Tender Notice PDF
Tender Notice PDF
0
Electricity provided by the
Project number 12201 Bulilding No. 1 NO
customer
Water provided by the
Project name Heritage NO
customer
Date of bid 27-Mar-2019 Site roll forming NO
Last date of bid 03-Apr-2019 Mobilisation date 20 - Apr - 2019
From 22 - Apr - 2019 To
GA dwawing no. GA-01 to GA-06 Structure erection 15 - May -
2019
15 - May -
From 2019 To
Drawing revision no. R0 Roofing installation
25 - May -
2019
06 - May -
From 2019 To
Nature of work Structural erection & sheeting Deck sheet
15 - May -
2019
15 - May -
Site location(complete Block No. 4 & 5, Khasra No. 1840/1028 &
Cladding installation From 2019 To
address.) 1951/1028, Jodhpur-342005, Rajasthan.
05 - Jun - 2019
Contact name Aftab Saifi Handover 10 - Jun - 2019
Contact number 80926-87595 Erector zone N,PAN INDIA
Approximate duration to
6 weeks Project add on NO
complete the project
Review [yes/no] YES Site condition GREEN FIELD
Bid Created Date 27-Mar-2019
Building/Area Information
LENGTH WIDTH CLEAR HEIGHT UNDER THE KNEE (PL.
BUILDING/AREA NAME TYPE OF BUILDING BUILDING AREA (SQM) SLOPE
(c/c-o/o) (c/c-0/0) CHECK IN GA DWG.) MTRS.
Building-01 MULTI SPAN 65.24 38 2479.12 4.0m clear from FFL to bottom 1:10
Erector Type
DESCRIPTION OF
S.NO. Erector Type UNITS Quantity REQUIREMENT RATE AMOUNT(Rs.) SPECIAL NOTES, IF ANY.
WORK
STRUCTURE
CHECKING OF
1 SUPERVISION OF ANCHOR BOLT
ANCHOR BOLTS
M.T YES
APPLICATION OF Paint Touch-up must be start immediately after unloading of structure material.Paint for
2 PAINTING
ALKYD BASE PAINT
M.T 236.974 YES touch-up will be supplied by Interarch
(SPRAY APPLIED ) TOUCH UP
AT SITE
SUPPLY OF
PREMIUM QUALITY
3 PAINTING SYNTHETIC M.T
ENAMEL PAINT
APPLIED AT SITE
APPLICATION OF Paint Touch-up must be start immediately after unloading of structure material.Paint for
EPOXY COATING touch-up will be supplied by Interarch
4 PAINTING M.T
(SPRAY APPLIED )
AT SITE
SUPPLY OF
PREMIUM QUALITY
5 PAINTING M.T
EPOXY PAINT
APPLIED AT SITE
6 STRUCTURAL ERECTION BUILT-UP M.T 187.769 YES
YES
7 STRUCTURAL ERECTION COLD FORM M.T 38.559 PRE
GALVANIZED
8 STRUCTURAL ERECTION HOT ROLL STEEL M.T 49.205 YES
9 STRUCTURAL ERECTION PIPE M.T
10 CABLE TRAY
ROOF PLAT FORM / WALKWAYS
11
WITH HAND RAILING
HEADER PIPE SYSTEM WITH
12
PAINTING MS
13 CRANE BEAM (EOT / MONO)
CRANE WALKWAY WITH HAND
14
RAIL
15 FRAMED OPENINGS YES
16 CAGE LADDER YES
17 MEZZANINE WITH HAND RAIL CHEQUERED PLATE YES
STAIRCASE WITH HANDRAIL
OFFICE / INDUSTRIAL TYPE AND
18
CHEQUERED PLATE (WITH TOE
YES
GUARD)
19 MONKEY LADDER
20 FASCIA
TOTAL STRUCTURE 275.533
SHEETING
21 ROOF SHEETING + FLASHING SINGLE-KILPPON M2
49 LOUVER (S-TYPE) M2
50 DEKSTRIP FLASHING M
51 CEMENT BOARD M2
52 FALSE CEILING M2
54 SAFETY NET M2
BIRD MESH/WELD MESH/INSECT
55 MESH(ROOF/WALL)-
(25*25*1.6/50*50*2.0/75*75*1.6MM)
56 WINDOW (ALLUMINIUM) M2
57 SLIDING DOOR M2
58 MS DOOR(POWDER COATED) M2
59 ROLLING SHUTTER M2
61 SUB GIRTS GI
62 SOFFIT SHEET
63 CANOPY YES
64 ROOF MONITOR
65 ROOF EXTENSION
TRANSVERSE MONITOR WITH
66
TIG WELDING
67 PARTITION WALL
70 FASCIA
OTHERS
71 SPECIALS, IF ANY YES
1) After building completion, Hydro testing is to be
done by erector.
2. Consider 3.5 mtr RCC column on BEW, Steel column
will start from 3.5 mtr. lvl.
3. Cut-out for lift.