bridges section mannarkkad


Progress Report of Plan Works For the month of DECEMBER 2018
Administative Sanction Present Progress Technical Sanction
% End Extension
Sl Nme of Contract Start Rem Name of
Name of project varia Agmt No Dat Granted,
No. constituency PAC Date Financi arks Contractor
No. Amount tion e if any Physical No. Amount
al

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LAC-ADS W ORK
1

SE(K)69/2018-19
MALAMPUZHA

04/.05/2019
AS Order

6101146
74 LAKH
1728/2018-

9/5/2018
LAC-ADS 2017-18 Construction of

74 lakh
No.R.D.4/3003(1)/2017 ,Koduvayur

NIL
Malampuzha Canal Bridge at malampuzha
3157/2017/7(2)Dated
80 % COMPLETED 2019 Dated
constituency( PRICE ID.2017/10631) construction,
24/01/2018 07/07/2018

EE/PL/234/2017-2018
item rate BoQ
1029123.32

04.11.2018
AS Order

10/4/2018
5785/2017-18
Kongadu

4/5/2018
LAC-ADS-MLA 2017-18 Construction of
11 lakh

11 lakh
No.R.D.2/A.D.S./315 Arjun .k,Kadambottil
2 vadassery nombarathithod Bridge in keralassery 7/2017/5(1)Dated 100 %COMPLETED Dated House,
grama panchayath(price id :2017/10864) 19/10/2017 12.2.2018

3
EE/PL/40/2018-19
2449822.98

23.07.2018

22.01.2019
LAC-Ads 2017-18 Proposed Construction AS Order

30 LAKH
Kongadu

MKD B/2018/-
30 lakh

-Keerippara Canal bridge across the No.R.D.2/A.D.S./ V.M .Asharaf


80 % COMPLETED 19/2017/10621
Knjirappuzha canal at chainage km -15/400 in 3157/2017/7(2)Date Thachampara.
Dtd 22.06.2018
kongadu panchayath (price id 2017/10621) d 6/01/2018

4
EE/P1/222/2017-2018

23.11.2018

AS Order No.
Dated 16.03.2018

22.09.18

5784/2017-18
Kongadu

23.03.18

ADS-MLA 2017-18 Cheraya -Karani thodu


30 lakh

30 lakh
R.D.2/A.D.S/3157/20 MURALIDHARAN.K,k
Reconstruction in kongadu Constituency(price 17/7(1) Dated 100 %COMPLETED dated ongadu ,palakkadu
id:2017/10865) 08/01/2018 12.02.2018
-2-

KIIFB WORKS
1

EE/PL/123/2017-18
item rate BoQ

764224.00
12/4/2017
720885

3/3/2018
NIL investigation completed,Bill 2747/2016-17 ULCCS Ltd,
submitted dated 9.02.17
KIIFB 2016-17 - Construction of bridge

Kongadu
across chooriyodu river at AS - G.O (Rt)No.

1500 L
EZHUTHUMPARA connecting 1496/2016/PWD
kundukandam to arappara in krakurssi Dated 31/10/2016
panachayath -palakkad district
ESTIMATE submitted for 7.23
crore AND DPR SUBMITED (price
id 2018/7617)

2
Order No.
investigation price id 2016/8758 PKD/2016-
2017/2016/87
Kongadu

1000 laks
KIIFB 2016-17 - Construction of Bridge AS - G.O (Rt)No.
58
Across Bharathapuzha at km 1/400 of 1496/2016/PWD
parali -kottayi road in Odannur Dated 31/10/2016
DPR AND ESTIMATE for 12.85
crore SUBMITTD (price id
2018/5375)

3
investigation completed

Construction of bridge across kalpathy


kongadu

2000 laks

river at km 2/710 KAMBA AS - G.O (Rt)No.


1496/2016/PWD
CHALIKKADAVU BRIDGE in palakkad Dated 31/10/2016 DPR submitted to KIIFB.TAR

11.03 CR
district. correction are done .jointly
inspection are completed with
kiffb representative on
23/05/2018( price id 2018/157)

4
EE/PL/44/2018-19
item rate BoQ

ULCCS
511248

5352/2017- Ltd,No:10957,Madappall

550000
KIIFB 2016-17 - Construction of Bridge AS - G.O (Rt)No. investigation completed 18, Dated y College
Kongadu

1000 L

at Parali At KM 12/000 Of palakkad 1635/2017/PWD 03/01/2018 (p.o),Vatakara


-Ponnani Road in palakkad Dated 02/11/2017 ,Kozhikkode
districty(price id:2017/10397) for 1000 Lakhs

Report submitted to Design wing

5
ESTEEM DEVELOPERS
investigation completed (P)LTD,2^ND FLOOR
,METRO PALACE,KOCHI-
18,
MALAMPUZHA

AS - G.O (Rt)No.
1000 L

KIIFB 2016-17 - Construction of Bridge 1496/2016/PWD


at Malampuzha Ring Road Dated 31/10/2016
for 1000 Lakhs
DPR Prepared,forest clerance
and noc of irrigation yet not
sanctioned( price id 2016/8766)
-3-

