CIVIL WEEKLY MEETING @12-10-2023

Extra
COMPLETION REVISED Manpower Mateial Mateial CONTRACTOR
S.No. STRUCTURE ACTION BY STATUS Manpower REMARKS
DATE DATE Available Avialble Required NAME
Required
Cable trench seepage
1 arresting and cleaning 11/25/2023 Mr.Bubendar Cleaning work in progress 10
work at Unit -3

RR Wall:

1. RR wall Grid B : 310 Rmt completed out of 400 Rmt - Balance


area work in progress.
2. RR wall Grid C: 305 RMT completed out of 400 Rmt - ash filling ravikant singh,
Coal Shed - RR Wall 8/15/2023 10/15/2023 work in progress. 115 nil motisingh,
padmini rane,
3. RR wall Grid A : 275 RMT completed out of 400 Rmt. Balance sushila
area work in progress bharadwaj ,
sanjay kumar
jaishal,uttra
1 Mr.Prusty kumar , Ishwari
Jaiswal , Puspa
Column: Khunte, Nirmal
Grid A : 10 to 14 - Banjera, indu
completed upto 13 mtr, balance area work in progress. Construction,
sima panik,
Coal Shed - Column 8/15/2023 10/20/2023 48 nil Bharat Patal,
giridhari lal
Grid B & C 11 to14: completed up to 11.00 mtr. Balance area
column shuttering and steel work in progress.

Sushila
Quarters 4th Priorty - bharadwaj,MK
7/30/2023 10/30/2023 Sup-24,25: Internal and external plastering work is in progress. 48 nil
( Sup-24 ,25) Const, pushpa
jaiswal

Guest House - 46 11/30/2023 First floor Block work in progress 16 nil SB Construction
Mr.Joel
Deputy Manager
30-02-2024 Plinth beam completed. Ground floor column in progress 15 nil Karim
Quarters - 44
Deputy Manager
30-02-2024 Backfilling completed. Brickwork started for plinth beam. 8 Karim
Quarters - 40
2
SUPERVISOR Tejas
3/5/2024 Footing completed. Pedestal column work in progress 13
QUARTERS - 21 construction
COMPLETION
STRUCTURE NO'S START DATE
DATE
DEPUTY MANAGER 1 10/1/2023 2/28/2024

SUPERVISOR
Balance Quarters -Schedule
QUARTERS - 17 No's

Phase 1 6 10/1/2023 2/28/2024


Phase 2 6 11/1/2023 3/30/2024
phase 3 5 11/15/2023 3/14/2024

Ashpond -1 (Decanting after ash evacuation - 80


3 80 days Ash Evacuation work in progress
well) days for completion

date revised - delay


Ashpond -2B Mr.Lavkush
4 10/12/2023 10/30/2023 2nd lift completed. 3rd lift reinforcement work in progress 7 M/s . Banwari because of 14 days
(Decanting well) singh
continuous rain
CIVIL WEEKLY MEETING @12-10-2023
Extra
COMPLETION REVISED Manpower Mateial Mateial CONTRACTOR
S.No. STRUCTURE ACTION BY STATUS Manpower REMARKS
DATE DATE Available Avialble Required NAME
Required
date revised - delay
Ashpond -2B (Ash Mr.Lavkush
5 10/16/2023 11/5/2023 2nd concrete completed. 3rd lift steel work in progress 6 M/s.S.N.Metha because of 14 days
Recovery Sump) singh
continuous rain

Ash pond 1 to Ash pond Mr.Brajesh


6 11/5/2023 Bottom ash filling for Road work
3 road Pandey

Bottom Ash used for


Mr.Brajesh 16200 ton bottom ash used 15700
Road work
Pandey
7
Mr.Pravesh
Fly Ash used for singh 810 ton 780
concrete and bricks

Railway siding works 1.


Drawing for all box ROB, RUB - received
culvert 10/20/2023 RCC Infra Box culvert 15 out of 32 - GAD Drawing received
CAD Drawing schedule attached
8
2. Road Diversion work
Mr.Brajesh
11/5/2023 Road diversion work for ROB is started from 05-10-2023 5
Pandey

Total 314
COAL SHED - RR BALANCE WORK SCHEDULE
S.No Description of work Duration Start Date Finish Date Remarks

COAL SHED - RR WORK 46 days 01-02-2023 18-03-2023

RR WALL WORK 31 days 01-02-2023 03-03-2023


RR Wall-Grid-A -1 to 13C,Level-252.5Mtr to 254.0Mtr 31 days 01-02-2023 03-03-2023
RR WALL WORK 0Mtr to +3Mtr 31 days 01-02-2023 03-03-2023

RR Masonry 36 days 10-02-2023 17-03-2023


Stone Shifting 23 days 10-02-2023 04-03-2023
Layer 1 - 0.9M 26 days 20-02-2023 17-03-2023
Layer 2 - 0.9M 14 days 12-02-2023 25-02-2023
Layer 3 - 0.9M 11 days 12-02-2023 22-02-2023
RR WALL TIE BEAM - 0.3Mtr 11 days 13-02-2023 23-02-2023
Reinforcement 11 days 14-02-2023 24-02-2023
Shuttering 11 days 15-02-2023 25-02-2023
Stagging 24 days 11-02-2023 06-03-2023
RCC M30 24 days 11-02-2023 06-03-2023
Deshuttering 26 days 21-02-2023 18-03-2023
BACK FILLING INSIDE 14 days 13-02-2023 26-02-2023
1st Layer 14 days 13-02-2023 26-02-2023
Water Compaction 11 days 13-02-2023 23-02-2023
Cement Concrete 11 days 14-02-2023 24-02-2023
2nd Layer 11 days 15-02-2023 25-02-2023
Water Compaction 15 days 13-02-2023 27-02-2023
Cement Concrete 15 days 13-02-2023 27-02-2023

Page 3 of 100
CIVIL DEPARTMENT - INCHARGE OF WORKS

S.No Name of Structure Engineer-In-Charge Contact No. Site-In-charge

1 Ash Pond - 03 Lavkush Singh 7409428467


Brajesh Kumar Pandey
(9575303376)
2 Ash Pond - 04 Ajay Kumar 7770997728
Ash Water Recovery System - Decanting well
3 Nil Nil
& Pump House
4 Raw water Reservoir (Outside) Rajesh Kumar 8435000179
Gunasekaran
(8435001040)
5 Resrvoir Pump House Durodhan Bhowmik 7772081598

6 Coal Tranformation Road Alexander Dang 9575303388

7 Roads at Residential Quartes Dhaneshwar Prasad Yadav 7566801100 Brajesh Kumar Pandey
(9575303376)
8 Inplant Road
Sudipta Kumar Banerjee 7770997728
9 Storm water Drain
Marirajan
10 Coal Shed Pradyumna Kumar Prusty 8435000368
(9698126123)
11 Coal Shed Tail Pully Room
P K Sinha
12 Stacker Reclaimer Niranjan Kumar 7008258229
(9406035816)
13 Coal Pile Run off Pit
8171928012 Marirajan
14 TG Pending works Kishore Kumar Bahuguna
(9698126123)
P K Sinha
15 Wagon Tippler Mantu Gorai
(9406035816)

16 Quarters - Phase 1 (1st Priority - 8 Blocks)

17 Quarters - Phase 1 (2nd Priority - 8 Blocks) Kishore Kumar Bahuguna 9669714125


Vimal V
(7089397929)
18 Quarters - Phase 1 (3rd Priority - 8 Blocks)

19 Residential Quarters 24 Blocks Nil


20 Truck Tippler Nil Nil
21 Coal Lab Nil Nil
Concrete Programme for december month -2022
Road Works( Mr.Pandey)
Family Coal Shed Wagon tippler Quaters PUMP HOUSE Brick Plant
Total Qty
Date Inplant Road Coal Road quarters ( Mr. Prustry) ( Mr.Sinha) ( Mr.Vimal) ( Mr.Guna (mani)
Road
11/25/2022 120.00 30.00 150
11/26/2022 120.00 30.00 52.53 203
11/27/2022 33.00 33
11/28/2022 120.00 24.00 30.00 127.00 301
11/29/2022 120.00 20.00 30.00 170
11/30/2022 132.00 30.00 162
12/1/2022 120.00 80.00 30.00 230
12/2/2022 100.00 80.00 30.00 30.00 240
12/3/2022 100.00 80.00 20.00 30.00 230
12/4/2022 83.00 83
12/5/2022 80.00 80.00 30.00 30.00 48.69 269
12/6/2022 80.00 80.00 20.00 30.00 210
12/7/2022 70.00 80.00 30.00 30.00 210
12/8/2022 70.00 80.00 30.00 30.00 210
12/9/2022 70.00 60.00 20.00 30.00 180
12/10/2022 80.00 60.00 24.00 30.00 194
12/11/2022 0
12/12/2022 70.00 60.00 30.00 30.00 66.00 256
12/13/2022 80.00 60.00 20.00 30.00 190
12/14/2022 70.00 60.00 20.00 30.00 180
12/15/2022 70.00 60.00 30.00 30.00 27.78 218
12/16/2022 80.00 50.00 40.00 30.00 200
12/17/2022 80.00 60.00 40.00 30.00 210
12/18/2022 0
12/19/2022 80.00 70.00 70.00 30.00 250
12/20/2022 70.00 60.00 60.00 30.00 220
12/21/2022 80.00 60.00 60.00 30.00 100.00 330
12/22/2022 80.00 60.00 20.00 30.00 27.78 218
12/23/2022 80.00 60.00 40.00 30.00 27.78 238
12/24/2022 80.00 60.00 30.00 30.00 200
12/25/2022 80.00 60.00 40.00 30.00 75.00 27.78 313
12/26/2022 0
12/27/2022 90.00 60.00 30.00 30.00 34.72 245
12/28/2022 80.00 60.00 24.00 30.00 34.72 229
12/29/2022 80.00 60.00 20.00 30.00 34.72 225
12/30/2022 70.00 60.00 24.00 30.00 60.00 34.72 279
12/31/2022 80.00 60.00 30.00 30.00 200
Total Qty 2782.00 1760.00 876.00 960.00 544.00 0.00 351.23 7273

1251.90 792.00 394.20 405.12 229.57 0.00 148.22 200.00 3421


Concrete Done
Remarks
actual

185
152
Sunday
221
152
195
150
139
201
Sunday
153
180
213
164
154
226
Sunday
193
177

