/B
NAME
Feed pump
P05
TO C-101
FIC-1501
Piping and instrument diagram
DOCUMENT ID
104
129
S-09154 P42105 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:32:52
1 2 3 4 5 6 7 8 9 10 11 12
MEDIAN
PIP
x
2oo3
. 10
PI PZT PZY PZAH IS MIN
0602 IS TZAH TZY 0606 B 0606 0606 6
6 0606 0606 4) BURNER MANAGEMENT SYSTEM SHALL BE INCLUDED.
F 2
G
By EPC-SL-0601-B24A-H
6"-HR-0904-G44A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
8"-HC-0904-G44A-H
P09
BL
NAME
FROM E-104
TREAT GAS
Heater
P06
LP STEAM
FROM BL
109
S-09154 P42106 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:33:12
1 2 3 4 5 6 7 8 9 10 11 12
PI
6) UTILITY CONNECTION FOR SODA ASH WASHING.
0703
MIN. 5 ft.
7) 4 SKIN THERMOCOUPLES.
3"
10"-HC-0704-H47A-H
108 P06
REACTOR FEED AD
FROM H-101 TIC
X-101 0701 R-101 AH 3/4"
DETAIL A
TI FV
1 D
0703 A 0703 REACTOR
B-D WALL
FC
4 AH
A1/M1 TI
8 3/4"
0704 A I FIC
B-D D
103 0703
C AH AL
TI
T1 8
0705 A
AH B-D
PDI PDT
0701 0701 DETAIL B
AH
TI FT REACTOR
8 WALL
0706 A 0703
B-D
AH
TI
4 H1 T3 2
0707 A
B-H 6"-HC-0708-H47A-H
D
5 H47A G24B MINIMIZE
6"-HC-0705-G24B-ET
A2
MINIMIZE
MIN. 5 ft 5
F24A G24B
AH
TI I FV 3/4"
T2 1 D
0708 A 103 0702
B-D
FC
AH
TI
AH 8
3"-HR-0701-F24A-H
PDI PDT 0709 A FIC 3/4"
B-D D
E 0702 0702 0702
AH AL
TI
8
0710 A
7 B-D
H2 T4 AH
TI
8
TI 0711 A FT
B-D
0713 A 0702
B-D
ELEVATION TI FV 3/4"
3"-HC-0706-G24B-ET
4"-HC-0703-G24B-ET
2 D
0712 A 0704
B-H
3
FL/DO
B1
FIC 3/4"
F D
4 0704
AL
FT FIC I
0701 0701 103
FT
B24A H47A 0704 FV
PI 0701
5 3"-HC-0710-G24B-ET
0706
3/4"
182 P08
3/4"
FC RENEWABLE FEED
3/4"
D 3"-HC-0707-G24B-ET
MINIMIZE PG PT TO R-102
AH D D
0705 0706 TI
G
0714
12"-HC-0709-H47A-H
185 P08
4" HDO REACTOR 1 EFFLUENT
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
TO R-102 and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
5
4"-HC-0503-G24B-ET
3"-HR-1007-F24A-H
3"-NI-0701-B24A-N
P05
BL
.
FROM K-102 A/B
NAME
TO PIC-3308
HDO reactor 1
NITROGEN
P07
FROM BL
107
S-09154 P42107 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:33:35
1 2 3 4 5 6 7 8 9 10 11 12
MIN. 5 ft.
B PT PG 6 8) 4 MIDDLE LAYER THERMOELEMENTS
0805 0806
TI-0803/0804/0805/0806/0809/0810 A-H SEE DETAIL "A"
TI
X-102 0801 5
4"
12"-HC-0709-H47A-H 12"-HC-0801-H47A-H
185 P07 AH
MIN 10 x PIPE ID TI DETAIL A
HDO REACTOR 1 EFFLUENT 1
FROM R-101 0802 A REACTOR
B-D WALL
AH
R-102 TI
4 8
0803 A
B-D
AH
A1/M1 TI
8
0804 A
C B-D
AH
TI DETAIL B
AH T1 8
PDI PDT 0805 A REACTOR
B-D WALL
0804 0804
AH
TI
8
0806 A
B-D
AH
TI
4 T3 2
0807 A
H1 B-H
4"-HR-0802-H47A-H
D
5 H47A F24A
4"-HR-0801-F24A-ET
A2
MIN. 5 ft.
AH AD
TI TY TIC
T2
0808 A 0808 0808
B-D AVG
AH
TI
AH 8
PDI PDT 0809 A
B-H
E 0803 0803 TI FV 3/4"
7 T4 8 D
0810 A 0801
SP
H2 B-D
FL/DO
TI TI
2 3/4"
0812 A 0811 A FIC
B-D B-H D
ELEVATION 0801
AL
3
B1
FT
0801
F 4
B24A G44A
NNF
PI
5
0801
3/4"
D
PG PT
MINIMIZE AH
0802 0801 TI
G
0813
12"-HC-0802-G44A-H
111 P09
4" HDO REACTOR 1 EFFLUENT
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
TO E-102 and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
5
3"-NI-0801-B24A-N
3"-HR-1008-F24A-ET
.
FROM K-102 A/B
SOAKING GAS
NAME
HDO reactor 2
NITROGEN
P08
FROM BL
S-09154 P42108 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:33:56
1 2 3 4 5 6 7 8 9 10 11 12
E-102 A /B HDO REACTOR EFFLUENT/TREAT GAS EXCHANGER E-103 A /B ISOM REACTOR EFFLUENT/TREAT GAS EXCHANGER E-104 RECYCLE OIL / EFFLUENT EXCHANGER 1
NOTE
12"-HC-1002-G44A-H
P10 113 OUTPUT, %
ISOM REACTOR EFFLUENT 0 50 100
FROM R-103
TI 3) CONNECTION TO HAVE TOP ENTRY.
PG 0905 AL
4) QUENCH NOZZLE.
B 0901 TI MIN. 10 X PIPE ID
0906 PROCESS FLOW
12"-HC-0802-G44A-H 6"-HR-0906-G44A-H
111 P08
TI
HDO REACTOR 2 EFFLUENT
6"-HR-0907-G44A-H
FROM R-102 0904
PROCESS
FLOW
PG
0905 PG
E-102 B E-103 B E-104 0907
A1 B2 A1 B2 A1 B2
C
TI
B1 A2 B1 A2 B1 A2 0907
12"-HC-0905-G44A-H
E-102 A E-103 A D 1
4"
A1 B2 A1 B2
3,4
B1 B1 4"-HC-0903-G44AX-ET
A2 A2
D
TI
0903
PG
MIN. 10 X PIPE ID
0909 PG PG
AD
TIC 0902 TI 0903
2
0901 0902 PG
D 1 D 1
0904
3" 3"
6"-HR-0905-F24A-H
TI
0908
E PG
6"-HR-0909-G44A-H
0906
6"-HR-0903-F24A-H
G24BX G44AX
0909
FO
AL
D
0901
TV
D
3/4" 0901 A I
F
PG 116
G44A 0908
6"-HR-0901-F24A-H
F24A
NNF
TV
0901 B
G 6"-HR-0902-F24A-H
FC
3/4"
3/4"
D D Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
4"-HC-1507-G24BX-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
12"-HC-0902-F36B-H
8"-HC-1206-G24A-H
8"-HC-0904-G44A-H
6"-HR-0904-G44A-H
6"-HR-1902-F24A-H
6"-HR-0908-F24A-ET
110
109
ISOM REACTOR EFFLUENT
P12
P15
.
FROM K-102 A/B
P06
P06
RECYCLE OIL
NAME
FROM E-112
TREAT GAS
TREAT GAS
Reactor effluent cooling I
P09
TO H-101
TO R-101
Piping and instrument diagram
DOCUMENT ID
136
118
126
S-09154 P42109 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:34:18
1 2 3 4 5 6 7 8 9 10 11 12
G44A F24A
A SEE DETAIL B. TRANSMITTERS TO BE PROVIDED WITH DOWNSCALE
3"-HR-1001-G44A-H
BURNOUT.
MIN. 5 ft.
3"-HR-1002-F24A-H
1001 1005 UNLOADING THROUGH DUMP NOZZLES. TO BE DETERMINED
6 DURING DETAILED DESIGN.
4"
12"-HC-0901-G44A-H 12"-HC-1001-G44A-H
112 P09
5) UTILITY CONNECTION FOR SODA ASH WASHING.
HDO REACTOR EFFLUENT
FROM E-102 A/B MIN. 10 x PIPE ID 6) CONNECTION TO HAVE TOP ENTRY.
6,9
PT 7) 4 SKIN THERMOCOUPLES. TRANSMITTERS TO BE PROVIDED WITH
1006 R-103
DOWNSCALE BURNOUT.
B 3
PI A1/M1
8) 8 SKIN THERMOCOUPLES. TRANSMITTERS TO BE PROVIDED WITH
1006 DOWNSCALE BURNOUT.
AH 9) QUENCH NOZZLE.
