Change of Nomenclature required works under Sub-division, Tirur

Sl Amount Amount
Name of work FS/AS order No Constituency Modified work Constituency Remarks
No in Lakhs in Lakhs

SLTF 2019-20 (1st List)

Lot of potholes and surface damages formed


SLTF 2019-20-Flood Damage work - Urgent AS/59C/19/660 Dated SLTF 2019-20-Flood Damage work - after the torrential rain and flooding in this
1 surface rectification between Km. 3/000 and 26/09/2019 3.00 TANUR LAC Urgent surface rectification between 3 Tanur stretch.The work could be carried out from Ch.
Km. 8/000 of Tirur-Malappuram road in Tanur (SLTF 1st List, Sl NO:4) (Sl NO:4) Km. 3/000 and Km. 4/500 of Tirur- 3/000 to 4/500 only with this current AS
LAC Malappuram road in Tanur LAC Amount. Balance work in the chainage 4/500-
8/000 shall be proposed in next SLTF.

A work with BC renewal for an amont of RS. 70


lakhs was proposed between Ch. 0/000 and
3/060 of Tanur - Theyyala road. However,to
make the road pothole free, patch work was
also proposed for 1.50 lakhs (During the
SLTF 2019-20-Flood Damage work - Urgent SLTF 2019-20-Flood Damage work -
proposal for Patch work, BC renewal work was
2 surface rectification between Km. 0/000 and SLTF (1st List, Sl NO:3) 1.50 TANUR LAC Urgent surface rectification between 1.50 Tanur not sanctioned). In the mean time, Sanction for
Km. 3/060 of Tanur-Theyyala road in Tanur (Sl NO:3) Km. 4/500 and Km. 6/000 of Tirur-
the proposed BC renewal for 70.00 lakhs has
LAC Malappuram road in Tanur LAC
received. Hence patch work is not required in
the same chainage of BC work. Instead, a new
work for the patch repair on tirur Malappuram
road B/w Km. 4/500 and Km. 6/000 is
proposed.

7 lakhs were sanctioned to the road for patch


repair, but found that provisions of filling up of
pot holes provided in estimate is not sufficeint
to repair the whole reach of road ,hence as per
SLTF 2019-20-Flood Damage work - direction from Kondotty MLA working chainage
SLTF 2019-20-Flood Damage work - Urgent BT As no :
Urgent BT patch repairs to Vettukad- of repair work is limitted to arrange an
patch repairs to Vettukad-Olavattur- AS/59C/19/543Dated:25- KONDOTTY LAC
3 7.00 Olavattur-Mundumuzhi road between 7.00 Kondotty additional work in mundumuzhy reach of road
Mundumuzhi road between Km. 0/000 and 09-2019 SLTF (1st List, Sl (Sl NO:2)
Km. 1/200 and Km.7/470 in Kondotty vide letter no 97/2019 dtd 09/10/2019 .from
Km.7/820 in Kondotty LAC NO:2)
LAC 0/000 to 0/600 SLTf bm bc was pending at
tender stage in long time later it awarded and
comleted, And from 0/600 to 1/200 another
SLTF BMBC work is sanctioned in SLTF 2nd list
of 2019-20 for RS. 25.00 L
Change of Nomenclature required works under Sub-division, Tirur
Sl Amount Amount
Name of work FS/AS order No Constituency Modified work Constituency Remarks
No in Lakhs in Lakhs

A work were sanctioned Mangattumuri-


Cherumittam-Valiyaparambu road between
Km. 0/6000 and Km.3/240 by including SLTF
2018 list .Work were awarded to contrctor but
SLTF 2019-20-Flood Damage work - Urgent BT bitumen not supplied on time . Hence
patch repairs and stripped BT works to SLTF 2019-20 : Urgent Protection Works execution of work is delayed and completed in
KONDOTTY LAC
4 Mangattumuri-Cherumittam-Valiyaparambu SLTF (1st List, Sl NO:9) 6.00 to Pengad Alungal road between 3/000 6.00 Kondotty this finanacial year .Due to DLP of the
(Sl NO:9)
road between Km. 0/800 and Km.3/240 in and 5/970 in Kontotty LAC completed work road work in this reach is not
Kondotty LAC needed .Complaints are often sent by peoples
to minister for construction of side wall in
Pengad Alungal road ,Hence by considering the
necessity of safety and road protection , the
protection work is proposed as a replacement.

SLTF 2019-20 (3rd List)

The work was proposed for drain b/w KM


1/500 and 2/300. A work was completes till
SLTF 2019-20 - Construction of drain to 0/700. Many request were made later by local
SLTF 2019-20 - Construction of drain to avoid
TIRUR LAC avoid flooding between Km 0/700 to authorities and peoples nearby to extend the
1 flooding between Km 1/500 to 2/300 of B.p. SLTF (3rd List, Sl NO:10) 25.00 25.00 Tirur
(Sl NO:10) 1/500 of B.p. Angadi - Mangattiri - drain from 0/700 to 1/500. On detailed
Angadi - Mangattiri - Vettom road in Tirur LAC.
Vettom road in Tirur LAC. inspection the necessity of drain was found
important and hence change in nomenclature
proposed.