Sunday
2853 0

1203.86
ASH POND - 03 (16 Acre) Site Engineer : Ajay Kumar
Constrains Ash to be evacuated
Action by Mr.Kalaiselvan/Mr.Irfan
Qty
S.No Description of work Unit
Estimated Qty Completed Balance
ASH POND - 03
1 HDPE Laying work Sqm 7,500.00 7,500.00
2 Reinforcement Steel MT 15.75 15.75
3 Shuttering Bgl Sqm 450.00 450.00
4 RCC Tie Beam - M20 Cum 67.50 67.50
5 Brick work 115mm thk Sqm 7,500.00 7,500.00
Overall

Schedule
Status: Pond is being evacuated of ash, expected to be complete by 16-06-2022 Work to resume thereafter
Updated Schedule
S.No Description of work Unit Qty Duration Start Date End Date Remarks

ASH POND - 03
1 HDPE Laying work Sqm 7500
2 Reinforcement Steel MT 15.75 Ash evacuation is in
3 Shuttering Bgl Sqm 900 progress
4 RCC Tie Beam - M20 Cum 67.5
5 Brick work 115mm thk Sqm 7500
ASH POND - 04 Site Engineer : Rajesh Kumar
Constrains Ash to be evacuated
Action by Mr.Kalaiselvan/Mr.Irfan
Qty
S.No Description of work Unit Estimated
Completed Balance
Qty % Of Completion % of Balance
ASH POND - 04
1 HDPE Film for Ash Pond Sqm 38,298.99 - 38,298.99 0% 100%
2 Steel reinforcement MT 8.00 8.00 0% 100%
3 Shuttering - Bgl Sqm 2,919.60 2,919.60 0% 100%
4 RCC M20 Cum 657.11 657.11 0% 100%
5 Brickwork 115 mm thk Sqm 11,900.00 11,900.00 0% 100%
Overall 0% 100%
SCHEDULE
Status: Pond is using for ash deposit, expected to be complete byWork to resume thereafter

S.No Description of work Unit Balance Duration Start Date Finish Date Remarks
ASH POND - 04 0 12/30/1899 12/30/1899

1 HDPE Laying work Sqm 38,298.99 15

2 Steel reinforcement MT 8.00 18


Balance work will be teken
3 Shuttering - Bgl Sqm 2,919.60 25 up after ash evacuation

4 RCC Tie Beam Rmt 657.11 30

5 Brick work 115mm thk Sqm 11,900.00 70


Concrete Programme for december month -2022
Road Works( Mr.Pandey)
Family Coal Shed Wagon tippler Quaters PUMP HOUSE Brick Plant
Total Qty
Date Inplant Road Coal Road quarters ( Mr. Prustry) ( Mr.Sinha) ( Mr.Vimal) ( Mr.Guna (mani)
Road
11/25/2022 120.00 30.00 150
11/26/2022 120.00 30.00 52.53 203
11/27/2022 33.00 33
11/28/2022 120.00 24.00 30.00 127.00 301
11/29/2022 120.00 20.00 30.00 170
11/30/2022 132.00 30.00 162
12/1/2022 120.00 80.00 30.00 230
12/2/2022 100.00 80.00 30.00 30.00 240
12/3/2022 100.00 80.00 20.00 30.00 230
12/4/2022 83.00 83
12/5/2022 80.00 80.00 30.00 30.00 48.69 269
12/6/2022 80.00 80.00 20.00 30.00 210
12/7/2022 70.00 80.00 30.00 30.00 210
12/8/2022 70.00 80.00 30.00 30.00 210
12/9/2022 70.00 60.00 20.00 30.00 180
12/10/2022 80.00 60.00 24.00 30.00 194
12/11/2022 0
12/12/2022 70.00 60.00 30.00 30.00 66.00 256
12/13/2022 80.00 60.00 20.00 30.00 190
12/14/2022 70.00 60.00 20.00 30.00 180
12/15/2022 70.00 60.00 30.00 30.00 27.78 218
12/16/2022 80.00 50.00 40.00 30.00 200
12/17/2022 80.00 60.00 40.00 30.00 210
12/18/2022 0
12/19/2022 80.00 70.00 70.00 30.00 250
12/20/2022 70.00 60.00 60.00 30.00 220
12/21/2022 80.00 60.00 60.00 30.00 100.00 330
12/22/2022 80.00 60.00 20.00 30.00 27.78 218
12/23/2022 80.00 60.00 40.00 30.00 27.78 238
12/24/2022 80.00 60.00 30.00 30.00 200
12/25/2022 80.00 60.00 40.00 30.00 75.00 27.78 313
12/26/2022 0
12/27/2022 90.00 60.00 30.00 30.00 34.72 245
12/28/2022 80.00 60.00 24.00 30.00 34.72 229
12/29/2022 80.00 60.00 20.00 30.00 34.72 225
12/30/2022 70.00 60.00 24.00 30.00 60.00 34.72 279
12/31/2022 80.00 60.00 30.00 30.00 200
Total Qty 2782.00 1760.00 876.00 960.00 544.00 0.00 351.23 7273

1251.90 792.00 394.20 405.12 229.57 0.00 148.22 200.00 3421


Concrete Done
Remarks
actual

185
152
Sunday
221
152
195
150
139
201
Sunday
153
180

Sunday

Sunday
1726 0

728.48
ASH POND - 03 (16 Acre) Site Engineer : Ajay Kumar
Constrains Ash to be evacuated
Action by Mr.Kalaiselvan/Mr.Irfan
Qty
S.No Description of work Unit
Estimated Qty Completed Balance
ASH POND - 03
1 HDPE Laying work Sqm 7,500.00 7,500.00
2 Reinforcement Steel MT 15.75 15.75
3 Shuttering Bgl Sqm 450.00 450.00
4 RCC Tie Beam - M20 Cum 67.50 67.50
5 Brick work 115mm thk Sqm 7,500.00 7,500.00
Overall

Schedule
Status: Pond is being evacuated of ash,
Updated Schedule
S.No Description of work Unit Qty Duration Start Date End Date Remarks

ASH POND - 03
1 HDPE Laying work Sqm 7500
2 Reinforcement Steel MT 15.75 Ash evacuation is in
3 Shuttering Bgl Sqm 900 progress
4 RCC Tie Beam - M20 Cum 67.5
5 Brick work 115mm thk Sqm 7500
RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Reservoir Pump House 107 days 12/5/2022 3/21/2023
Below Ground Level 53 days 12/5/2022 1/26/2023

Infront of Trash Gate Bottom Raft 6 days 12/6/2022 12/11/2022


PCC 1:4:8 Cum 15.651 2 days 12/6/2022 12/7/2022
Reinforcement work MT 5.6 2 days 12/8/2022 12/9/2022
Shuttering work - BGL Sqm 33.007 1 day 12/9/2022 12/9/2022
RCC M30 Cum 48.692 1 day 12/10/2022 12/10/2022
Deshuttering Sqm 33.007 1 day 12/11/2022 12/11/2022

RCC Wall-110m (12m length-6Nos, 16m


43 days 12/5/2022 1/16/2023
length-2Nos & 3m length-2Nos)
Lift - 01 - 2.44 Mtr depth 12 days 12/5/2022 12/16/2022
Stretch - 01 5 days 12/5/2022 12/9/2022
Reinforcement work MT 5.095 1 day 12/5/2022 12/5/2022
Shuttering work - BGL Sqm 108.252 2 days 12/6/2022 12/7/2022
RCC M30 Cum 27.779 1 day 12/8/2022 12/8/2022
Deshuttering Sqm 108.252 1 day 12/9/2022 12/9/2022
Stretch - 02 7 days 12/10/2022 12/16/2022
Reinforcement work MT 5.095 2 days 12/10/2022 12/11/2022
Shuttering work - BGL Sqm 108.252 3 days 12/12/2022 12/14/2022
RCC M30 Cum 27.779 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 108.252 1 day 12/16/2022 12/16/2022
Stretch - 03 5 days 12/5/2022 12/9/2022
Reinforcement work MT 5.095 1 day 12/5/2022 12/5/2022
Shuttering work - BGL Sqm 108.252 2 days 12/6/2022 12/7/2022
RCC M30 Cum 27.779 1 day 12/8/2022 12/8/2022
Deshuttering Sqm 108.252 1 day 12/9/2022 12/9/2022
Stretch - 04 7 days 12/10/2022 12/16/2022
Reinforcement work MT 5.095 2 days 12/10/2022 12/11/2022
Shuttering work - BGL Sqm 108.252 3 days 12/12/2022 12/14/2022
RCC M30 Cum 27.779 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 108.252 1 day 12/16/2022 12/16/2022
Stretch - 05 5 days 12/5/2022 12/9/2022
Reinforcement work MT 5.095 1 day 12/5/2022 12/5/2022
Shuttering work - BGL Sqm 108.252 2 days 12/6/2022 12/7/2022
RCC M30 Cum 27.779 1 day 12/8/2022 12/8/2022
Deshuttering Sqm 108.252 1 day 12/9/2022 12/9/2022

Lift - 02 - 2.34 Mtr depth 14 days 12/10/2022 12/23/2022


Stretch - 01 7 days 12/10/2022 12/16/2022
Reinforcement work MT 4.886 2 days 12/10/2022 12/11/2022
Shuttering work - BGL Sqm 103.815 3 days 12/12/2022 12/14/2022
RCC M30 Cum 26.641 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 103.815 1 day 12/16/2022 12/16/2022
Stretch - 02 7 days 12/17/2022 12/23/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 3 days 12/19/2022 12/21/2022
RCC M30 Cum 26.641 1 day 12/22/2022 12/22/2022
Deshuttering Sqm 103.815 1 day 12/23/2022 12/23/2022
Stretch - 03 7 days 12/10/2022 12/16/2022