PDI PDT 1
1004 1004
AH QUENCH GAS
TI
AH
TI T1 1002 A
B-D AH
1004 A TI
B-H
2 1003 A PROCESS
8 B-L FLOW
FL/DO
G44A F24A DETAIL A
SP
4"-HR-1006-G44A-H 4"-HR-1005-F24A-ET 3/4" REACTOR
FIC WALL
A2 D
1001
6
MIN. 5 ft.
AH AD
TI TY TIC FT
D
T2 1005 A 1005 1005 1001
AH B-D AVG DETAIL B
PDI PDT
AH REACTOR
1003 1003 TI WALL
1006 A
B-L
3
FV 3/4"
D
8 TZY TZAH IS 1002
T4
1006 1006 4
FL/DO
1oo12
IS TZAH TZY SP
4 1008 1008 2 FIC 3/4"
1oo8 D
1002
AH
E ELEVATION TI
AH 10
PI TI 1007 A
B-D
1002 1008 A 4 H2
B-H
B1
PG PT 7 FT
AH
1001 1002 TI 1002
1010 6 TZY TZAH IS
3"-HR-1003-F24A-H
12"-HC-1002-G44A-H 1009 1009 4
3"-HR-1004-F24A-ET
P09 113 1oo4
ISOM REACTOR EFFLUENT 4"
TO E-103 A/B
6 AH
TI
5 1009 A
F
MINIMIZE
B-D
D
3/4"
G44A
B24A
NNF
G
3"-HR-1008-F24A-ET
3"-HR-1007-F24A-H
4"-HR-1904-F24A-H
3"-NI-1001-B24A-N
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
207
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-14-0
H SHEET SIZE UNIT
P19
BL
P08
SOAKING GAS
SOAKING GAS
NAME
Isom reactor
NITROGEN
P10
FROM BL
TO R-101
TO R-102
Piping and instrument diagram
DOCUMENT ID
141
S-09154 P42110 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:34:40
1 2 3 4 5 6 7 8 9 10 11 12
E-105 A /B /C REACTOR EFFLUENT / STRIPPER FEED EXCHANGER E-106 STRIPPER FEED / BOTTOMS EXCHANGER NOTE
3/4"
LO
195 psig 3/4"
D
PSV D
LO
1110 B By EPC D24BX
Down
3/4"
LO
3/4"
D
D
Down
LC
D24BX By EPC
By EPC D24BX
B
By EPC-HC-1104-D24BX-ET
By EPC-HC-1103-D24BX-ET
MINIMIZE
1
E-105 C
B2 A1
A2 B1
C
E-105 B E-105 A
B2 A1 B2 A1
PI
1109
A2 B1 A2 B1
PG PT
1107 1109
D 12"-HC-1101-F36B-H
TI
119 P12
1104
REACTOR EFFLUENT
PG TI TO X-103
1108 1105 AL
6"-HC-1102-D24BX-H
E
E-106
A2 B1
PG
1101
B2 A1
PT PI
1102 1102
PG
1103
TI
1101
F AL
NO VAPOR POCKETS
PG
1104
TI PG
1106 1105
NNF 4"-DSL-1102-D24A-ET TI
1103
TI PT PI
G
1102 1106 1106
6"-HC-1105-D24BX-H
12"-HC-0902-F36B-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
4"-HC-1402-B24BX-N
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-2704-D24A-H
4"-DSL-1101-D24A-H
116
P27
P14
DIESEL PRODUCT
DIESEL PRODUCT
.
STRIPPER FEED
STRIPPER FEED
P23
P02
NAME
FROM E-104
FROM E-109
FROM V-103
TO E-101
162
122
S-09154 P42111 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:35:01
1 2 3 4 5 6 7 8 9 10 11 12
E-112 RECYCLE OIL / EFFLUENT EXCHANGER 2 X-103 STATIC MIXER 3 E-107 REACTOR EFFLUENT AIR COOLER NOTE
PG
1201 TI
1202 AL
12"-HC-1101-F36B-H 12"-HC-1201-F761AX-H
.
119 P11
x DIA
10
REACTOR EFFLUENT MIN. 10 X PIPE ID N.
B FROM E-105 A/B/C MI
X-103
PI PT
1202 1202 .
NO LIQUID POCKETS
x DIA
. 10
N
MI
F491AX F24A
A2 B1 PROCESS FLOW
PG
MINIMIZE
TI 1205
1201
AL PROCESS
12"-HC-1202-F491AX-P
FLOW
6"-HC-1205-F24BX-N
3/4"
TI
1204 D 6
NO LIQUID POCKETS
MIN. 10 x PIPE ID
7
START-UP LINE TI
8
1203
F24A G24A
MIN. 10 x PIPE ID
HIC
E 1202
6"-HR-1201-F24A-ET
6"-HC-1204-F24BX-N
8
2 E-107
F24B F24BX
3 TI
DESIGN BY VENDOR/EPC CONTRACTOR
7
HV 1206
F D
3/4" 1201 FV VSHH VAHH
G24BX F24BX
D
3/4" 1501 1201 1201
FC
NNF
FC
D
3/4" HIC
1201
D M
3/4" 1
MIN. 10 x PIPE ID
ML
1201
G 5
AH
3"-SW-1605-G40AX-ET
TIC
3"-SW-1604-G40AX-ET
1205
6"-HC-1506-G24BX-N
6"-HR-1903-F24A-ET
AL
3"-HR-1905-F24B-H
8"-HC-1206-G24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
PG
1206
P19
P15
P15
P16
P19
P16
RECYCLE WATER
RECYCLE WATER
.
FROM K-102 A/B
RECYCLE GAS
FROM FV-1901
P09
RECYCLE OIL
NAME
TREAT GAS
TREAT GAS
DOCUMENT ID
138
139
128
127
195
229
132
S-09154 P42112 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:35:22
1 2 3 4 5 6 7 8 9 10 11 12
By EPC-HR-1302-F24BX-ET
1303 A FC
3/4"
3/4"
Down 2) INTERFACE LEVEL.
LO
A FL BL
D 4,8 D
3) EMERGENCY DEPRESSURIZATION PUSH BUTTON. MUST BE
3/4"
AO
920 psig UZLO UZLC EASILY ACCESSIBLE.
D
By EPC F24BX PSV D 3/4" 3 UZY 1303 1303
Down
4) LOCATED AT FIRE SAFE LOCATION.
LO
1303 B 1303
LO
LO HZS IS 5) AIR BOTTLE TO BE PROVIDED TO ALLOW FOR AT LEAST 3
Down
3/4" By EPC-HR-1305-F24BX-ET S VALVE STROKES.
1301 4 UZO
3/4"
D
UZV 1303 FSO F24BX By EPC 6) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO
LC LC 1303 1302 ENSURE SUFFICIENT NPSH FOR P-103 A/B.
D
Down Down
FL BL 7) WATER COMPARTMENT TO BE TRACED UP TO MAX.
By EPC-HR-1304-F24BX-ET LO LO FO LO LO INTERFACE LEVEL.
3/4"
3/4"
TI
B D D 8) HV-1302 TO BE USED AS BACKUP FOR UZV-1303. HV-1302 IS USED
By EPC-HR-1301-F24BX-ET
4,5 1301
FOR CONTROLLED DEPRESSURIZATION OF UNIT DURING
NO LIQUID POCKETS
SHUT-DOWN ALSO. MAX. FLOW IS GOVERNED BY FSO-1302.
10"-HC-1203-G40AX-N
120 P12
PG LZAH IS 9) DIFFERENT TYPES OF CHECK VALVES TO BE INSTALLED TO
GAS / LIQUID
1302 1301 9 MINIMIZE RISK OF FAILURE.
FROM E-107 PT
2oo3 1306
LZY LY LZAL IS 10) PIPE SPEC TO BE UPDATED BY EPC ONCE THE DESIGN OF THE
1301 1301 1301 10 HYDROGEN PRODUCTION UNIT IS FINALIZED.