139/EE/6/17-18 Dated
16.03.2017

25.03.2017
Esteem Developers

557500
investigation completed (p)LTD,2 nd Floor,Metro

MALAMPUZHA
palace kochi -18
KIIFB 2016-17 - Construction of Bridge Go(Rt)No

1000 L
at Para Mannukad Panampully 1502/2016/PWD
Road(price id. 2016/8765) Dated 1.11.2016

Estimate and Dpr


submitted.estimated amount is
10.535 cr

7
KIIFB 17-18 Construction of bridge

MALAMPUZHA
parallel to aquaduct in kannanm TS got for the investigation
koodam raod across sokanasini river in estimate for 5.7 Lakh
kodumbu ..tendering progressed price id
gramapanchayath(investigation price 2018/2436
id,2018/2836)

BUDGET WORK
Nme of constituency

Administative Sanction Present Progress Technical Sanction


% End Extension
Sl Contract Start Rem Name of
Name of project varia Agmt No Dat Granted,
No. PAC Date arks Contractor
tion e if any
Financi
No. Amount Physical No. Amount
al

ULCCS

27.02.2018
CE/R&B/PKD/
item Ltd,No:10957,Madappall
413,407

GO(Rt)No 1930/2015 EE/PL/12/ Investigation completed.price id PRICE/2016/8 4.2

NIL
1 600 L rate y College

11/28/2017
PWD Dt 22.12.2015 2017-18 2016/8780 780 Dated LAKH
BoQ (p.o),Vatakara
28.03.2017
,Kozhikkode
mannarkkad

Budget 2015-16Construction of Bridge at


Thorapuram across nellipuzha at km 1/100 of
mannarkkad thorapuram smasanam road
mannarkkad thalukk palakkad DT

estimated submitted for TS For


6 crore . Price id 2018/11013
mannarkkad

Budge 2018-19t onstruction of bridge across


Budget 2018-19 vol .2 Estimate submitted for AS of
velliyar river at km1/950 Alanallur
2 SL No.5826(page 720 L price id 2017/1548 of amount
Kannamkundu kodiyamkunnu road in palakkad
no:237) 9.978 cr
districto( price id,2017/6868)
mannarkkad

CE/R&B/GL/Invs/
Chettikkadu Ambazhakkodu bridge construction investigation report submitted on
3 2013 - 14 Dated 5.2L
across Ariyoor Thodu 23/03/2015 to ce design wing.
07/08/2013
-4-

EE/PL/99/

mannarkkad
Ruby Soft Tech ,De

12/4/2017
Constuction of bridge across kallumpotti thodu 2016 Investigation completed Report

392,686

4.80%
novo Garden ,T.C
4 at thathengalam in thenkara grama panchayath in Dated submitted to design wing.,bill 3.747 L

12/13/2016
14/473(3),palayam vikas
palakkad dt 09/12/201 submitted to axe
bavan po,thrivandrum
mannarkkad 6

Ruby Soft Tech ,De

4/12/2016
Construction of Bridge across bhavani river at INVESTIGATION-AS EE/PL/98/ Investigation completed Report

512,912
4.89186 novo Garden ,T.C
5 CHEERAKKADAVU In thavalam -mully road GO(Rt)NO241/2014/P 2016-17 submitted to design wing.,bill
L 14/473(3),palayam vikas
in palakakd DT WD Dated 17/02/2014 Dt 9/12/16 submitted to axe

13.12.16
bavan po,thrivandrum
mannarkkad

Construction of bridge across pottithodu at Ruby Soft Tech ,De

21.04.17
EE/PL/107

435,434

4.75%
KARIMBANKUNNU THANIKKALATTY in CE/R&B/GL/Invs/ Investigation completed Report 4.15688 novo Garden ,T.C
6 /16-17 Dt
mannarkkad -Thathengalam road in palakkad PKD/1123/2014-2015 submitted to design wing L 14/473(3),palayam vikas
21/12/16

22.12.16
district bavan po,thrivandrum

3.6 lakh
for
Jamshad
Malampuzha

investiga Investigations are completed

30.10.18
BUDGET 2018-19 Hanging Bridge Across item Nasari,P.K,Payyanil
337,909

PKD/2018/2435 Dt taion EE/PL/48/ report hand over to SIILK as per 1782/2018-19


7 Sokanasini River at Kodumbu Grama rate 3.6 L House
4/07/18 100 lakh 2018*19 as Go(Rt)1234/2018 /PWD/ Dt 17.07.2018
Panchayath in palakkad Dis(price id 2018/2435) BoQ ,Pathinipparamba ,Down

9/1/2018
budget Dated 07/08/2018
Hill (p.o),Malappuram
provisio
n