Reservoir Pump House Page 16 of 100


RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Reinforcement work MT 4.886 2 days 12/10/2022 12/11/2022
Shuttering work - BGL Sqm 103.815 3 days 12/12/2022 12/14/2022
RCC M30 Cum 26.641 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 103.815 1 day 12/16/2022 12/16/2022
Stretch - 04 7 days 12/17/2022 12/23/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 3 days 12/19/2022 12/21/2022
RCC M30 Cum 26.641 1 day 12/22/2022 12/22/2022
Deshuttering Sqm 103.815 1 day 12/23/2022 12/23/2022
Stretch - 05 7 days 12/10/2022 12/16/2022
Reinforcement work MT 4.886 2 days 12/10/2022 12/11/2022
Shuttering work - BGL Sqm 103.815 3 days 12/12/2022 12/14/2022
RCC M30 Cum 26.641 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 103.815 1 day 12/16/2022 12/16/2022
Lift - 03 - 2.34 Mtr depth 14 days 12/17/2022 12/30/2022
Stretch - 01 7 days 12/17/2022 12/23/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 3 days 12/19/2022 12/21/2022
RCC M30 Cum 26.641 1 day 12/22/2022 12/22/2022
Deshuttering Sqm 103.815 1 day 12/23/2022 12/23/2022
Stretch - 02 7 days 12/24/2022 12/30/2022
Reinforcement work MT 4.886 2 days 12/24/2022 12/25/2022
Shuttering work - BGL Sqm 103.815 3 days 12/26/2022 12/28/2022
RCC M30 Cum 26.641 1 day 12/29/2022 12/29/2022
Deshuttering Sqm 103.815 1 day 12/30/2022 12/30/2022
Stretch - 03 7 days 12/17/2022 12/23/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 3 days 12/19/2022 12/21/2022
RCC M30 Cum 26.641 1 day 12/22/2022 12/22/2022
Deshuttering Sqm 103.815 1 day 12/23/2022 12/23/2022
Stretch - 04 7 days 12/24/2022 12/30/2022
Reinforcement work MT 4.886 2 days 12/24/2022 12/25/2022
Shuttering work - BGL Sqm 103.815 3 days 12/26/2022 12/28/2022
RCC M30 Cum 26.641 1 day 12/29/2022 12/29/2022
Deshuttering Sqm 103.815 1 day 12/30/2022 12/30/2022
Stretch - 05 7 days 12/17/2022 12/23/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 3 days 12/19/2022 12/21/2022
RCC M30 Cum 26.641 1 day 12/22/2022 12/22/2022
Deshuttering Sqm 103.815 1 day 12/23/2022 12/23/2022
Lift - 04 - 2.34 Mtr depth 16 days 12/24/2022 1/8/2023
Stretch - 01 8 days 12/24/2022 12/31/2022
Reinforcement work MT 4.886 2 days 12/24/2022 12/25/2022
Shuttering work - BGL Sqm 103.815 4 days 12/26/2022 12/29/2022
RCC M30 Cum 26.641 1 day 12/30/2022 12/30/2022
Deshuttering Sqm 103.815 1 day 12/31/2022 12/31/2022
Stretch - 02 8 days 1/1/2023 1/8/2023
Reinforcement work MT 4.886 2 days 1/1/2023 1/2/2023
Shuttering work - BGL Sqm 103.815 4 days 1/3/2023 1/6/2023
RCC M30 Cum 26.641 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 103.815 1 day 1/8/2023 1/8/2023

Reservoir Pump House Page 17 of 100


RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Stretch - 03 8 days 12/24/2022 12/31/2022
Reinforcement work MT 4.886 2 days 12/24/2022 12/25/2022
Shuttering work - BGL Sqm 103.815 4 days 12/26/2022 12/29/2022
RCC M30 Cum 26.641 1 day 12/30/2022 12/30/2022
Deshuttering Sqm 103.815 1 day 12/31/2022 12/31/2022
Stretch - 04 8 days 1/1/2023 1/8/2023
Reinforcement work MT 4.886 2 days 1/1/2023 1/2/2023
Shuttering work - BGL Sqm 103.815 4 days 1/3/2023 1/6/2023
RCC M30 Cum 26.641 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 103.815 1 day 1/8/2023 1/8/2023
Stretch - 05 8 days 12/24/2022 12/31/2022
Reinforcement work MT 4.886 2 days 12/24/2022 12/25/2022
Shuttering work - BGL Sqm 103.815 4 days 12/26/2022 12/29/2022
RCC M30 Cum 26.641 1 day 12/30/2022 12/30/2022
Deshuttering Sqm 103.815 1 day 12/31/2022 12/31/2022
Lift - 05 - 2.34 Mtr depth 16 days 1/1/2023 1/16/2023
Stretch - 01 8 days 1/1/2023 1/8/2023
Reinforcement work MT 4.886 2 days 1/1/2023 1/2/2023
Shuttering work - BGL Sqm 103.815 4 days 1/3/2023 1/6/2023
RCC M30 Cum 26.641 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 103.815 1 day 1/8/2023 1/8/2023
Stretch - 02 8 days 1/9/2023 1/16/2023
Reinforcement work MT 4.886 2 days 1/9/2023 1/10/2023
Shuttering work - BGL Sqm 103.815 4 days 1/11/2023 1/14/2023
RCC M30 Cum 26.641 1 day 1/15/2023 1/15/2023
Deshuttering Sqm 103.815 1 day 1/16/2023 1/16/2023
Stretch - 03 8 days 1/1/2023 1/8/2023
Reinforcement work MT 4.886 2 days 1/1/2023 1/2/2023
Shuttering work - BGL Sqm 103.815 4 days 1/3/2023 1/6/2023
RCC M30 Cum 26.641 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 103.815 1 day 1/8/2023 1/8/2023
Stretch - 04 8 days 1/9/2023 1/16/2023
Reinforcement work MT 4.886 2 days 1/9/2023 1/10/2023
Shuttering work - BGL Sqm 103.815 4 days 1/11/2023 1/14/2023
RCC M30 Cum 26.641 1 day 1/15/2023 1/15/2023
Deshuttering Sqm 103.815 1 day 1/16/2023 1/16/2023
Stretch - 05 8 days 1/1/2023 1/8/2023
Reinforcement work MT 4.886 2 days 1/1/2023 1/2/2023
Shuttering work - BGL Sqm 103.815 4 days 1/3/2023 1/6/2023
RCC M30 Cum 26.641 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 103.815 1 day 1/8/2023 1/8/2023

4th Grid - 04 Nos & D Grid - 03 Nos 41 days 12/17/2022 1/26/2023


F1 (5250 x 3750) & F2 (4500 x 3500) 6 days 12/17/2022 12/22/2022
PCC 1:4:8 Cum 13.828 1 day 12/17/2022 12/17/2022
Reinforcement work MT 8.62 2 days 12/18/2022 12/19/2022
Shuttering work - BGL Sqm 84.56 1 day 12/20/2022 12/20/2022
RCC M30 Cum 75.6 1 day 12/21/2022 12/21/2022
Deshuttering Sqm 84.56 1 day 12/22/2022 12/22/2022

Column - 9 Nos of 11.3 mtr depth (380 X 750) 16 days 12/21/2022 1/5/2023

Reservoir Pump House Page 18 of 100


RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Lift - 01 - 2.44 mtr Depth 4 days 12/21/2022 12/24/2022
Reinforcement work MT 0.847 1 day 12/21/2022 12/21/2022
Shuttering work - BGL Sqm 38.479 1 day 12/22/2022 12/22/2022
RCC M30 Cum 3.174 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 38.479 1 day 12/24/2022 12/24/2022
Lift - 02 - 2.34 mtr Depth 4 days 12/24/2022 12/27/2022
Reinforcement work MT 0.812 1 day 12/24/2022 12/24/2022
Shuttering work - BGL Sqm 36.902 1 day 12/25/2022 12/25/2022
RCC M30 Cum 3.044 1 day 12/26/2022 12/26/2022
Deshuttering Sqm 36.902 1 day 12/27/2022 12/27/2022
Lift - 03 - 2.34 mtr Depth 4 days 12/27/2022 12/30/2022
Reinforcement work MT 0.812 1 day 12/27/2022 12/27/2022
Shuttering work - BGL Sqm 36.902 1 day 12/28/2022 12/28/2022
RCC M30 Cum 3.044 1 day 12/29/2022 12/29/2022
Deshuttering Sqm 36.902 1 day 12/30/2022 12/30/2022
Lift - 04 - 2.34 mtr Depth 4 days 12/30/2022 1/2/2023
Reinforcement work MT 0.812 1 day 12/30/2022 12/30/2022
Shuttering work - BGL Sqm 36.902 1 day 12/31/2022 12/31/2022
RCC M30 Cum 3.044 1 day 1/1/2023 1/1/2023
Deshuttering Sqm 36.902 1 day 1/2/2023 1/2/2023
Lift - 05 - 2.34 mtr Depth 4 days 1/2/2023 1/5/2023
Reinforcement work MT 0.812 1 day 1/2/2023 1/2/2023
Shuttering work - BGL Sqm 36.902 1 day 1/3/2023 1/3/2023
RCC M30 Cum 3.044 1 day 1/4/2023 1/4/2023
Deshuttering Sqm 36.902 1 day 1/5/2023 1/5/2023

Tank Roof Slab 10 days 1/17/2023 1/26/2023


Shuttering work Sqm 424.108 5 days 1/17/2023 1/21/2023
Reinforcement work MT 10.78 4 days 1/22/2023 1/25/2023
Concrete Cum 93.827 1 day 1/26/2023 1/26/2023

5th Grid - 04 Nos - BGL 16 days 12/27/2022 1/11/2023


F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 12/27/2022 12/30/2022
PCC 1:4:8 Cum 6.216 1 day 12/27/2022 12/27/2022
Reinforcement work MT 2.89 1 day 12/28/2022 12/28/2022
Shuttering work - BGL Sqm 6.32 1 day 12/29/2022 12/29/2022
RCC M30 Cum 29.925 1 day 12/29/2022 12/29/2022
Deshuttering Sqm 6.32 1 day 12/30/2022 12/30/2022

Column - 4 Nos of 9.5 mtr depth (380 X 750) 12 days 12/31/2022 1/11/2023
Lift - 01 - 2.44 mtr Depth 3 days 12/31/2022 1/2/2023
Reinforcement work MT 0.405 1 day 12/31/2022 12/31/2022
Shuttering work - BGL Sqm 1.623 1 day 1/1/2023 1/1/2023
RCC M30 Cum 2.723 1 day 1/1/2023 1/1/2023
Deshuttering Sqm 1.623 1 day 1/2/2023 1/2/2023
Lift - 02 - 2.34 mtr Depth 3 days 1/3/2023 1/5/2023
Reinforcement work MT 0.388 1 day 1/3/2023 1/3/2023
Shuttering work - BGL Sqm 1.556 1 day 1/4/2023 1/4/2023
RCC M30 Cum 2.611 1 day 1/4/2023 1/4/2023
Deshuttering Sqm 1.556 1 day 1/5/2023 1/5/2023
Lift - 03 - 2.34 mtr Depth 3 days 1/6/2023 1/8/2023