V-102 S1 V1 B1
AH
A1 PIC
MEDIAN
1306
AL
IS
L1 L3 L5 L7 L9 L11 L13
12
C 2 2 2
F24BX B24A
B24A G40AX L2 L4 L6 L8 L10 L12 L14
U2
U1 B3 B2
ELEVATION D
7
D MINIMIZE
D 1 1 6
MINIMIZE IS LZAL LZY
AC
13 1303 1303 UZLC UZC
2oo3
MINIMIZE 1301 1301
START-UP LINE
MEDIAN LY UZLO
1303 1301
9
FC
AH OSW OSW
LIC I
1303 113 CBD CBD
UZY S 1301
AL
1301 UZV
FT FI IS
E 1301 1301 12
AL
2"-SL-1302-B24A-H
IN VIEW
6"-HC-1301-F24BX-N
IS
AH
IS 13 I LIC
14 UZY UZV 112 1301
AL
UZV UZY 1302 S 1302
1304 S 1304
FC
LIC HS SELECTOR
FC
UZLO 1302
F
1304 LIC
AC D D
UZLC UZC 3/4" 3/4" 1301 A
AC
UZC UZLC LV 1302 1302
FC
FC
1304 1304 1303
2"-SW-1301-G40AX-ET LV LV
D D
PG FC 3/4" 1301 B 3/4" 1301 A
3/4"
3/4"
1304
D D
PZT PZAL PI
1305 1305 1305
2"-BF-1301-HOLD-ET
AL
6"-HC-1302-F24BX-N
FSO
G 10 121 P14
TI 1303
COLD LIQUID
1302
8"-HR-1306-F24BX-ET
IS AP TO V-103
4"-SW-1303-G40AX-ET
14 1301
2"-SW-1606-G40AX-ET
2"-SW-1302-G40AX-ET
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
TYPE 4B and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-1301-B24A-H
3/4"
D
130
146
133
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-17-0
H SHEET SIZE UNIT
P16
BL
BL
V-102 PRESSURE
FROM P-103 A/B
MINIMUM FLOW
RECYCLE GAS
P32
P16
P21
P17
SOUR WATER
SOUR WATER
TO P-103 A/B
NAME
High pressure cold separator
TO HS-1306
P13
LP STEAM
FROM BL
FROM BL
TO V-104
TO V-105
Piping and instrument diagram
HP BFW
DOCUMENT ID
131
S-09154 P42113 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:35:46
1 2 3 4 5 6 7 8 9 10 11 12
3/4"
AH
180 psig 3/4" TI
D 3 4) SPLIT RANGE CONTROL FUNCTION OF PIC-1401.
PSV D 1402
Down
LO
1407 B VALVE OPENING, %
LO By EPC B24BX
100
MINIMIZE
3/4"
3/4" PG
B24BX
D LC A B
D 1406
By EPC B24BX FT
D24A
AH
PT PIC 1402
By EPC-OG-1402-B24BX-ET
OUTPUT, %
By EPC-OG-1401-B24BX-ET
6"-HC-1302-F24BX-N 1401 1401
0 50 100
IN VIEW
121 P13 4 AL
B LZAL IS FI
COLD LIQUID
FROM V-102 1403 17 1402 5) LOCAL OPERATION MUST BE POSSIBLE FROM SAFE LOCATION.
3/4"
MEDIAN
AH D 6) AIR BOTTLE TO BE PROVIDED TO ALLOW FOR AT LEAST 3
LZY LY LIC VALVE STROKES.
1403 1403 1403
3"-OG-1403-B24BX-ET
3"-OG-1404-B24BX-ET
AL
2oo3 7) EMERGENCY VALVES/ACTUATORS ETC. WITHIN A FIRE SCENARIO
ENVELOPE ARE TO BE FIRE SAFE/FIREPROOFED IN ACCORDANCE
V-103 WITH API 553.
50-100 %
A2 A1 S1 V1 B1
0-50 %
8) PERMISSIVE TO START PUMP P-102 A/B WITH FULLY OPEN HV-1401.
FC
1402
AND V-104.
B24A B24BX 3/4"
L8 L2 L4 L6
PV 11) BOOT TO BE TRACED UP TO MAX. INTERFACE LEVEL.
D
1401 A
B2
U1
PHIC 3/4"
D
ELEVATION 1401 B
L11 L9
D 2oo3
FC
D 2 2
MINIMIZE HZZAL HZZY 10
1401 1401 PV 3/4" PG
D
By EPC B24BX
LT LG LG 1401 B 1405
1401 1401 1404 9
HZLC
M M
IS 1401
1
Down
15
HZLO
L12 L10 8
1401
H1 FL BL
11
FC
B3 6,7 OSW
CBD
S HY HV
E 1401 1401 8"-HC-1404-B24BX-N
124 P15
CLOSE RECYCLE OIL
4"-HC-1401-B24BX-N
1
HSS TO P-102 A/B
5
1401 C
START-UP LINE
MINIMIZE
OPEN
HSS 3
1401 B PT PI
AH
LIC CLOSE 1404 1404
1401 HSS FT
AL OSW
1401 A 1401 TI
CBD 1401
ON/OFF
F LV
1401 3/4" FIC SP
D
2"-SW-1401-B24CX-ET 1401
AP
3/4"
3/4"
FC TYPE 4B
FC
1403
NNF
3/4" FV I
D D
D
1401 117
3"-OG-1405-B24BX-ET
NNF
G
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-1402-B24CX-ET
2"-OG-3201-B24BX-ET
3"-HC-1403-B24BX-ET
3"-HC-1508-F24BX-ET
2"-PC-1702-F24BX-ET
4"-HC-1402-B24BX-N
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-HG-2002-D24A-N
3"-SL-1401-B24A-H
3/4"
D
152
122
P17
P20
P32
BL
.
STRIPPER FEED
FROM P-102 A/B
MINIMUM FLOW
P32
P23
P11
CONDENSATE
SOUR WATER
BL
NAME
FROM V-105
FROM V-104
Low pressure flash drum
TO TV-2301
P14
LP STEAM
FROM BL
OFF GAS
TO V-104
TO E-106
OFFGAS
DOCUMENT ID
123
134
142
177
S-09154 P42114 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:36:10
1 2 3 4 5 6 7 8 9 10 11 12
IS
16
FZAL I
1501 116
B
2oo3
MEDIAN AD
FZY FY FIC PV
1501 1501 1501
AL
T COMP.
PDT PG
1501 1502 FC
3/4"
B24BX G24BX
P-102 A
8"-HC-1404-B24BX-N D 2
124 P14
MINIMIZE
RECYCLE OIL 8"-HC-1502-G24BX-ET
3"-HC-1505-G24BX-ET
FROM V-103 FT
MINIMIZE
1502
6"-HC-1504-G24BX-ET
D
G24BX
ML UZY
1501
M 1502
G24B
MZAL
D
1502 IS 3/4"
15
D
3/4" 1
IS
B24B B24BX
15
8"-HC-1501-B24BX-ET
FIC
D
1502 3/4"
G24BX
FO
E
AH
PDI FV
F24BX
D
1504 PG 1502 3/4"
1506
2"-DS-1501-B24B-N
PDT PG
1504 1505
3/4"
P-102 B
D
8"-HC-1503-G24BX-ET
B24BX G24BX
F
ML UZY
DMDS 1503
M 1503
MZAL
3
1504 IS
15
IS
START-UP LINE
15
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
4"-HC-1507-G24BX-ET
3"-HC-1508-F24BX-ET
6"-HC-1506-G24BX-N
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-HC-0506-G24B-H
127
129
126
128
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-19-0
.
FROM P-101 A/B
MINIMUM FLOW
P14
P12
P05
P09
P12
START-UP OIL
RECYCLE OIL
TO FFY-0505
NAME
Recycle pump
TO FV-1501
P15
TO H-101
TO V-103
TO E-112
Piping and instrument diagram
SIGNAL
DOCUMENT ID
125
S-09154 P42115 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:36:31
1 2 3 4 5 6 7 8 9 10 11 12
PDI AH
1605 PG
1602
PDT PG 3"-SW-1602-G40AX-ET
1605 1607 P-103 A
3/4"
4"-SW-1607-G40AX-ET D
FO
ML 1604
1601
M
UZY
1602
IS
PDI AH 13
D
1606 PG
1603
PDT PG 3"-SW-1603-G40AX-ET
1606 1604 P-103 B
3/4"
4"-SW-1601-G40AX-ET D
PI PT
1601 1601
FO
ML 1603
E 1603
M
UZY
1604
IS
13 FT
FO
1 1601
1602
LO
F
I FIC 3/4"
D
113 1601
AL
T COMP.
FC
FV 3/4"
D
1601
G
NNF
2"-SW-1606-G40AX-ET
3"-SW-1604-G40AX-ET
3"-SW-1605-G40AX-ET
4"-SW-1303-G40AX-ET
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
132
195
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-20-0
H SHEET SIZE UNIT
P13
RECYCLE WATER
RECYCLE WATER
.
MINIMUM FLOW
P13
P12
P12
SOUR WATER
NAME
FROM V-102
TO X-103
TO E-107
Piping and instrument diagram
DOCUMENT ID
130
S-09154 P42116 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 10:12:43
1 2 3 4 5 6 7 8 9 10 11 12
H2 H2S
AI AI AH
1702 1701
AL AL
AT AT
1702 1701
B
FIC FT 8"-HR-1702-F24BX-ET
135 P18
1701 1701
RECYCLE GAS
TO K-102 A/B
FV
1701
4"-HR-1703-F24BX-ET
4"-HR-1704-F24BX-ET
3/4"
3/4"
FC
MINIMIZE
D D
8"-HR-1701-F24BX-ET
Down
C FSO
1702
AP
1701 PG
TYPE 4B
1705
SAFE LOCATION
B1 V1 V-105
1
A1
L5
L3
3/4"
L1 L7
START-UP LINE
D
6"-SM-1701-D24A-ET
M1
IS
L2 L8 PG
MEDAIN
PG 10
L4 1704
1701
L6 F24BX D24A
F24BX B24A
AH
PI PT LIC X-105
3 U1
1702 1702 1702
3/4"
AL B2
MINIMIZE
D
F TI D
ON/OFF
1701 LV
1702 2
2"-PC-1701-F24BX-ET
3/4"
FC
3/4"
3/4"
D
NO LIQUID POCKETS
4"-OG-1701-F24BX-ET
D D
PG
FSO 1703
OSW
1703
NNF
G CBD
2"-SM-2302-D24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
8"-HR-1306-F24BX-ET
2"-PC-1702-F24BX-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-1701-B24A-H
3/4"
D
P23
BL
.
