Ground profile(C/s)

shall be included in SECTION is not


'SECTION AA' matching with
applicable
TCS-1.Kindly
reconcile

Complete Pipe is
buried in Ground as
invert level is
R.L-288.849 whereas
G.L is 290.763(G.L
is taken from
respective
P&P).Kindly revise
the drawing

1.2*2+1.2*.5+4*.125+
.300*2+2.750*2=
9600mm

2750 (i.e
(1.25+.125+.050)*2

Shall be as per
Pavement design

Min.Grade of
Value shall be
concrete shall be
specified in drawing
provided as per
exposure condition
mentioned in Clause
7.3.6 of Schedule B
and in line with
Table 14.2 of
IRC-112