Reservoir Pump House Page 19 of 100


RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Reinforcement work MT 0.388 1 day 1/6/2023 1/6/2023
Shuttering work - BGL Sqm 1.556 1 day 1/7/2023 1/7/2023
RCC M30 Cum 2.611 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 1.556 1 day 1/8/2023 1/8/2023
Lift - 04 - 2.34 mtr Depth 3 days 1/9/2023 1/11/2023
Reinforcement work MT 0.388 1 day 1/9/2023 1/9/2023
Shuttering work - BGL Sqm 1.556 1 day 1/10/2023 1/10/2023
RCC M30 Cum 2.611 1 day 1/10/2023 1/10/2023
Deshuttering Sqm 1.556 1 day 1/11/2023 1/11/2023

6th Grid - 04 Nos - BGL 13 days 1/12/2023 1/24/2023


F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 1/3/2023 1/6/2023
PCC 1:4:8 Cum 6.216 1 day 1/3/2023 1/3/2023
Reinforcement work MT 2.89 1 day 1/4/2023 1/4/2023
Shuttering work - BGL Sqm 6.32 1 day 1/5/2023 1/5/2023
RCC M30 Cum 29.925 1 day 1/5/2023 1/5/2023
Deshuttering Sqm 6.32 1 day 1/6/2023 1/6/2023

Column - 4 Nos of 6.3 mtr depth (380 X 750) 9 days 1/7/2023 1/15/2023
Lift - 01 - 2.44 mtr Depth 3 days 1/7/2023 1/9/2023
Reinforcement work MT 0.434 1 day 1/7/2023 1/7/2023
Shuttering work - BGL Sqm 22.058 1 day 1/8/2023 1/8/2023
RCC M30 Cum 2.782 1 day 1/8/2023 1/8/2023
Deshuttering Sqm 22.058 1 day 1/9/2023 1/9/2023
Lift - 02 - 2.34 mtr Depth 3 days 1/10/2023 1/12/2023
Reinforcement work MT 0.417 1 day 1/10/2023 1/10/2023
Shuttering work - BGL Sqm 21.154 1 day 1/11/2023 1/11/2023
RCC M30 Cum 2.668 1 day 1/11/2023 1/11/2023
Deshuttering Sqm 21.154 1 day 1/12/2023 1/12/2023
Lift - 03 - 1.52 mtr Depth 3 days 1/13/2023 1/15/2023
Reinforcement work MT 0.271 1 day 1/13/2023 1/13/2023
Shuttering work - BGL Sqm 13.741 1 day 1/14/2023 1/14/2023
RCC M30 Cum 1.733 1 day 1/14/2023 1/14/2023
Deshuttering Sqm 13.741 1 day 1/15/2023 1/15/2023

7th Grid - 04 Nos - BGL 10 days 1/10/2023 1/19/2023


F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 1/10/2023 1/13/2023
PCC 1:4:8 Cum 6.216 1 day 1/10/2023 1/10/2023
Reinforcement work MT 2.89 1 day 1/11/2023 1/11/2023
Shuttering work - BGL Sqm 6.32 1 day 1/11/2023 1/11/2023
RCC M30 Cum 29.925 1 day 1/12/2023 1/12/2023
Deshuttering Sqm 6.32 1 day 1/13/2023 1/13/2023

Column - 4 Nos of 3.3 mtr depth (380 X 750) 6 days 1/14/2023 1/19/2023
Lift - 01 - 2.44 mtr Depth 3 days 1/14/2023 1/16/2023
Reinforcement work MT 0.481 1 day 1/14/2023 1/14/2023
Shuttering work - BGL Sqm 21.274 1 day 1/15/2023 1/15/2023
RCC M30 Cum 2.782 1 day 1/15/2023 1/15/2023
Deshuttering Sqm 21.274 1 day 1/16/2023 1/16/2023
Lift - 02 - 0.86 mtr Depth 3 days 1/17/2023 1/19/2023
Reinforcement work MT 0.169 1 day 1/17/2023 1/17/2023

Reservoir Pump House Page 20 of 100


RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Shuttering work - BGL Sqm 7.498 1 day 1/18/2023 1/18/2023
RCC M30 Cum 0.98 1 day 1/18/2023 1/18/2023
Deshuttering Sqm 7.498 1 day 1/19/2023 1/19/2023

Tie Beam +237.65 Mtr Lvl 4 days 12/25/2022 12/28/2022


Reinforcement work MT 0.71 1 day 12/25/2022 12/25/2022
Shuttering work - BGL Sqm 51.09 2 days 12/26/2022 12/27/2022
RCC M30 Cum 5.657 1 day 12/27/2022 12/27/2022
Deshuttering Sqm 51.09 1 day 12/28/2022 12/28/2022

Tie Beam +239.8 Mtr Lvl 6 days 12/29/2022 1/3/2023


Reinforcement work MT 1.17 2 days 12/29/2022 12/30/2022
Shuttering work - BGL Sqm 86.322 2 days 12/31/2022 1/1/2023
RCC M30 Cum 9.62 1 day 1/2/2023 1/2/2023
Deshuttering Sqm 86.322 1 day 1/3/2023 1/3/2023

Tie Beam +242.7 Mtr Lvl 6 days 1/4/2023 1/9/2023


Reinforcement work MT 1.62 2 days 1/4/2023 1/5/2023
Shuttering work - BGL Sqm 121.554 2 days 1/6/2023 1/7/2023
RCC M30 Cum 13.584 1 day 1/8/2023 1/8/2023
Deshuttering Sqm 121.554 1 day 1/9/2023 1/9/2023

Tie Beam +245.6 Mtr Lvl 6 days 1/10/2023 1/15/2023


Reinforcement work MT 2.08 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 161.844 2 days 1/12/2023 1/13/2023
RCC M30 Cum 18.306 1 day 1/14/2023 1/14/2023
Deshuttering Sqm 161.844 1 day 1/15/2023 1/15/2023

Tie Beam +247.8 Mtr Lvl 6 days 1/16/2023 1/21/2023


Reinforcement work MT 4.73 2 days 1/16/2023 1/17/2023
Shuttering work - BGL Sqm 160.839 2 days 1/18/2023 1/19/2023
RCC M30 Cum 16.686 1 day 1/20/2023 1/20/2023
Deshuttering Sqm 160.839 1 day 1/21/2023 1/21/2023

AGL 54 days 1/27/2023 3/21/2023


Column - 09 Nos of 9.5 mtr depth (380 x 750) 26 days 1/27/2023 2/21/2023
Lift - 01 - 2.44 mtr Depth 5 days 1/27/2023 1/31/2023
Reinforcement work MT 0.847 1 day 1/27/2023 1/27/2023
Shuttering work - BGL Sqm 60.658 2 days 1/28/2023 1/29/2023
RCC M30 Cum 7.662 1 day 1/30/2023 1/30/2023
Deshuttering Sqm 60.658 1 day 1/31/2023 1/31/2023
Lift - 02 - 2.34 mtr Depth 7 days 2/1/2023 2/7/2023
Reinforcement work MT 0.812 2 days 2/1/2023 2/2/2023
Shuttering work - BGL Sqm 58.172 3 days 2/3/2023 2/5/2023
RCC M30 Cum 7.348 1 day 2/6/2023 2/6/2023
Deshuttering Sqm 58.172 1 day 2/7/2023 2/7/2023
Lift - 03 - 2.34 mtr Depth 7 days 2/8/2023 2/14/2023
Reinforcement work MT 0.812 2 days 2/8/2023 2/9/2023
Shuttering work - BGL Sqm 58.172 3 days 2/10/2023 2/12/2023
RCC M30 Cum 7.348 1 day 2/13/2023 2/13/2023
Deshuttering Sqm 58.172 1 day 2/14/2023 2/14/2023

Reservoir Pump House Page 21 of 100


RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Lift - 04 - 2.34 mtr Depth 7 days 2/15/2023 2/21/2023
Reinforcement work MT 0.812 2 days 2/15/2023 2/16/2023
Shuttering work - BGL Sqm 58.172 3 days 2/17/2023 2/19/2023
RCC M30 Cum 7.348 1 day 2/20/2023 2/20/2023
Deshuttering Sqm 58.172 1 day 2/21/2023 2/21/2023

Tie Beam +250.85 Mtr Lvl 4 days 1/31/2023 2/3/2023


Reinforcement work MT 0.28 1 day 1/31/2023 1/31/2023
Shuttering work - BGL Sqm 11.562 1 day 2/1/2023 2/1/2023
RCC M30 Cum 0.859 1 day 2/2/2023 2/2/2023
Deshuttering Sqm 11.562 1 day 2/3/2023 2/3/2023

Tie Beam +253.4 Mtr Lvl 5 days 2/7/2023 2/11/2023


Reinforcement work MT 0.68 1 day 2/7/2023 2/7/2023
Shuttering work - BGL Sqm 33.177 2 days 2/8/2023 2/9/2023
RCC M30 Cum 3.039 1 day 2/10/2023 2/10/2023
Deshuttering Sqm 33.177 1 day 2/11/2023 2/11/2023

At +259.5 Mtr Level (A2A4 - D2D4) 6 days 2/14/2023 2/19/2023


Shuttering work Sqm 155.76 4 days 2/14/2023 2/17/2023
Reinforcement work MT 1.907 1 day 2/18/2023 2/18/2023
Concrete Cum 31.152 1 day 2/19/2023 2/19/2023

Operating Room 5 days 2/23/2023 2/27/2023


230mm Brick work Cum 7.918 3 days 2/23/2023 2/25/2023
115mm Brick work Sqm 10.744 1 day 2/27/2023 2/27/2023
Slab 15 days 2/24/2023 3/10/2023
Shuttering work Sqm 18.281 2 days 2/24/2023 2/25/2023
Reinforcement work MT 0.173 1 day 2/26/2023 2/26/2023
Concrete Cum 2.93 1 day 2/27/2023 2/27/2023
Deshuttering Sqm 18.281 1 day 3/10/2023 3/10/2023
External Plastering Sqm 41.73 3 days 2/27/2023 3/1/2023
Internal Plastering Sqm 35.974 3 days 3/1/2023 3/3/2023
External Painting Sqm 41.73 5 days 3/3/2023 3/7/2023
Internal Painting Sqm 35.974 5 days 3/5/2023 3/9/2023

Pump Room 27 days 2/23/2023 3/21/2023


230mm Brick work Cum 62.74 15 days 2/23/2023 3/9/2023
External Plastering Sqm 432.103 12 days 2/27/2023 3/10/2023
Internal Plastering Sqm 287.46 14 days 2/28/2023 3/13/2023
External Painting Sqm 432.103 7 days 3/11/2023 3/17/2023
Internal Painting Sqm 287.46 8 days 3/14/2023 3/21/2023