RECYCLE GAS
P14
CONDENSATE
BL
NAME
PURGE GAS
FROM V-102
FROM BL
TO V-103
209
S-09154 P42117 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 10:12:08
1 2 3 4 5 6 7 8 9 10 11 12
3/4"
Down
FL BL
LO
V
3/4"
Down
LO
AH AH
PDI PI
1801 1802
PDT PT
AH
B 1801 1802 TI
1802
8"-HR-1702-F24BX-ET K-102 A
135 P17 228 P19
LO LO LO LO
RECYCLE GAS RECYCLE GAS
FROM V-105 TO FV-1901
1
2
IS UZY ML
9 1801
M 1801
1250 psig
IS MZAL PSV V
9 1802 1806
C
3/4"
Down
LO
V
3/4"
Down
LO
AH AH
PDI PI
1804 1805
PDT PT
AH
1804 1805 TI
1801
K-102 B
D
LO LO LO LO
1
3
IS UZY ML
10 1802
M 1803
IS MZAL
10 1804
G
By EPC-CWR-1801-B24A-ET
By EPC-CWS-1801-B24A-ET
By EPC-SL-1801-B24A-H
By EPC-NI-1801-B24A-N
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
BL
BL
COOLING WATER
COOLING WATER
.
BL
NAME
Recycle gas compressor
NITROGEN
P18
LP STEAM
FROM BL
FROM BL
FROM BL
DOCUMENT ID
S-09154 P42118 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:37:34
1 2 3 4 5 6 7 8 9 10 11 12
NOTE
B FV
1901
228 P18
FL/DO
3/4"
3/4"
RECYCLE GAS
FROM K-102 A/B
D D
6"-HR-1901-F24A-H
MINIMIZE
3/4"
MIN. 6 ft.
F24A B24A
D
D
MIN, 10 X PIPE ID
1
TYPE 7A
AP
1901
FIC IS FZAL
1901 4 1901 FZT
AL
1901 A
MEDIAN
2oo3
E FY FZY FZT
1901 1901 1901 B
FZT
1901 C
3"-HR-1906-F24A-H
FT
1902
START-UP LINE
FIC
F24A
1902 3/4"
D
FC
F24B
G D
FV 3/4"
1902
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
6"-HR-1903-F24A-ET
3"-HG-2101-F24A-H
3"-HR-1905-F24B-H
6"-HR-1902-F24A-H
4"-HR-1904-F24A-H
4"-NI-1901-B24A-N
136
138
141
229
H
TO E-102 / E-103 A/B
BL
.
FROM K-101 A/B
RECYCLE GAS
P12
P09
P12
P10
P12
NAME
TREAT GAS
TREAT GAS
TREAT GAS
RGC OH cooling
NITROGEN
P19
FROM BL
TO E-112
TO E-104
TO E-107
S-09154 P42119 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:37:54
1 2 3 4 5 6 7 8 9 10 11 12
V-106 MAKEUP GAS K.O. DRUM E-113 MU COMPRESSOR KICK BACK COOLER NOTE
P21 143
E-113 SPILL BACK
FROM P-1306 A
P22 230
B
SPILL BACK
FROM P-1306 B
144 P21
MAKEUP HYDROGEN
TO K-101 A
B24A D24A
1
D V-106
3/4"
TYPE 4A
AP
2001
FT FI
E 2001 2001
TI
AH
2001 PT PI
2002 2002
AL
PG
2001
START-UP LINE
F
FL BL
6"-HG-2001-D24A-N
G
By EPC-SL-2001-B24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-HG-2002-D24A-N
D
3"-NI-2001-B24A-N
3/4"
149
HTRC MAKEUP HYDROGEN
MAKEUP HYDROGEN
H SHEET SIZE UNIT
BL
BL
BL
.
P14
P22
NAME
Makeup gas K.O. drum
TO K-101 B
NITROGEN
P20
LP STEAM
FROM BL
FROM BL
FROM BL
TO V-103
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:38:16
1 2 3 4 5 6 7 8 9 10 11 12
K-101 A MAKEUP GAS COMPRESSOR E-116 MAKEUP COMPRESSOR 1st STAGE INTERCOOLER V-110 MAKEUP GAS COMPRESSOR K.O. DRUM 2nd STAGE NOTE
1250 psig
DESIGN BY VENDOR/EPC CONTRACTOR
PSV V
2103
3/4"
Down
FL BL
LO
V
3/4"
Down
LO
AH AH
PDI PI
2104 2102
B
PDT PT
AH
2104 2102 TI
2102
K-101 A
144 P20
MAKEUP HYDROGEN
FROM V-106
1
E-116
231 P22
V-102 PRESSURE
PV-1306 B
IS
PIC PV 9
M 1306 B 1306 A UZV UZY
2101 S 2101
FO
FC
SELECTOR HS PIC
SWITCH 1306 1306 A UZLO
V-110 2101
UZC UZLC
E 2101 2101
AC
UZLO UZLC AC
IS
S
10 UZC
UZV 2102
2102
FL BL
P22 147
FC MAKEUP HYDROGEN
F FROM K-101 B
PT PI
3"-HG-2201-F24A-H
2101 2101
TI
P20 143
2101
SPILL BACK
TO E-113
FT FI
2101 2101
AL
G
By EPC-CWR-2101-B24A-ET
By EPC-CWS-2101-B24A-ET
By EPC-SL-2101-B24A-H
By EPC-NI-2101-B24A-N
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
3"-HG-2101-F24A-H
1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
145
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-25-0
MAKEUP HYDROGEN
H SHEET SIZE UNIT
P13
BL
BL
BL
COOLING WATER
.
COOLING WATER
V-102 PRESSURE
FROM PIC-1306
P19
TO MIX POINT
BL
NAME
Makeup gas compressor I
NITROGEN
P21
LP STEAM
FROM BL
FROM BL
FROM BL
DOCUMENT ID
146
S-09154 P42121 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:38:38
1 2 3 4 5 6 7 8 9 10 11 12
K-101 B MAKEUP GAS COMPRESSOR E-117 MAKEUP COMPRESSOR 1st STAGE INTERCOOLER V-111 MAKEUP GAS COMPRESSOR K.O. DRUM 2nd STAGE NOTE
3"-HG-2201-F24A-H
P21 147
MAKEUP HYDROGEN
TO MIXPOINT
1250 psig
PSV V
2203
3/4"
Down
FL BL
LO
231 P21
3/4"
V-102 PRESSURE V
FROM PIC-1306 B
Down
LO
AH AH
PDI PI
2201 2202
C
PDT PT
AH
2201 2202 TI
K-101 B 2201
E-117
FO
PV
1306 B
V-111
FL BL
G
By EPC-CWR-2201-B24A-ET
By EPC-CWS-2201-B24A-ET
By EPC-SL-2201-B24A-H
By EPC-NI-2201-B24A-N
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
230
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-26-0
MAKEUP HYDROGEN
BL
BL
BL
COOLING WATER
COOLING WATER
P20 .
BL
NAME
FROM V-106
P22
LP STEAM
FROM BL
FROM BL
FROM BL
DOCUMENT ID
149
S-09154 P42122 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:39:00
1 2 3 4 5 6 7 8 9 10 11 12
3/4"
By EPC B24BX 125 psig 3/4"
D 3) TO BE PROVIDED WITH WEEP HOLE DIA 1/2" AT LOW POINT
PSV D PG PT DOWNSTREAM OF LAST BLOCK VALVE.
Down
LO
By EPC-HC-2303-B24BX-ET
2309 B 2308 2307
4 4) TEMPERATURE MEASUREMENT MUST BE LOCATED CLOSE TO
1"
NO LIQUID POCKETS STRIPPER OUTLET.
LO
3/4"
3/4"
D AH
5) SPLIT RANGE CONTROL FUNCTION OF PIC-2307.
D TIC
LC
1
2303
AL VALVE OPENING, %
100
B
SP
By EPC-HC-2304-B24BX-ET
C-101 A B
B1 FIC FT
V1
2303 2303
OUTPUT, %
FV TI 0 50 100
P1
2303 2302
2"-NAP-2301-B24BX-N 2"-NAP-2302-B24BX-N 6) ELEVATION TO BE VERIFIED DURING DETAILED DESIGN TO
M1 A3 ENSURE SUFFICIENT NPSH FOR P-106 A/B.
