1. HOT MIX ASPHALT (HMA) OVERLAY SPLICES SHALL BE USED AT; ENDS OF
HMA OVERLAY HIGHWAY SECTIONS, MAJOR INTER-
SECTIONS, OTHER LOCATIONS INDICATED IN THE PLANS,
AND WHERE ORDERED BY THE ENGINEER.
EDGE OF PAVEMENT SAW CUT THE COST OF SAWCUTTING, MILLING REBATES, TACK COAT AND CLEANING
45^ OR A.O.B.E.
PAVEMENT IN THE HMA OVERLAY SPLICE TRANSITION AREA
SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE HMA CONCRETE ITEMS.
CENTERLINE 4. SAW CUTS SHALL BE MADE SO THAT SURFACE RUNOFF IS DIRECTED TO THE
OR CROWNLINE NEW OVERLAY EXISTING PAVEMENT
EDGE OF PAVEMENT.
5. IN THE TRANSITION AREA, PAVEMENT COURSES OTHER THAN THE TOP COURSE
ALTERNATE
SHALL BE FEATHERED OUT USING TOP COURSE OR OTHER APPROPRIATE MATERIAL.
TERMINATIONS
(SEE NOTE 4) PAYMENT SHALL BE MADE UNDER THE APPROPRIATE ITEM.
PLAN
SAW CUT
TACK COAT
SECTION
METRIC STANDARD SHEET