Available
Manpower Unit Required Qty
Qty

Supervisor Nos #REF! 0


Carpenter Nos 7 5
Fitter Nos 7 5
Helper Nos 17 18
Total Manpower Nos #REF! 28

Reservoir Pump House Page 22 of 100


RESERVOIR PUMP HOUSE SCHEDULE

Description Unit Qty Duration Start Finish

Reservoir Pump House 131 days 12/5/2022 4/14/2023


Below Ground Level 119 days 12/5/2022 4/2/2023

RCC Wall 6 Nos of 12 mtr length, 2 Nos


of 16 mtr length and 2 Nos of 3 mtr 67 days 12/5/2022 2/9/2023
Length - Total length of wall = 110 Rmt

Lift - 01 - 2.44 Mtr depth 26 days 12/5/2022 12/30/2022


Stretch - 01( 22 m ) 19 days 12/5/2022 12/23/2022 Completed
Stretch - 02 7 days 12/24/2022 12/30/2022 Completed
Stretch - 03 19 days 12/5/2022 12/23/2022 Completed
Stretch - 04 7 days 12/24/2022 12/30/2022 Completed
Stretch - 05 19 days 12/5/2022 12/23/2022 Completed

Lift - 02 - 2.34 Mtr depth 24 days 12/24/2022 1/16/2023


Stretch - 01 17 days 12/24/2022 1/9/2023 Completed
Stretch - 02 7 days 1/10/2023 1/16/2023 Completed
Stretch - 03 17 days 12/24/2022 1/9/2023 Completed
Stretch - 04 7 days 1/10/2023 1/16/2023 Completed
Stretch - 05 17 days 12/24/2022 1/9/2023
Delay by 15 days due to concrete boom break
Reinforcement work MT 4.886 2 days 12/24/2022 12/25/2022 down
Shuttering work - BGL Sqm 103.815 13 days 12/26/2022 1/7/2023
RCC M30 Cum 26.641 1 day 1/8/2023 1/8/2023
after concrete the Next day deshuttering will be
Deshuttering Sqm 103.815 1 day 1/9/2023 1/9/2023
done
Lift - 03 - 2.34 Mtr depth 14 days 1/10/2023 1/23/2023
Stretch - 01 7 days 1/10/2023 1/16/2023
Reinforcement work MT 4.886 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 103.815 3 days 1/12/2023 1/14/2023
RCC M30 Cum 26.641 1 day 1/15/2023 1/15/2023
Deshuttering Sqm 103.815 1 day 1/16/2023 1/16/2023
Stretch - 02 7 days 1/17/2023 1/23/2023
1.Rod shifting,Cutting, bending, aligning & fixing.
2.Per day labour strength 40 nos
3. 1 fitter + 1 helper - 0.5mt / days Only binder
Reinforcement work MT 4.886 2 days 1/17/2023 1/18/2023 work already vertical fixed
. We engaged - 6fitter + 6Heper - 1mt / day &
2days required to complete this job

1.Plywood shifting, cutting, making as per site


requirement.
2. Labour strength per day : Carpender - 6N os
Shuttering work - BGL Sqm 103.815 3 days 1/19/2023 1/21/2023 Helper - 6 Nos.
3. One carpender done 5 Sqm / day. So 4 days
required to comlete the works

1.Batching plant capacity per hour - M1 -60 Per


Hour
2.One transit mixer capacity - 6Cum.
3. 45 Minutes required concrete shifting from
batching plant to pump house. So we plan to
complete the concrte same day (6cum * 5 =
RCC M30 Cum 26.641 1 day 1/22/2023 1/22/2023 28cum).
4.Spreading the concrete with the help of labour -
(2mason +5 helper) Time reuired to spread the
concrete 6 cum 15 minutes

Deshuttering Sqm 103.815 1 day 1/23/2023 1/23/2023


Stretch - 03 7 days 1/10/2023 1/16/2023
Reinforcement work MT 4.886 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 103.815 3 days 1/12/2023 1/14/2023
RCC M30 Cum 26.641 1 day 1/15/2023 1/15/2023
Deshuttering Sqm 103.815 1 day 1/16/2023 1/16/2023
Stretch - 04 7 days 1/17/2023 1/23/2023
Reinforcement work MT 4.886 2 days 1/17/2023 1/18/2023
Shuttering work - BGL Sqm 103.815 3 days 1/19/2023 1/21/2023
RCC M30 Cum 26.641 1 day 1/22/2023 1/22/2023
Deshuttering Sqm 103.815 1 day 1/23/2023 1/23/2023
Stretch - 05 7 days 1/10/2023 1/16/2023
Reinforcement work MT 4.886 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 103.815 3 days 1/12/2023 1/14/2023
RCC M30 Cum 26.641 1 day 1/15/2023 1/15/2023

Page 23 of 100
Description Unit Qty Duration Start Finish

Deshuttering Sqm 103.815 1 day 1/16/2023 1/16/2023


Lift - 04 - 2.34 Mtr depth 16 days 1/17/2023 2/1/2023
Stretch - 01 8 days 1/17/2023 1/24/2023
Reinforcement work MT 4.886 2 days 1/17/2023 1/18/2023
Shuttering work - BGL Sqm 103.815 4 days 1/19/2023 1/22/2023
RCC M30 Cum 26.641 1 day 1/23/2023 1/23/2023
Deshuttering Sqm 103.815 1 day 1/24/2023 1/24/2023
Stretch - 02 8 days 1/25/2023 2/1/2023
Reinforcement work MT 4.886 2 days 1/25/2023 1/26/2023
Shuttering work - BGL Sqm 103.815 4 days 1/27/2023 1/30/2023
RCC M30 Cum 26.641 1 day 1/31/2023 1/31/2023
Deshuttering Sqm 103.815 1 day 2/1/2023 2/1/2023
Stretch - 03 8 days 1/17/2023 1/24/2023
Reinforcement work MT 4.886 2 days 1/17/2023 1/18/2023
Shuttering work - BGL Sqm 103.815 4 days 1/19/2023 1/22/2023
RCC M30 Cum 26.641 1 day 1/23/2023 1/23/2023
Deshuttering Sqm 103.815 1 day 1/24/2023 1/24/2023
Stretch - 04 8 days 1/25/2023 2/1/2023
Reinforcement work MT 4.886 2 days 1/25/2023 1/26/2023
Shuttering work - BGL Sqm 103.815 4 days 1/27/2023 1/30/2023
RCC M30 Cum 26.641 1 day 1/31/2023 1/31/2023
Deshuttering Sqm 103.815 1 day 2/1/2023 2/1/2023
Stretch - 05 8 days 1/17/2023 1/24/2023
Reinforcement work MT 4.886 2 days 1/17/2023 1/18/2023
Shuttering work - BGL Sqm 103.815 4 days 1/19/2023 1/22/2023
RCC M30 Cum 26.641 1 day 1/23/2023 1/23/2023
Deshuttering Sqm 103.815 1 day 1/24/2023 1/24/2023
Lift - 05 - 2.34 Mtr depth 16 days 1/25/2023 2/9/2023
Stretch - 01 8 days 1/25/2023 2/1/2023
Reinforcement work MT 4.886 2 days 1/25/2023 1/26/2023
Shuttering work - BGL Sqm 103.815 4 days 1/27/2023 1/30/2023
RCC M30 Cum 26.641 1 day 1/31/2023 1/31/2023
Deshuttering Sqm 103.815 1 day 2/1/2023 2/1/2023
Stretch - 02 8 days 2/2/2023 2/9/2023
Reinforcement work MT 4.886 2 days 2/2/2023 2/3/2023
Shuttering work - BGL Sqm 103.815 4 days 2/4/2023 2/7/2023
RCC M30 Cum 26.641 1 day 2/8/2023 2/8/2023
Deshuttering Sqm 103.815 1 day 2/9/2023 2/9/2023
Stretch - 03 8 days 1/25/2023 2/1/2023
Reinforcement work MT 4.886 2 days 1/25/2023 1/26/2023
Shuttering work - BGL Sqm 103.815 4 days 1/27/2023 1/30/2023
RCC M30 Cum 26.641 1 day 1/31/2023 1/31/2023
Deshuttering Sqm 103.815 1 day 2/1/2023 2/1/2023
Stretch - 04 8 days 2/2/2023 2/9/2023
Reinforcement work MT 4.886 2 days 2/2/2023 2/3/2023
Shuttering work - BGL Sqm 103.815 4 days 2/4/2023 2/7/2023
RCC M30 Cum 26.641 1 day 2/8/2023 2/8/2023
Deshuttering Sqm 103.815 1 day 2/9/2023 2/9/2023
Stretch - 05 8 days 1/25/2023 2/1/2023
Reinforcement work MT 4.886 2 days 1/25/2023 1/26/2023
Shuttering work - BGL Sqm 103.815 4 days 1/27/2023 1/30/2023
RCC M30 Cum 26.641 1 day 1/31/2023 1/31/2023
Deshuttering Sqm 103.815 1 day 2/1/2023 2/1/2023

4th Grid - 04 Nos & D Grid - 03 Nos 41 days 1/10/2023 2/19/2023


F1 (5250 x 3750) & F2 (4500 x 3500) 6 days 1/10/2023 1/15/2023
PCC 1:4:8 Cum 13.828 1 day 1/10/2023 1/10/2023
Reinforcement work MT 8.62 2 days 1/11/2023 1/12/2023
Shuttering work - BGL Sqm 84.56 1 day 1/13/2023 1/13/2023
RCC M30 Cum 75.6 1 day 1/14/2023 1/14/2023
Deshuttering Sqm 84.56 1 day 1/15/2023 1/15/2023

Column - 9 Nos of 11.3 mtr depth (380 X 750) 16 days 1/14/2023 1/29/2023
Lift - 01 - 2.44 mtr Depth 4 days 1/14/2023 1/17/2023
Reinforcement work MT 0.847 1 day 1/14/2023 1/14/2023
Shuttering work - BGL Sqm 38.479 1 day 1/15/2023 1/15/2023
RCC M30 Cum 3.174 1 day 1/16/2023 1/16/2023
Deshuttering Sqm 38.479 1 day 1/17/2023 1/17/2023
Lift - 02 - 2.34 mtr Depth 4 days 1/17/2023 1/20/2023
Reinforcement work MT 0.812 1 day 1/17/2023 1/17/2023
Shuttering work - BGL Sqm 36.902 1 day 1/18/2023 1/18/2023
RCC M30 Cum 3.044 1 day 1/19/2023 1/19/2023