MINIMIZE FO
3/4"
3/4"
AH 1 D24BX B24BX 7) CONNECTION TO HAVE TOP ENTRY.
PDI PDT D D
2301 2301 8) QUENCH NOZZLE.
C 2
AP
3 2301 PROCESS FLOW
TYPE 4B
PROCESS
2"-NAP-2303-B24BX-N
5 FLOW
6"-HC-2302-D24BX-H NO VAPOR POCKETS
A1 M2
P2
6
7
D
SAFE LOCATION
20
FT
M3 2302
AH 21
PDI PDT
AC
TIC 2302 2302 UZLO UZLC
3/4"
3/4"
AL 2301 30 UZY 2301 2301 FIC
MIN. 10 x PIPE ID
D
2301 2302
3
31
PG IN VIEW IS T COMP.
FC
S
E 2303 18 UZC
B24BX D24BX 32
SP
TG UZV 2301 3/4" FV
P3 D
3"-HC-2301-B24BX-ET 2301 2301 2302
7,8 G24B D24A
A4 A2 2"-SM-2303-D24A-H
MINIMIZE
FC
3/4"
3/4"
MINIMIZE
D 3/4"
D MINIMIZE FV I
D
2301 118
L1
FC
L3
3/4" IS
D L5
19 3/4" FIC
L7 D
2301
F
FC
AL
L4
IS 2305
MEDIAN
L8 L2
18
D24A B24A
ELEVATION TI PG
U1 AH
LIC 2304 2306
G
2302
6 B2 AL
2"-SM-2301-D24A-H
D
2"-NAP-2304-B24BX-N
MINIMIZE
2"-SM-2302-D24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-NAP-2604-B24BX-N
3"-HC-1403-B24BX-ET
3"-DSL-2405-D24A-H
6"-HC-1105-D24BX-H
6"-HC-2305-B24BX-P
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2
3"-HC-0507-G24B-H
3"-SL-2301-B24A-H
6"-DSL-2301-D24A-H 3/4"
D
168
209
160
153
158
154
Seaboard Energy, USA
STRIPPER FEED BYPASS
C-101 OH PRESSURE
C-101 OH PRESSURE
H
STRIPPER REFLUX
SHEET SIZE UNIT
P14
P11
P24
P05
P26
P26
BL
BL
FROM E-105 A/B/C
DIESEL PRODUCT
OSW
.
STRIPPER FEED
TO PHIC-2307 B
TO PHIC-2307 A
WILD NAPHTHA
FROM LIC-2603
P24
P31
P17
P27
P25
P26
P26
START-UP OIL
STRIPPER OH
TO P-106 A/B
C-101 LEVEL
CBD NAME
FROM V-103
TO FIC-3101
Product stripper
P23
MP STEAM
MP STEAM
LP STEAM
FROM BL
FROM BL
TO C-102
TO X-105
TO E-108
Piping and instrument diagram
DOCUMENT ID
152
151
220
206
157
155
S-09154 P42123 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:39:25
1 2 3 4 5 6 7 8 9 10 11 12
PG
PDI AH 2402
2406
PDT PG
3/4"
2406 2404 P-106 A
D
6"-DSL-2402-D24A-ET
4"-DSL-2404-D24A-ET
ML
2401
M
UZY
2402
IS
19
D
PG
PDI AH 2403
2405
4"-DSL-2403-D24A-ET
PDT PG
3/4"
2405 2407 P-106 B
D
6"-DSL-2401-D24A-ET PI PT
2401 2401
E ML
2403
M
UZY
2404
IS FO
19 1
2401
LO
F
3"-DSL-2405-D24A-H
4"-DSL-2406-D24A-H
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
6"-DSL-2301-D24A-H
216
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-28-0
H SHEET SIZE UNIT
P23
DIESEL PRODUCT
DIESEL PRODUCT
.
MINIMUM FLOW
P23
P27
NAME
FROM C-101
TO E-109
Piping and instrument diagram
DOCUMENT ID
221
S-09154 P42124 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:39:45
1 2 3 4 5 6 7 8 9 10 11 12
E-108 PRODUCT STRIPPER OH AIR COOLER E-114 PRODUCT STRIPPER OH TRIM COOLER NOTE
1 E-108
B
VSHH VAHH
2501 2501 TI
3
2504
2
M
C
NO LIQUID POCKETS
ML
2501
MIN 10 x PIPE ID
4
AH
TIC
2503
AL
80 psig
PSV PG
D 2503 2502
8"-HC-2502-B24CX-N
By EPC-CWR-2503-B24A-ET
MINIMIZE
E
E-114
B1 A2
TG
2502
A1 B2
PG
2501 AH
6"-CWR-2501-B24A-ET
TI
6"-CWS-2502-B24A-ET
2501
6"-HC-2503-B24CX-N
F 156 P26
STRIPPER OH
TO V-107
3/4"
3/4"
LO
LO
NNF
D D
G
6"-CWR-2502-B24A-ET
6"-CWS-2501-B24A-ET
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-HC-2305-B24BX-P
3"-HC-2701-B24BX-P
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
P27
BL
COOLING WATER
COOLING WATER
.
BL
NAME
FROM C-101
FROM C-102
P25
FROM BL
DOCUMENT ID
153
159
S-09154 P42125 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:40:05
1 2 3 4 5 6 7 8 9 10 11 12
P-104 A /B SOUR WATER PUMP V-107 PRODUCT STRIPPER REFLUX DRUM P-105 A /B PRODUCT STRIPPER REFLUX PUMP NOTE
MINIMIZE
PT PI
STRIPPPER OH REVIEWED DURING DETAILED DESIGN.
FROM E-114 2604 2604 PG IN VIEW
2603 6) BOOT TO BE TRACED UP TO MAX. INTERFACE LEVEL.
B24CX V-107
A1 V1 B1
7) PUMP P-104 A/B TO BE ELECTRICAL TRACED.
LO
4"-OG-2601-B24BX-ET
SPEED DRIVE.
B 3/4"
L3 L1 D 9) LINE TO BE SIZED DURING DETAILED DESIGN.
5
B24BX
AH
FO LG LT LIC
M1
B24A
2602 2604 2603 2603
4"-OG-2602-B24BX-ET
M AL
B24A B24CX
L4 L2
U1
B2
ELEVATION PV 3/4"
D
D 2307 B
C
By EPC B24BX
1
FC
L5 L7
MINIMIZE
3/4"
3 4
3 D
3/4"
PHIC PV
AH D
LIC LT LG LG 2307 B 2307 A TYPE 4B
2602 2602 2602 2601
AP
FC
AL M M
2601
3/4"
50-100 %
L6 L8 D
PHIC
B3 H1 OSW
2307 A
6
CBD
Down
D 2"-NAP-2605-B24BX-N
0-50 %
2"-SW-2601-B24CX-ET
3"-NAP-2601-B24BX-H
195 psig
PSV
9 AH
2616 PDI PG
LO 4 2619 2605
3/4" AH
PDI FL BL
3/4"
D
2613 PDT PG
LO
D 2619 2608
9
3/4"
E 7, 8
PG PG PDT
2615 2611 2613 D PG
P-104 A OSW P-105 A 2602
9
CBD 3"-NAP-2602-B24BX-ET
PT PI
3/4"
3"-NAP-2607-B24BX-ET
195 psig 2"-SW-2606-B24CX-ET 2601 2601
M
D PSV
2617 ML TI
LO M 2601 2601
ML
3/4"
2"-SW-2603-B24CX-ET
2603
3/4"
D SELECTOR
AH
SWITCH PDI
LO
D HS SP SIC 2612 PG
F 9
2601 2602 2606
7, 8 AH
PG PG PDT PDI 3"-NAP-2606-B24BX-ET
2614 2610 2612 2609
2"-SW-2604-B24CX-ET P-104 B
3/4"
PDT PG
2609 2607 D
3/4"
2"-SW-2602-B24CX-ET
4"-OG-2603-B24BX-ET
START-UP LINE
D
SP SIC ML
P-105 B
2601
M 2602
3"-NAP-2603-B24BX-ET PI PT
G TYPE 4B
AP 2618 2618
2602
M
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-2605-B24CX-ET
ML 3"-NAP-2604-B24BX-N
3"-NG-3303-B24A-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-2601-B24A-H
2604 3/4"
D
155
157
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-30-0
PRESSURIZATION GAS
C-101 OH PRESSURE
C-101 OH PRESSURE
H
STRIPPER REFLUX
P33
P23
P23
BL
REMOVAL UNIT
FROM PIC-2307
FROM PIC-2307
P32
P23
P23
SOUR WATER
BL
NAME
TO FIC-2303
TO V-104
158
154
S-09154 P42126 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:40:30
1 2 3 4 5 6 7 8 9 10 11 12
VALVE OPENING, %
A1
P1 100
1
V1 A B
6
B 7
AH
PDT PDI
2705 2705 OUTPUT, %
11 0 50 100
12
AH 5) TOP OF WEIR TO BE 32 inch BELOW DRAW OFF TRAY OF C-102.