Proposal was made for construction of


retaining wall for some stretches in between
7/000 to 8/450. But due to heavy rains &
SLTF 2019-20 - Construction of Side flooding, many of the road side protection got
SLTF 2019-20 - Construction of Side protection
TIRUR LAC protection wall and drain on weeken and was found necessary to build new
2 wall and drain on Patternadakkavu-Ezhur road SLTF (3rd List, Sl NO:1) 10.00 10.00 Tirur
(Sl NO:1) Patternadakkavu-Ezhur road b/w KM retaining walls, with this AS, works upto KM
b/w KM 7/000 and 8/450 in Tirur LAC.
7/000 and 8/000 in Tirur LAC. 8/000 can only be completed. A separate
proposal was made for retaining wall
construction in between KM 8/000 - 8/450
from next SLTF.

Hon.Vallikunnu Mla Sri.Abdul Hameed Master


SLTF 2019-20: Improvements and Bc
SLTF 2019-20: Improvement works between directed to arrange works to those reaches
3 Km. 2/950 and Km. 3/350 of Kottappuram - SLTF (3rd List, Sl NO:11) 25.00 VALLIKKUNNU LAC renewal works to Kottappuram - 25.00 Vallikunnu which having more damages comparatively ,
(Sl No :11) Kakancheri road between km 4/300 and
Kakancheri road of Vallikunnu LAC vide letter MLA/VLKN/413/19 dtd 12/12/19.
5/300 of Vallikunnu LAC
Hence change in chainge proposed.
Change of Nomenclature required works under Sub-division, Tirur
Sl Amount Amount
Name of work FS/AS order No Constituency Modified work Constituency Remarks
No in Lakhs in Lakhs

Hon.Vallikunnu Mla Sri.Abdul Hameed Master


SLTF 2019-20: Improvement works between SLTF 2019-20: Improvements and Bc
directed to arrange works to those reaches
Km. 0/000 and 0/500 of Diversion road VALLIKUNNU LAC renewal works Diversion road Kondotty
4 SLTF (3rd List, Sl NO:13) 25.00 25.00 Vallikunnu which having more damages comparatively ,
Kondoffy Tirurangadi (Route II) road in (Sl No :13) Tirurangadi (Route II) road between km
vide letter MLA/VLKN/413/19 dtd 12/12/19.
Vallikunnu LAC 1/050 and 2/050 in Vallikunnu LAC
Hence change in chainge proposed.

By considering the urgency and bad condition


SLTF 2019-20 : improvements and
of road, Hon.Kondotty MLA Sri.TV Ibrahim
SLTF 2019-20 : Reconstruction of damaged Providing BM and BC Works between
KONDOTTY LAC directed to arrange road works in
5 culvert at km 6/650 of valillapuzha elamaram SLTF (3rd List, Sl NO:1) 25.00 km 7/470 and 7/820 of Vettukad 25.00 Kondotty
(Sl No :1) mundumuzhi reach of Vettukad-Olavattur-
erattamuzhi road in kondotty lac -Olavattoor -Mundumuzhy road in
Mundumuzhi road vide letter no 97/2019 dtd
kondotty lac
09/10/2019 .

SLTF 2019-20 - Construction of CC drain


SLTF 2019-20 - Construction of CC drain at
at Pandikashala in between Km. 5/900
Pandikashala in between Km. 5/400 and Km. VENGARA LAC Correction in chainage is required to get
6 SLTF (3rd List, Sl NO:7) 20 and Km. 6/650 Vengara - Kooriyad road. 20 Vengara
6/000 Vengara - Kooriyad road. in Vengara LAC (Sl No :7) proper outlet for the drain.
in Vengara LAC

SLTF 20I9-20 - providing CC drain and


reconstruction of culvert at
11.5 Tirurangadi
Pandimuttam at Km 7/750 in Trikkulam
SLTF 20I9-2A - Providing berm protection, -Thelyala road Sanctioned culvert at KM 7/750 could be
drainage facilities and reconstruction of culvert TIRURANGADI LAC constructed with an amount of 11.5Lakhs.
7 SLTF (3rd List, Sl NO:7) 25
at Pandimuttam at Km 7/750 in Trikkulam (Sl No :7) With balance amount (25-11.5=13.5 Lakhs) a
-Thelyala road drainage on the adjacent road.
SLTF 20I9-20 - providing CC drainage
facilities in Veniyoor paramba-Tanur 13.5 Tirurangadi
road between km 5/890 to 6/140