Page 24 of 100
Description Unit Qty Duration Start Finish

Deshuttering Sqm 36.902 1 day 1/20/2023 1/20/2023


Lift - 03 - 2.34 mtr Depth 4 days 1/20/2023 1/23/2023
Reinforcement work MT 0.812 1 day 1/20/2023 1/20/2023
Shuttering work - BGL Sqm 36.902 1 day 1/21/2023 1/21/2023
RCC M30 Cum 3.044 1 day 1/22/2023 1/22/2023
Deshuttering Sqm 36.902 1 day 1/23/2023 1/23/2023
Lift - 04 - 2.34 mtr Depth 4 days 1/23/2023 1/26/2023
Reinforcement work MT 0.812 1 day 1/23/2023 1/23/2023
Shuttering work - BGL Sqm 36.902 1 day 1/24/2023 1/24/2023
RCC M30 Cum 3.044 1 day 1/25/2023 1/25/2023
Deshuttering Sqm 36.902 1 day 1/26/2023 1/26/2023
Lift - 05 - 2.34 mtr Depth 4 days 1/26/2023 1/29/2023
Reinforcement work MT 0.812 1 day 1/26/2023 1/26/2023
Shuttering work - BGL Sqm 36.902 1 day 1/27/2023 1/27/2023
RCC M30 Cum 3.044 1 day 1/28/2023 1/28/2023
Deshuttering Sqm 36.902 1 day 1/29/2023 1/29/2023

Tank Roof Slab 10 days 2/10/2023 2/19/2023


Shuttering work Sqm 424.108 5 days 2/10/2023 2/14/2023
Reinforcement work MT 10.78 4 days 2/15/2023 2/18/2023
Concrete Cum 93.827 1 day 2/19/2023 2/19/2023
Deshuttering Sqm 424.108 1 day

5th Grid - 04 Nos - BGL 16 days 1/20/2023 2/4/2023


F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 1/20/2023 1/23/2023
PCC 1:4:8 Cum 6.216 1 day 1/20/2023 1/20/2023
Reinforcement work MT 2.89 1 day 1/21/2023 1/21/2023
Shuttering work - BGL Sqm 6.32 1 day 1/22/2023 1/22/2023
RCC M30 Cum 29.925 1 day 1/22/2023 1/22/2023
Deshuttering Sqm 6.32 1 day 1/23/2023 1/23/2023

Column - 4 Nos of 9.5 mtr depth (380 X 750) 12 days 1/24/2023 2/4/2023
Lift - 01 - 2.44 mtr Depth 3 days 1/24/2023 1/26/2023
Reinforcement work MT 0.405 1 day 1/24/2023 1/24/2023
Shuttering work - BGL Sqm 1.623 1 day 1/25/2023 1/25/2023
RCC M30 Cum 2.723 1 day 1/25/2023 1/25/2023
Deshuttering Sqm 1.623 1 day 1/26/2023 1/26/2023
Lift - 02 - 2.34 mtr Depth 3 days 1/27/2023 1/29/2023
Reinforcement work MT 0.388 1 day 1/27/2023 1/27/2023
Shuttering work - BGL Sqm 1.556 1 day 1/28/2023 1/28/2023
RCC M30 Cum 2.611 1 day 1/28/2023 1/28/2023
Deshuttering Sqm 1.556 1 day 1/29/2023 1/29/2023
Lift - 03 - 2.34 mtr Depth 3 days 1/30/2023 2/1/2023
Reinforcement work MT 0.388 1 day 1/30/2023 1/30/2023
Shuttering work - BGL Sqm 1.556 1 day 1/31/2023 1/31/2023
RCC M30 Cum 2.611 1 day 1/31/2023 1/31/2023
Deshuttering Sqm 1.556 1 day 2/1/2023 2/1/2023
Lift - 04 - 2.34 mtr Depth 3 days 2/2/2023 2/4/2023
Reinforcement work MT 0.388 1 day 2/2/2023 2/2/2023
Shuttering work - BGL Sqm 1.556 1 day 2/3/2023 2/3/2023
RCC M30 Cum 2.611 1 day 2/3/2023 2/3/2023
Deshuttering Sqm 1.556 1 day 2/4/2023 2/4/2023

6th Grid - 04 Nos - BGL 13 days 1/12/2023 1/24/2023


F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 1/27/2023 1/30/2023
PCC 1:4:8 Cum 6.216 1 day 1/27/2023 1/27/2023
Reinforcement work MT 2.89 1 day 1/28/2023 1/28/2023
Shuttering work - BGL Sqm 6.32 1 day 1/29/2023 1/29/2023
RCC M30 Cum 29.925 1 day 1/29/2023 1/29/2023
Deshuttering Sqm 6.32 1 day 1/30/2023 1/30/2023

Column - 4 Nos of 6.3 mtr depth (380 X 750) 9 days 1/31/2023 2/8/2023
Lift - 01 - 2.44 mtr Depth 3 days 1/31/2023 2/2/2023
Reinforcement work MT 0.434 1 day 1/31/2023 1/31/2023
Shuttering work - BGL Sqm 22.058 1 day 2/1/2023 2/1/2023
RCC M30 Cum 2.782 1 day 2/1/2023 2/1/2023
Deshuttering Sqm 22.058 1 day 2/2/2023 2/2/2023
Lift - 02 - 2.34 mtr Depth 3 days 2/3/2023 2/5/2023
Reinforcement work MT 0.417 1 day 2/3/2023 2/3/2023
Shuttering work - BGL Sqm 21.154 1 day 2/4/2023 2/4/2023
RCC M30 Cum 2.668 1 day 2/4/2023 2/4/2023
Deshuttering Sqm 21.154 1 day 2/5/2023 2/5/2023

Page 25 of 100
Description Unit Qty Duration Start Finish

Lift - 03 - 1.52 mtr Depth 3 days 2/6/2023 2/8/2023


Reinforcement work MT 0.271 1 day 2/6/2023 2/6/2023
Shuttering work - BGL Sqm 13.741 1 day 2/7/2023 2/7/2023
RCC M30 Cum 1.733 1 day 2/7/2023 2/7/2023
Deshuttering Sqm 13.741 1 day 2/8/2023 2/8/2023
7th Grid - 04 Nos - BGL 10 days 2/3/2023 2/12/2023
F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 2/3/2023 2/6/2023
PCC 1:4:8 Cum 6.216 1 day 2/3/2023 2/3/2023
Reinforcement work MT 2.89 1 day 2/4/2023 2/4/2023
Shuttering work - BGL Sqm 6.32 1 day 2/4/2023 2/4/2023
RCC M30 Cum 29.925 1 day 2/5/2023 2/5/2023
Deshuttering Sqm 6.32 1 day 2/6/2023 2/6/2023

Column - 4 Nos of 3.3 mtr depth (380 X 750) 6 days 2/7/2023 2/12/2023
Lift - 01 - 2.44 mtr Depth 3 days 2/7/2023 2/9/2023
Reinforcement work MT 0.481 1 day 2/7/2023 2/7/2023
Shuttering work - BGL Sqm 21.274 1 day 2/8/2023 2/8/2023
RCC M30 Cum 2.782 1 day 2/8/2023 2/8/2023
Deshuttering Sqm 21.274 1 day 2/9/2023 2/9/2023
Lift - 02 - 0.86 mtr Depth 3 days 2/10/2023 2/12/2023
Reinforcement work MT 0.169 1 day 2/10/2023 2/10/2023
Shuttering work - BGL Sqm 7.498 1 day 2/11/2023 2/11/2023
RCC M30 Cum 0.98 1 day 2/11/2023 2/11/2023
Deshuttering Sqm 7.498 1 day 2/12/2023 2/12/2023

Tie Beam +237.65 Mtr Lvl 4 days 1/18/2023 1/21/2023


Reinforcement work MT 0.71 1 day 1/18/2023 1/18/2023
Shuttering work - BGL Sqm 51.09 2 days 1/19/2023 1/20/2023
RCC M30 Cum 5.657 1 day 1/20/2023 1/20/2023
Deshuttering Sqm 51.09 1 day 1/21/2023 1/21/2023

Tie Beam +239.8 Mtr Lvl 6 days 1/22/2023 1/27/2023


Reinforcement work MT 1.17 2 days 1/22/2023 1/23/2023
Shuttering work - BGL Sqm 86.322 2 days 1/24/2023 1/25/2023
RCC M30 Cum 9.62 1 day 1/26/2023 1/26/2023
Deshuttering Sqm 86.322 1 day 1/27/2023 1/27/2023
Tie Beam +242.7 Mtr Lvl 6 days 1/28/2023 2/2/2023
Reinforcement work MT 1.62 2 days 1/28/2023 1/29/2023
Shuttering work - BGL Sqm 121.554 2 days 1/30/2023 1/31/2023
RCC M30 Cum 13.584 1 day 2/1/2023 2/1/2023
Deshuttering Sqm 121.554 1 day 2/2/2023 2/2/2023

Tie Beam +245.6 Mtr Lvl 6 days 2/3/2023 2/8/2023


Reinforcement work MT 2.08 2 days 2/3/2023 2/4/2023
Shuttering work - BGL Sqm 161.844 2 days 2/5/2023 2/6/2023
RCC M30 Cum 18.306 1 day 2/7/2023 2/7/2023

Page 26 of 100
Description Unit Qty Duration Start Finish

Deshuttering Sqm 161.844 1 day 2/8/2023 2/8/2023

Tie Beam +247.8 Mtr Lvl 6 days 2/9/2023 2/14/2023


Reinforcement work MT 4.73 2 days 2/9/2023 2/10/2023
Shuttering work - BGL Sqm 160.839 2 days 2/11/2023 2/12/2023
RCC M30 Cum 16.686 1 day 2/13/2023 2/13/2023
Deshuttering Sqm 160.839 1 day 2/14/2023 2/14/2023

Above Ground Level 42 days 2/20/2023 4/2/2023


Column - 09 Nos of 9.5 mtr depth (380 X 750) 26 days 2/20/2023 3/17/2023
Lift - 01 - 2.44 mtr Depth 5 days 2/20/2023 2/24/2023
Reinforcement work MT 0.847 1 day 2/20/2023 2/20/2023
Shuttering work - BGL Sqm 60.658 2 days 2/21/2023 2/22/2023
RCC M30 Cum 7.662 1 day 2/23/2023 2/23/2023
Deshuttering Sqm 60.658 1 day 2/24/2023 2/24/2023
Lift - 02 - 2.34 mtr Depth 7 days 2/25/2023 3/3/2023
Reinforcement work MT 0.812 2 days 2/25/2023 2/26/2023
Shuttering work - BGL Sqm 58.172 3 days 2/27/2023 3/1/2023
RCC M30 Cum 7.348 1 day 3/2/2023 3/2/2023
Deshuttering Sqm 58.172 1 day 3/3/2023 3/3/2023
Lift - 03 - 2.34 mtr Depth 7 days 3/4/2023 3/10/2023
Reinforcement work MT 0.812 2 days 3/4/2023 3/5/2023
Shuttering work - BGL Sqm 58.172 3 days 3/6/2023 3/8/2023
RCC M30 Cum 7.348 1 day 3/9/2023 3/9/2023
Deshuttering Sqm 58.172 1 day 3/10/2023 3/10/2023
Lift - 04 - 2.34 mtr Depth 7 days 3/11/2023 3/17/2023
Reinforcement work MT 0.812 2 days 3/11/2023 3/12/2023
Shuttering work - BGL Sqm 58.172 3 days 3/13/2023 3/15/2023
RCC M30 Cum 7.348 1 day 3/16/2023 3/16/2023
Deshuttering Sqm 58.172 1 day 3/17/2023 3/17/2023