TIC
T1 TO BE VERIFIED DURING DETAILED DESIGN.
2702 AL 13
I 6) CONNECTION TO HAVE TOP ENTRY.
121 4 PG
P2
M2
2704 7) QUENCH NOZZLE.
B3
PG
AH
TI 2703 TI LIC
163 P28 PROCESS FLOW
2705 2704 2702
C AL
AL C-102 LEVEL
TO FIC-2801
3"-HC-2703-B24A-H
A2 L5
MEDIAN
NO LIQUID POCKETS
L3
PG PROCESS
L7 L1 FLOW
2701 LY IS
2702 20
E-109
B2
LG LZT LZT LZT LZY LZAL
2701 2702 A 2702 B 2702 C 2702 2702
4"-DSL-2701-D24A-H
M 2oo3
A1 LZAH
5 1
2702
D
B1 A2 A3 ELEVATION
I
L8 L2
121
L4
PG 2"-NAP-2702-B24A-H
A3 L6
2702
U1 H1
2"-DSL-2703-D24A-H
THIC THIC
3"-HC-2702-B24A-H
2702 A 2702 B D
D
3/4" TI MINIMIZE
B2
E 2706
FO
TV
D 3
3/4" 2702 A TI
3 2"-NAP-2701-B24A-P
2707
164 P28
D STABILIZED NAPHTHA
3/4" TO E-110
FC
TV
D
2702 B 3/4"
F OSW
OSW
CBD
CBD
4"-DSL-2702-D24A-H
MIN. 10 x PIPE ID
6,7
TI
2701
G
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-2406-D24A-H
2"-NAP-2304-B24BX-N
2"-SL-2701-B24A-H
4"-DSL-2704-D24A-H
3"-HC-2701-B24BX-P
162
P24
BL
DIESEL PRODUCT
DIESEL PRODUCT
.
FROM P-105 A/B
P11
NAME
Naphtha stabilizer
P27
OH VAPOR
LP STEAM
FROM BL
TO E-108
TO E-106
216
S-09154 P42127 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 12:09:35
1 2 3 4 5 6 7 8 9 10 11 12
2"-NAP-2701-B24A-P
164 P27
STABILIZED NAPHTHA
FROM C-102 TI
2804
B
1
E-110
3
PG
AH
VSHH VAHH TW TI 2803
2
2801 2801 2803 2802
2"-NAP-2801-B24A-N
C
MIN. 10 x PIPE ID
M
ML FT 3/4"
D
2801 2801
3/4"
D
SP
FIC
163 P27
2801 3/4"
C-102 LEVEL T COMP. D
FROM LIC-2702
AP
FC
TYPE 1B
I 2801
120 3/4"
FV
D
E 2801
TI
2801
PG
2802
IS
20 PT PI
UZY UZV 2801 2801
2801 S 2801
FC
UZLO
2801 NNF
AC
UZLC UZC
2801 2801
2"-NAP-2803-B24A-N
2"-NAP-2802-B24A-N
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
3/4" 3/4"
D D
BL
NAME
Naphtha product cooling
Piping and instrument diagram
P28
TO BL
TO BL
DOCUMENT ID
S-09154 P42128 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:41:22
1 2 3 4 5 6 7 8 9 10 11 12
PG
B 2902
HIC
2901
C
1
E-111
VSHH VAHH
2901 2901
TW
D M 2902
2
PG
AH
TI 2901
2901
ML 4"-DSL-2901-D24A-N
166 P30
2901
DIESEL PRODUCT
MIN. 10 x PIPE ID TO V-108
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
4"-DSL-0204-D24A-P
.
NAME
FROM E-101
S-09154 P42129 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:41:42
1 2 3 4 5 6 7 8 9 10 11 12
LO
By EPC-DSL-3001-D24A-ET
4) BOOT TO BE TRACED UP TO HIGH INTERFACE LEVEL.
Down
D24A By EPC
TYPE 1A
PG AP
B 3001 3002
3/4"
DIESEL PRODUCT DIESEL PRODUCT
FROM E-111 TO V-109 A/B
PDT D
3003
AH
PDI
3003
V-108 A1 S1 V1 B1
C
M1 M2
B24A D24A
D24A B24A
U1 U2
D
D D
MINIMIZE MINIMIZE
L1 L3
2
2
AH
LIC LT LG LG
3001 3001 3001 3002
AL M M
L4
L2 H1
E
B2
4
1
2"-SW-3001-D24A-ET
OSW
CBD
F
D
D24A
3/4"
AP
D40A
FC TYPE 1B
3001
3/4"
LV
D
3001
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-3002-D40A-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-3001-B24A-H
2"-SL-3002-B24A-H
1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
234
BL
.
P32
SOUR WATER
NAME
Diesel product/ water separator
P30
LP STEAM
LP STEAM
FROM BL
FROM BL
DOCUMENT ID
S-09154 P42130 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:42:05
1 2 3 4 5 6 7 8 9 10 11 12
1) INTERFACE LEVEL.
2) THE PSV SETTING DOES NOT TAKE INTO ACCOUNT THE LIQUID
A HEIGHT. DURING DETAILED DESIGN THE SET PRESSURE MUST
BE ADJUSTED AGAINST HEIGHT.
4"-DSL-3106-D24A-H
4"-DSL-3107-D24A-H
B FT
D
265 psig 3101
3/4"
2 265 psig
D
Down
D24A By EPC
Down
D PSV
3/4"
3105
LO
D24A By EPC
AH
PDT PDI 2 LO
3/4"
3101 3101
Down
C I FIC
D D
By EPC-DSL-3105-D24A-ET D 119 3101 3/4"
3/4" T COMP
D24A By EPC
PG PG SP AP
FC
LO
TYPE 1B
3103 3102 3101
FV
D
3101 3/4"
By EPC-DSL-3104-D24A-ET
V-109 A V-109 B
B1 B1
M1 V1 M1 V1
P1 S1 P1 S1
TI
3101
D
PG
3107
PI PT
3106 3106
MINIMIZE
H1 H1
E
L1 L3 L3
3/4"
1 M2 1 L1 M2 D
LG LG
AH 3103 AH 3101
LI LT LG 1 LI LT LG 1
M M
3104 3104 3104 M 3102 3102 3102
M
A1 A1
B24A D24A B24A D24A
L2 L4 L2 L4
U1 U1
D1 D1
D D
3
3
F MINIMIZE MINIMIZE
IN VIEW IN VIEW
NNF
4"-DSL-3101-D24A-ET
3"-SL-3101-B24A-H
3"-SL-3102-B24A-H
4"-DSL-3109-D24A-H
4"-DSL-3110-D24A-H
OSW OSW
INTERMITTANT LINE
CBD CBD
4"-DSL-3102-D24A-ET
G
3"-DSL-3108-D24A-ET
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
D D
4"-DSL-3003-D24A-N START-UP LINE 4"-DSL-3103-D24A-ET
3/4" 3/4"
169 P30
3/4"
DIESEL PRODUCT
FROM V-108
D 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
0 First Issue Sep 06, 2019 ABUM/PMAR EDCB OLKN
REV. DESCRIPTION DATE DRAWN CHECK APPR.
167
DIESEL PRODUCT RECYCLE
Seaboard Energy, USA
HDT renewable feedstock Client Doc. No.:32000-PID-35-0
H SHEET SIZE UNIT
P23
OFF-SPEC DIESEL
BL
DIESEL PRODUCT
.
FROM LIC-2302
TO FEED E-101
P01
BL
BL
C-101 LEVEL
NAME
Diesel product dryer
P31
LP STEAM
FROM BL
TO BL
TO BL
DOCUMENT ID
168
S-09154 P42131 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
JAPR 26/09/2019 12:11:04
1 2 3 4 5 6 7 8 9 10 11 12
PV
180 psig 3204 B
PSV
3202 A
3/4"
FC
3/4"
Down LO
FL BL
2"-OG-3204-B24BX-ET
D D
3/4"
3/4" 4 4
D
By EPC B24BX 180 psig D
Down
LO
AH
B PSV PIC PIC
3202 B By EPC B24BX 3204 B 3204 A
AL
LO PV
B24BX By EPC
PV PV
3/4"
3/4" 3204 A
D 2"-OG-3205-B24BX-ET
D
FO
3/4"
3/4"
LC
PT PY D D
3204 3204
By EPC-OG-3203-B24BX-ET
By EPC-OG-3202-B24BX-ET
PG
3203 B24BX B24A
C
B1
V1
V-104
S1
A2
A1
D
MINIMIZE
L3 L1
2
2"-HC-3201-D40AX-ET
D1
AH
LG LT LIC
3202 3201 3201
M AL
INTERMITTANT LINE
SP
M1
B24A D40AX FIC
L4 L2
E 3201
U1
FT
IN VIEW
3201
B2
D
MINIMIZE 3 FV
3201
2"-SW-3201-D40AX-ET
FC
3/4"
3/4"
D
D
1
F
OSW
AP
CBD 3201
TYPE 4B PG
OSW
3201
CBD
2"-SW-3202-D40AX-ET
G
2"-SW-1302-G40AX-ET
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SW-1402-B24CX-ET
2"-SW-2605-B24CX-ET
2"-OG-3201-B24BX-ET
2"-SW-3002-D40A-ET
2"-NG-3304-B24A-ET
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
2"-SL-3201-B24A-H
3/4"
D
P26
P13
P30
P33
BL
.