Tie Beam +250.85 Mtr Lvl 4 days 2/24/2023 2/27/2023


Reinforcement work MT 0.28 1 day 2/24/2023 2/24/2023
Shuttering work - BGL Sqm 11.562 1 day 2/25/2023 2/25/2023
RCC M30 Cum 0.859 1 day 2/26/2023 2/26/2023
Deshuttering Sqm 11.562 1 day 2/27/2023 2/27/2023

Tie Beam +253.4 Mtr Lvl 5 days 3/3/2023 3/7/2023


Reinforcement work MT 0.68 1 day 3/3/2023 3/3/2023
Shuttering work - BGL Sqm 33.177 2 days 3/4/2023 3/5/2023
RCC M30 Cum 3.039 1 day 3/6/2023 3/6/2023
Deshuttering Sqm 33.177 1 day 3/7/2023 3/7/2023

at +259.5 Mtr Level (A2A4 - D2D4) 6 days 3/10/2023 3/15/2023


Shuttering work Sqm 155.76 4 days 3/10/2023 3/13/2023
Reinforcement work MT 1.907 1 day 3/14/2023 3/14/2023
Concrete Cum 31.152 1 day 3/15/2023 3/15/2023
Deshuttering Sqm 155.76 1 day

Operating Room 5 days 3/19/2023 3/23/2023


230mm Brick work Cum 7.918 3 days 3/19/2023 3/21/2023
115mm Brick work Sqm 10.744 1 day 3/23/2023 3/23/2023
Slab 38 days 2/24/2023 4/2/2023
Shuttering work Sqm 18.281 2 days 2/24/2023 2/25/2023
Reinforcement work MT 0.173 1 day 2/26/2023 2/26/2023
Concrete Cum 2.93 1 day 2/27/2023 2/27/2023
Deshuttering Sqm 18.281 1 day 3/10/2023 3/10/2023
External Plastering Sqm 41.73 3 days 3/23/2023 3/25/2023
Internal Plastering Sqm 35.974 3 days 3/25/2023 3/27/2023
External Painting Sqm 41.73 5 days 3/27/2023 3/31/2023
Internal Painting Sqm 35.974 5 days 3/29/2023 4/2/2023

Pump Room 27 days 3/19/2023 4/14/2023


230mm Brick work Cum 62.74 15 days 3/19/2023 4/2/2023
External Plastering Sqm 432.103 12 days 3/23/2023 4/3/2023
Internal Plastering Sqm 287.46 14 days 3/24/2023 4/6/2023
External Painting Sqm 432.103 7 days 4/4/2023 4/10/2023
Internal Painting Sqm 287.46 8 days 4/7/2023 4/14/2023

Manpower Unit Available Qty Required Qty

Supervisor Nos 1 0

Page 27 of 100
Description Unit Qty Duration Start Finish

Carpenter Nos 7 3
Fitter Nos 7 3
Helper Nos 15 10
Total Manpower Nos 30 16

Page 28 of 100
Work details Qty No of days Time study Man power

Pump House Wall & Roof (Only pump house 55 55Days required to complete pump
portion) house wall& Roof
Total wall length - 110Rmt, Height - 12M
One lift ht - 2.4m
5 Lift
1st lift qty
5 1F+1 Helper done - 20F+20H done - 5MT/Day. So 5 day
Reinforcement steel 25MT 0.25MT / Day 20F+20H required to complete this job.

2 1C+1H Done - 20C+2H Done - 100Sqm/day.so 2days


Shuttering work - BGL 216Sqm 5Sqm/day 20C+20H required to complete this job

1 One transit mixer capacity - 6Cum &


Transit time - 1Hour.(We engage
2Transit mixer) Per hour 12cum,
RCC M30 138Cum 5M+10Helper 12hours required to complete this job.

1 1C+1H Done - 20C+2H Done - 200Sqm/day.so1day


Deshuttering 216Sqm 10Sqm/day 20C+20H required to complete this job.

2nd lift qty


5 1F+1 Helper done - 20F+20H done - 5MT/Day. So 5 day
Reinforcement steel 25MT 0.25MT / Day 20F+20H required to complete this job.

2 1C+1H Done - 20C+2H Done - 100Sqm/day.so 2days


Shuttering work - BGL 216Sqm 5Sqm/day 20C+20H required to complete this job

One transit mixer capacity - 6Cum &


1 Transit time - 1Hour.(We engage
2Transit mixer) Per our we get -
12cum, 12hours required to complete
RCC M30 138Cum 5M+10Helper this job.

1 1C+1H Done - 20C+2H Done - 200Sqm/day.so1day


Deshuttering 216Sqm 10Sqm/day 20C+20H required to complete this job.

3rd lift qty


5 1F+1 Helper done - 20F+20H done - 5MT/Day. So 5 day
Reinforcement steel 25MT 0.25MT / Day 20F+20H required to complete this job.

2 1C+1H Done - 20C+2H Done - 100Sqm/day.so 2days


Shuttering work - BGL 216Sqm 5Sqm/day 20C+20H required to complete this job

One transit mixer capacity - 6Cum &


1 Transit time - 1Hour.(We engage
2Transit mixer) Per our we get -
12cum, 12hours required to complete
RCC M30 138Cum 5M+10Helper this job.

1 1C+1H Done - 20C+2H Done - 200Sqm/day.so1day


Deshuttering 216Sqm 10Sqm/day 20C+20H required to complete this job.

4th lift qty


5 1F+1 Helper done - 20F+20H done - 5MT/Day. So 5 day
Reinforcement steel 25MT 0.25MT / Day 20F+20H required to complete this job.

2 1C+1H Done - 20C+2H Done - 100Sqm/day.so 2days


Shuttering work - BGL 216Sqm 5Sqm/day 20C+20H required to complete this job

One transit mixer capacity - 6Cum &


1 Transit time - 1Hour.(We engage
2Transit mixer) Per our we get -
12cum, 12hours required to complete
RCC M30 138Cum 5M+10Helper this job.

1 1C+1H Done - 20C+2H Done - 200Sqm/day.so1day


Deshuttering 216Sqm 10Sqm/day 20C+20H required to complete this job.

5th lift qty


5 1F+1 Helper done - 20F+20H done - 5MT/Day. So 5 day
Reinforcement steel 25MT 0.25MT / Day 20F+20H required to complete this job.

2 1C+1H Done - 20C+2H Done - 100Sqm/day.so 2days


Shuttering work - BGL 216Sqm 5Sqm/day 20C+20H required to complete this job
One transit mixer capacity - 6Cum &
1 Transit time - 1Hour.(We engage
2Transit mixer) Per our we get -
12cum, 12hours required to complete
RCC M30 138Cum 5M+10Helper this job.

1 1C+1H Done - 20C+2H Done - 200Sqm/day.so1day


Deshuttering 216Sqm 10Sqm/day 20C+20H required to complete this job.
QUARTERS 3rd PRIORITY (17 - 24 BLOCKS )

S.No Description of work Unit Estimated Qty Completed Balance Remarks

QUARTERS 3rd PRIORITY (17 - 24 BLOCKS )


1 Earthwork Cum 3,628.16 3,628.16 -
2 PCC for Footing Cum 67.24 67.24 -
3 RCC M25 Works - BGL Cum 263.96 263.96 -
4 Back filling Cum 3,296.92 3,296.92 -
5 Sand & Compacted Earth Filling Cum 668.92 668.92 -
6 PCC M15 Flooring Cum 178.76 178.76 -
7 RCC M25 Works - AGL Cum 979.12 979.12 -
8 Brick work 230 mm Thk Cum 952.04 952.04 -
9 Brick work 115 mm Thk Sqm 1,237.36 1,237.36 -
10 Internal Plastering Sqm 7,931.60 7,931.60 -
11 External Plastering Sqm 4,874.92 4,874.92 -
12 Ceiling Plastering Sqm 2,666.12 2,666.12 -
13 Floor Tiles Sqm 2,590.08 2,072.06 268.02
14 Wall Tiles Sqm 1,188.76 475.50 613.26
15 Staircase - Tiles Sqm 354.04 177.02 97.02
16 Internal Painting Sqm 7,931.60 6,345.28 1,186.32
17 External Painting Sqm 4,874.92 3,899.94 974.98
18 Ceiling Painting Sqm 2,666.12 2,132.90 133.22
19 Plumbing Work Block 8.00 8.00 -
20 Water Proofing Work Sqm 1,896.56 1,896.56 -
21 Plinth Pretection Cum 513.28 513.28 -35.00
22 Kitchen Top-Granite Laying Sqm 44.66 44.66 -
23 Door & Window Shutter Fixing Nos 1,021.00 800.00 221.00
24 Staircase & Verandah - Hand Rail Rmt 482.16 482.16 -
25 Gate & Window Grill works Sqm 694.56 555.65 138.91
26 Door & Window Shutter & Grill Painting Nos 1,021.00 800.00 221.00
27 Final Fitting Work Block 8.00 2.00 6.00

Manpower Unit Qty


Supervisor Nos 8.00
Painter Nos 16.00
Plumber Nos 6.00
Mason Nos 30.00
Carpenter Nos 10.00
Fitter Nos 4.00
Helper Nos 80.00
Total Manpower Nos 154.00