FROM P-104 A/B
NATURAL GAS
P14
SOUR WATER
SOUR WATER
SOUR WATER
SOUR WATER
SOUR WATER
BL
NAME
FROM V-103
FROM V-102
FROM V-108
Sour water flash drum
P32
LP STEAM
FROM BL
FROM BL
OFF GAS
Piping and instrument diagram
TO BL
DOCUMENT ID
202
176
175
234
232
S-09154 P42132 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:42:55
1 2 3 4 5 6 7 8 9 10 11 12
MEDIAN
LOCAL
RESET
HS IS (REFER TO P06 FOR HEATER)
SAFE LOCATION
3301 6 IS PY IS BURNER MANAGEMENT SYSTEM
6 3308 6 ONE BURNER BLOCK
PILOT BURNER
UZV
MAIN BURNER
UZY
3302 S 3302
AC 2oo3 2
IS UZLO UZLC PZY PZAL
FO
S
B 6 3305 3305 3308 3308
3/4"
FC FC
3/4"
1 1
FC
FC
D D UZLO UZLO
3303 3304
C IN VIEW PG
AC AC
3309 UZC UZLC UZC UZLC
3303 3303 3304 3304
COMMON
LOCAL SAFE LOCATION
RESET IS
FI HS IS 8
3302 P, T 3302 8 UZV UZY
COMP. 3/4" 3/4" 3306 S 3306
D D AC
UZY UZLO UZLC
D
FO
AH
PDT PDI 3301 3301 3301
AO
3307 3307 IS UZO UZLO
S
8 3306 3306
PG UZC
PCV 3304 UZV 3301 UZLC
3306 3301 3306
FC
3 AH
PI MEDIAN PZY PZAL IS
3303 3303 3303 8
3 AL 2oo3
4
3
AP
3301
TYPE 4A
FL BL PG
F
PI PT 3302
3301 3301
START-UP LINE
AL
TI
3301
FT FI
3301 3301
3"-NG-3301-B24A-ET
3/4"
MINIMIZE
D
G
2"-NG-3302-B24A-ET
2"-NG-3304-B24A-ET
3/4"
2"-NI-3301-B24A-N
3"-NG-3303-B24A-ET
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
D
174
232
P07
BL
BL
.
NATURAL GAS
NATURAL GAS
NATURAL GAS
P26
P04
P32
FROM TIC-115
NAME
Heater, natural gas section
NITROGEN
P33
TO V-104
FROM BL
FROM BL
TO V-107
TO V-101
173
S-09154 P42133 1
(I)
JOB NUMBER DOCUMENT NUMBER REV
PIP4 26/09/2019 09:43:19
1 2 3 4 5 6 7 8 9 10 11 12
NOTE
T01
3 TO HP LOOP
MT 3
LZAL- LOW LEVEL IN
P04
P05
FOR P-101 A
502
MZAL FEED PUMP,
P05
P05
FEED TO FOR P-101 B
AND 503
B MZAL- FEED PUMP, REACTOR SECTION
P05
MT
P01
RE FOR RENEWABLE FEED UZV
LZAH- HIGH LEVEL IN 0101 FROM BL 0101
I-102
P04
P01
FEED FOR RENEWABLE FEED FV 2
STOP 0101 0101
FROM BL
FEED TO
D FROM BL
R
1
EXECUTION OF IS-/I-GROUPS:
TRIP OF FEED TO MT STOP AMINE
IS- IS- SAFETY INTERLOCK LOGIC EXECUTED IN
P04
T01
P05
P07
RE
T04
P07
FLOW TO HP LOOP HDO REACTOR 1, BED2 FV- 2 D ACTION DELAYED X TIME.
0504 STOP 0702 CONTROL VALVE 0702 X sec/min
R FEED TO IN ACTION MAY BE INACTIVATED .
FIC- CLOSE FEED TO CLOSE
HP LOOP
P07
HDO REACTOR 2, BED1 FV- 2
TRIP OF COMPRESSORS, 0701 CONTROL VALVE 0701 MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.
IS- MT
MANUAL ACTIVATION OF I-UNIT FROM DCS.
T03
T01
AND REACTOR SECTION R MANUAL RESET OF IS-/I-UNIT FROM DCS.
IS- TRIP OF COMPRESSORS, 1
T03
T03
BURNER TRIP, H-101
TZAH- HIGH TEMPERATURE IN 8 RL FINAL ELEMENT TO BE RESET LOCALLY
P10
T03
K-101 A AND K-102 A
TZAH- HIGH TEMPERATURE IN MT 9 BEFORE RESET OF IS-/I-UNIT.
P10
FROM BL
TZAH- HIGH SKIN TEMPERATURE IN 14
P10
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
1301 UZY- OPENING OF EMERGENCY OPEN and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
P13
S-09154 P42301 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12
NOTE
T02
AT MULTIPLE MAIN
6 BURNER FAILURE 6
5) CONTROLLER TO MANUAL WITH 0 % OUTPUT.
BZAL- FAILURE OF MAIN BURNER A, TRIP OF UZY- BLOCK NATURAL GAS CLOSE
P06
RL
P33
H-101 MAIN BURNER A TO MAIN BURNER A, H-101 UZV-
0602 3303 3303
H-101
R
2
TRIP OF
IS-
T02
MAIN BURNER A,
5A H-101
3
TRIP OF
C
IS- MAIN BURNER B, TRIP OF
5B H-101 IS-
T02
MAIN BURNER A,
AND H-101 5A
TRIP OF
MAIN BURNER B,
IS-
H-101 5B
TRIP OF
IS- MAIN BURNER "n",
5n H-101
1
FZAL- LOW RECYCLE OIL FLOW MT
P15
SHUT DOWN HS
0601 TOTAL MAIN BURNER TRIP 3301
UZY- BLOCK OF NATURAL GAS, CLOSE
H-101
P33
PZAH- HIGH PRESSURE IN HEATER TO H-101 UZV-
3305 3305
P06
P33
TZAH- HIGH PROCESS TEMPERATURE R TO H-101 UZV- AN INDEPENDENT FAIL SAFE PLC.
3302 3302
P06
OUTLET,
0608 H-101 I- INTERLOCK EXECUTED IN A REDUNDANT
H-101 REQUIREMENTS CONFIGURATED DCS/PLC.
TZAH- HIGH STACK TEMPERATURE, DETAILED BY VENDOR/EPC
P06
2oo3 H-101
0606 I-106 PIC- CLOSE NATURAL GAS CLOSE
LEGEND:
E
P33
TO MAIN BURNER PV- 5 D ACTION DELAYED X TIME.
PZAL- LOW NATURAL GAS
STOP NATURAL GAS 3308 CONTROL VALVE 3308 X sec/min
P33
2oo3 PRESSURE, IN
3308 TO MAIN BURNER, IN ACTION MAY BE INACTIVATED .
H-101
H-101 REQUIREMENTS
MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.
DETAILED BY VENDOR/EPC MT
MANUAL ACTIVATION OF I-UNIT FROM DCS.
4
R MANUAL RESET OF IS-/I-UNIT FROM DCS.
NEGATION OF INPUT.
MT
MooN M OUT OF N VOTING.
TOTAL PILOT BURNER TRIP, TOTAL PILOT BURNER TRIP
IS- IS-
IS-7A
T03
T03
P33
R
2
S-09154 P42302 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12
NOTE
A EMERGENCY
IS-
T01
DEPRESSURIZATION
4 OF HP LOOP
TRIP OF TRIP OF
IS- IS-
T02
T02
PILOT BURNER A, H-101 PILOT BURNER A, H-101
7A 7A
1
TRIP OF TRIP OF
IS- PILOT BURNER B, H-101 PILOT BURNER B, H-101
IS-
7B 7B
AND
MT
B
IS- TRIP OF IS-8 TRIP OF
IS-
PILOT BURNER "n", H-101 PILOT BURNER "n", H-101
7n TOTAL HS
7n
PILOT BURNER TRIP, 3302
HZS- HEATER EMERGENCY UZY- BLOCK OF PILOT GAS, CLOSE
H-101
P06
P33
SHUT DOWN H-101 UZV-
0601 3301 3301
RL
PZAL- LOW PILOT GAS PRESSURE, R UZY- BLEED OF PILOT GAS, OPEN
P33
P33
2oo3 H-101 IN H-101 UZV-
3303 3306 3306
EMERGENCY
IS-
T01
DEPRESSURIZATION
4 OF HP LOOP
T01
2oo3 IN HIGH PRESSURE COLD D DEPRESSURIZATION OF
1301 SEPARATOR,V-102 5 sec MT HP LOOP 4
D
LZAH- HIGH LEVEL IN RECYCLE GAS UZY- STOP MOTOR FOR
IS-9
P17
P18
2oo3 K.O. DRUM, COMPRESSORS,
1702 V-105 1801 K-101 A / K-102 A
MZAL- RECYCLE GAS COMPRESSOR, TRIP OF UZY- SHUT-OFF MAKEUP CLOSE EXECUTION OF IS-/I-GROUPS:
P18
P21
K-102 A AND MUG COMP., COMPRESSORS, HYDROGEN FROM K-101 A UZV-
1802 K-101 A NOT RUNNING 2101 TO HP SECTION 2101 IS- SAFETY INTERLOCK LOGIC EXECUTED IN
K-101 A AND K-102 A AN INDEPENDENT FAIL SAFE PLC.
HIGH LEVEL IN MAKE-UP GAS K-101 A / K-102 A
P20
K-101 A / K-102 A
LEGEND:
REQUIREMENTS
E DETAILED BY VENDOR/EPC
D ACTION DELAYED X TIME.
X sec/min
IN ACTION MAY BE INACTIVATED .
T01
2oo3 IN HIGH PRESSURE COLD D DEPRESSURIZATION OF BEFORE RESET OF IS-/I-UNIT.
1301 SEPARATOR,V-102 5 sec MT HP LOOP 4
NEGATION OF INPUT.
LZAH- HIGH LEVEL IN RECYCLE GAS UZY- STOP MOTOR FOR
IS-10
P17
P21
S-09154 P42303 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12
NOTE
MT
P13
RE DOWNSTREAM HIGH PRESS. UZV-
LZAL- LOW HYDROCARBON LEVEL 1301 COLD SEPARATOR, V-102 1301 2) CONTROLLER TO MANUAL WITH 0% OUTPUT.
I-112
P13
A 2oo3 IN HP COLD SEPARATOR, D
1301 V-102 5 sec TRIP OF HYDROCARBON LIC- CLOSE HIGH PRESSURE COLD CLOSE 3) INACTIVATION USED DURING START-UP FOR FLUSHING OF
CATALYST.
P13
LIQUID FROM HIGH PRESS. SEPARATOR HC CONTROL LV- 2
STOP HC FLOW FROM 1301 VALVE 1301A/B
COLD SEPARATOR, V-102
HIGH PRESSURE
COLD SEPARATOR, V-102
R
P13
DOWNSTREAM HIGH PRESS. UZV-
MT 1302 COLD SEPARATOR, V-102 1302
P16
T01
LZAL- LOW WATER LEVEL IN HIGH TRIP OF WATER FROM UZY- STOP WATER CIRCULATION
P13
P16
2oo3 PRESSURE COLD SEPARATOR, D HIGH PRESSURE COLD MOTOR, P-103 B LIC- CLOSE HIGH PRESSURE CLOSE
1303 V-102 5 sec 1604
P13
SEPARATOR, V-102 COLD SEPARATOR WATER LV- 2
I-113 1303 CONTROL VALVE 1303
P16
C HIGH PRESSURE CONTROL VALVE FV- 2
1601 1601
COLD SEPARATOR, V-102
MT 1
EMERGENCY
IS-
IS-14
T01
DEPRESSURIZATION
4 OF HP LOOP UZY- CLOSE SHUT-OFF VALVE CLOSE
P13
RE FOR HP BFW FROM BL UZV-
PZAL LOW HP BFW PRESSURE TRIP OF 1304 1304
P13
HP BFW
1305
FROM BL
D
R
EMERGENCY
IS-
T01
DEPRESSURIZATION
4 OF HP LOOP
EXECUTION OF IS-/I-GROUPS:
TRIP OF HYDROCARBON BLOCK RECYCLE OIL IS- SAFETY INTERLOCK LOGIC EXECUTED IN
IS- IS- AN INDEPENDENT FAIL SAFE PLC.
T04
T04
LIQUID FROM LOW PRESSURE TO HP LOOP
17 FLASH DRUM, V-103 MT 16
I- INTERLOCK EXECUTED IN A REDUNDANT
HZZAL VALVE UPSTREAM UZY- STOP RECYCLE PUMP MOTOR, CONFIGURATED DCS/PLC.
IS-15
P14
P15
2oo3 RECYCLE PUMP, P-102 A/B P-102 A
1401 CLOSING 1502 LEGEND:
E MZAL- RECYCLE PUMP, TRIP OF UZY- STOP RECYCLE PUMP MOTOR, D ACTION DELAYED X TIME.
P15
P15
P-102 A RECYCLE OIL P-102 B X sec/min
1502 NOT RUNNING 1503
AND IN ACTION MAY BE INACTIVATED .
MZAL- RECYCLE PUMP, P-102 A/B REQUIREMENTS
P15
T01
F HP LOOP
IS- TRIP OF RECYCLE OIL 3 PULSE SIGNAL TO ALLOW OPERATOR ACTION
IN
15 UZY- CLOSE SHUT-OFF VALVE CLOSE
P15
RE DOWNSTREAM RECYCLE UZV- NEGATION OF INPUT.
FZAL- LOW RECYCLE OIL FLOW BLOCK RECYCLE OIL 1501 PUMP, P-102 A/B 1501 FIC- CLOSE CONTROL VALVE CLOSE
I-116
P15
P15
2oo3 TO HP LOOP TO HP LOOP DOWNSTREAM RECYCLE PUMP FV- 2
1501 1501 P-102 A/B 1501 AND AND GATE. OR GATE.
STOP LIQUID FROM HIC- CLOSE RECYCLE OIL CONTROL CLOSE
P09
RECYCLE PUMPS, VALVE UPSTREAM HV- 2
R 0901 H-101 0901
P-102 A/B MooN M OUT OF N VOTING.
G 1
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
MT
LZAL- LOW HYDROCARBON LEVEL 15 1 Issued for package Sep 26, 2019 ABUM/JAPR EDCB OLKN
I-117
P14
2oo3 IN LOW PRESSURE FLASH D 0 First Issue Sep 6, 2019 ABUM/PMAR EDCB OLKN
1403 DRUM, V-103 5 sec TRIP OF HYDROCARBON FIC- CLOSE STRIPPER FEED CLOSE REV. DESCRIPTION DATE DRAWN CHECK APPR.
P14
LIQUID FROM LOW PESSURE CONTROL VALVE FV- 2
Seabord Energy, USA
STOP HYDROCARBON 1401 1401 HDT renewable feedstock Client Doc. No.: 32000-PID-41-0
FLASH DRUM, V-103
H FLOW FROM LOW PRESS
SHEET SIZE UNIT
FLASH DRUM, V-103
R NAME
Interlock system
Interlock diagram
T04
DOCUMENT ID
1
S-09154 P42304 1
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12
NOTE
P23
RE FOR STEAM UZV-
LZAH- HIGH LEVEL IN PRODUCT 2301 2301
I-118
P23
2oo3 STRIPPER,C-101 D
2302 5 sec TRIP OF FIC- CLOSE CONTROL VALVE CLOSE-
P23
STEAM TO PRODUCT FOR STEAM FV- 2
STOP STEAM TO 2301 2301
STRIPPER, C-101
PRODUCT STRIPPER
R
B
1
P24
PUMP MOTOR, FOR P-106 A
MT 2402
P24
C PUMP MOTOR, FOR P-106 B
LZAL- LOW LEVEL IN PRODUCT 2404
P23
2oo3 STRIPPER,C-101 D
2302 5 sec TRIP OF P-106 A/B REQUIREMENTS
LIQUID FROM DETAILED BY VENDOR/EPC
PRODUCT STRIPPER, C-101
I-119 FIC- CLOSE DIESEL PRODUCT CLOSE
P31
CONTROL VALVE TO BL FV- 2
R STOP LIQUID FROM 3101 3101
PRODUCT STRIPPER, C-101
D 1
EXECUTION OF IS-/I-GROUPS:
P28
RE AT BL UZV-
LZAL- LOW LEVEL IN 2801 2801 LEGEND:
I-120
P27
E
2oo3 NAPHTHA STABILIZER, D
2702 C-102 5 sec TRIP OF FIC- CLOSE STABILIZED NAPHTHA CLOSE D ACTION DELAYED X TIME.
X sec/min
P28
LIQUID FROM PRODUCT PRODUCT CONTROL VALVE FV- 2
STOP STABILIZER NAPHTHA 2801 2801 IN ACTION MAY BE INACTIVATED .
NAPHTHA STABILIZER, C-102
PRODUCT TO BL
MANUAL ACTIVATION OF IS-UNIT FROM ESD CONSOLE.
MT
R MANUAL ACTIVATION OF I-UNIT FROM DCS.
G R
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
and may not be used by or disclosed to third parties without written approval of Haldor Topsøe A/S.
S-09154 P42305 1
JOB NUMBER DOCUMENT NUMBER REV