Machinery Unit Qty


Tractor Nos 1.00
Excavator Nos 1.00
JCB Nos -
Hywa Nos 1.00
Coal Shed A, B, C & D Grid Completed Work in progress Beam Completed 7,052.12 252 7/16/2022 3/25/2023
327.38
SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 65.61 219 8/8/2022 3/15/2023
A A OUT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date Remarks
BEAM 259.200 259.500 (+7.7TO +8.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 41 1/15/2023 2/24/2023
RR Wall 258.300 259.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 186.300 66 1/9/2023 3/15/2023
RR Wall 257.400 258.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 61 12/25/2022 2/23/2023
RR Wall 256.500 257.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 56 12/10/2022 2/3/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 21 11/25/2022 12/15/2022
RR Wall 255.300 256.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 4.010 89.060 50 9/21/2022 11/9/2022
RR Wall 254.400 255.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 4.010 66.704 50 9/14/2022 11/2/2022
RR Wall 253.500 254.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 4.010 66.704 36 9/6/2022 10/11/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 24.840 38 8/8/2022 9/14/2022
RR Wall 252.350 253.200 0.85 7.038 7.038 7.038 7.038 7.038 7.038 7.038 7.038 56.304 8 Work progress slow due to
RR Wall 251.500 252.350 0.85 7.038 7.038 14.076 8 rain
RR Wall 250.500 251.500 1 -
P.BEAM 250.200 250.500 (-.7 TO -1.00) 0.3 -
RR Wall 249.350 250.200 0.85 -
RR Wall 248.600 249.350 0.75 -
RR Wall 247.700 248.600 0.9 -
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.1 -
EXVT 247.600 247.600 0
Total Qty Total Qty 24.057 843.73
Total Nos of RR Stone Total Nos of RR Stone 67,498.00

SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 219 8/8/2022 3/15/2023


A' A' IN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date
BEAM 259.200 259.500 (+7.7TO +8.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 41 1/15/2023 2/24/2023
RR Wall 258.300 259.200 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 66 1/9/2023 3/15/2023
RR Wall 257.400 258.300 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 61 12/25/2022 2/23/2023
RR Wall 256.500 257.400 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 56 12/10/2022 2/3/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 54.000 21 11/25/2022 12/15/2022
RR Wall 255.300 256.200 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 4.010 96.836 50 9/21/2022 11/9/2022
RR Wall 254.400 255.300 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 4.010 96.836 50 9/14/2022 11/2/2022
RR Wall 253.500 254.400 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 4.010 77.396 36 9/6/2022 10/11/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 25.920 38 8/8/2022 9/14/2022 Work progress slow due to
RR Wall 252.350 253.200 0.85 6.120 6.120 6.120 6.120 24.480 8 rain
RR Wall 251.500 252.350 0.85 -
RR Wall 250.500 251.500 1 -
BEAM 250.200 250.500 (-.7 TO -1.00) 0.3 -
RR Wall 249.350 250.200 0.85 -
RR Wall 248.600 249.350 0.75 -
RR Wall 247.700 248.600 0.9 -
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.1 -
EXVT 247.600 247.600 0
Total Qty Total Qty 24.057 769.518
Total Nos of RR Stone Total Nos of RR Stone 61,561.00
Grand Total Nos of RR Stone Grand Total Nos of RR Stone 129,059.00

SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 217 8/4/2022 3/9/2023


B B OUT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date
BEAM 259.200 259.500 (+7.7TO +8.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 36 2/2/2023 3/9/2023
RR Wall 258.300 259.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 66 12/9/2022 2/12/2023
RR Wall 257.400 258.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 61 11/24/2022 1/23/2023
RR Wall 256.500 257.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 56 11/9/2022 1/3/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 21 10/25/2022 11/14/2022
RR Wall 255.300 256.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 4.010 125.591 39 9/25/2022 11/2/2022
RR Wall 254.400 255.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 4.010 104.328 39 9/10/2022 10/18/2022
RR Wall 253.500 254.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 4.010 104.328 39 8/26/2022 10/3/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.3 - 41 8/11/2022 9/20/2022
RR Wall 252.350 253.200 0.85 - 31 8/4/2022 9/3/2022 RR wall work is stopped due to
RR Wall 251.500 252.350 0.85 - 8 8/6/2022 8/13/2022 coal shifting vehicle movement
RR Wall 250.500 251.500 1 - 3 8/4/2022 8/6/2022 Coal dumpped
P.BEAM 250.200 250.500 (-.7 TO -1.00) 0.3 -
RR Wall 249.350 250.200 0.85 -
RR Wall 248.600 249.350 0.75 -
RR Wall 247.700 248.600 0.9 -
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.1 -
EXVT 247.600 247.600 0
Total Qty Total Qty 24.057 881.12
Total Nos of RR Stone Total Nos of RR Stone 70,489.00

Page 32 of 100
SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 217 8/4/2022 3/9/2023
B' B' IN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date
BEAM 259.200 259.500 (+7.7TO +8.00) 0.300 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 54.000 36 2/2/2023 3/9/2023
RR Wall 258.300 259.200 0.900 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 66 12/9/2022 2/12/2023
RR Wall 257.400 258.300 0.900 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 61 11/24/2022 1/23/2023
RR Wall 256.500 257.400 0.900 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 56 11/9/2022 1/3/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.300 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 54.000 21 10/25/2022 11/14/2022
RR Wall 255.300 256.200 0.900 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 4.010 96.836 39 9/25/2022 11/2/2022
RR Wall 254.400 255.300 0.900 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 4.010 90.720 39 9/10/2022 10/18/2022
RR Wall 253.500 254.400 0.900 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 4.010 90.720 39 8/26/2022 10/3/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.300 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 30.240 41 8/11/2022 9/20/2022 RR wall work is stopped due to
RR Wall 252.350 253.200 0.850 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 79.560 31 8/4/2022 9/3/2022 coal shifting vehicle movement
RR Wall 251.500 252.350 0.850 -
RR Wall 250.500 251.500 1.000 -
BEAM 250.200 250.500 (-.7 TO -1.00) 0.300 -
RR Wall 249.350 250.200 0.850 -
RR Wall 248.600 249.350 0.750 -
RR Wall 247.700 248.600 0.900 -
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.100 -
EXVT 247.600 247.600 0
Total Qty Total Qty 24.057 831.807
Total Nos of RR Stone Total Nos of RR Stone 66,545.00
Grand Total Nos of RR Stone Grand Total Nos of RR Stone 137,034.00

SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 222 8/12/2022 3/22/2023


C C OUT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date
BEAM 259.200 259.500 (+7.7TO +8.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 36 2/15/2023 3/22/2023
RR Wall 258.300 259.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 66 12/22/2022 2/25/2023
RR Wall 257.400 258.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 61 12/7/2022 2/5/2023
RR Wall 256.500 257.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 56 11/22/2022 1/16/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 21 11/7/2022 11/27/2022
RR Wall 255.300 256.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 4.010 132.678 39 10/8/2022 11/15/2022
RR Wall 254.400 255.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 4.010 104.328 39 9/23/2022 10/31/2022
RR Wall 253.500 254.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 4.010 104.328 39 9/8/2022 10/16/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 29.808 41 8/24/2022 10/3/2022
RR Wall 252.350 253.200 0.85 7.038 7.038 7.038 7.038 7.038 7.038 7.038 7.038 7.038 7.038 7.038 77.418 36 8/12/2022 9/16/2022
RR Wall 251.500 252.350 0.85 -
RR Wall 250.500 251.500 1 -
P.BEAM 250.200 250.500 (-.7 TO -1.00) 0.3 -
RR Wall 249.350 250.200 0.85 -
RR Wall 248.600 249.350 0.75 -
RR Wall 247.700 248.600 0.9 -
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.1 -
EXVT 247.600 247.600 0
Total Qty Total Qty 24.057 965.62
Total Nos of RR Stone Total Nos of RR Stone 77,250.00

SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 230 8/4/2022 3/22/2023


C' C' IN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date
BEAM 259.200 259.500 (+7.7TO +8.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 54.000 36 2/15/2023 3/22/2023
RR Wall 258.300 259.200 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 66 12/22/2022 2/25/2023
RR Wall 257.400 258.300 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 61 12/7/2022 2/5/2023
RR Wall 256.500 257.400 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 56 11/22/2022 1/16/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 54.000 21 11/7/2022 11/27/2022
RR Wall 255.300 256.200 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 4.010 96.836 39 10/8/2022 11/15/2022
RR Wall 254.400 255.300 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 4.010 90.720 39 9/23/2022 10/31/2022
RR Wall 253.500 254.400 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 4.010 90.720 39 9/8/2022 10/16/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 28.080 41 8/24/2022 10/3/2022
RR Wall 252.350 253.200 0.85 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 6.120 67.320 36 8/12/2022 9/16/2022
RR Wall 251.500 252.350 0.85 6.120 6.120 12.240 5 8/4/2022 8/8/2022 Work delayed due to rain
RR Wall 250.500 251.500 1 -
BEAM 250.200 250.500 (-.7 TO -1.00) 0.3 -
RR Wall 249.350 250.200 0.85 -
RR Wall 248.600 249.350 0.75 -
RR Wall 247.700 248.600 0.9 -
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.1 -
EXVT 247.600 247.600 0
Total Qty Total Qty 24.057 831.81
Total Nos of RR Stone Total Nos of RR Stone 66,545.00
Grand Total Nos of RR Stone Grand Total Nos of RR Stone 143,795.00

SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 236 8/1/2022 3/25/2023

Page 33 of 100
D D IN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date
BEAM 259.200 259.500 (+7.7TO +8.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 30 2/24/2023 3/25/2023
RR Wall 258.300 259.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 55 1/24/2023 3/19/2023
RR Wall 257.400 258.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 61 1/4/2023 3/5/2023
RR Wall 256.500 257.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 7.088 4.010 182.291 56 12/15/2022 2/8/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.3 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 2.484 62.100 27 11/25/2022 12/21/2022
RR Wall 255.300 256.200 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 7.452 4.010 104.328 47 11/10/2022 12/26/2022
RR Wall 254.400 255.300 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 4.010 52.164 46 10/21/2022 12/5/2022
RR Wall 253.500 254.400 0.9 7.452 7.452 7.452 7.452 7.452 7.452 7.452 4.010 52.164 45 10/1/2022 11/14/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.3 2.484 2.484 2.484 2.484 2.484 12.420 25 9/11/2022 10/5/2022
RR Wall 252.350 253.200 0.85 7.038 2.754 7.038 43 8/22/2022 10/3/2022
RR Wall 251.500 252.350 0.85 7.038 2.754 7.038 42 8/13/2022 9/23/2022
RR Wall 250.500 251.500 1 8.280 3.240 8.280 46 8/6/2022 9/20/2022
P.BEAM 250.200 250.500 (-.7 TO -1.00) 0.3 2.484 2.484 23 8/1/2022 8/23/2022
RR Wall 249.350 250.200 0.85 -
RR Wall 248.600 249.350 0.75 -
RR Wall 247.700 248.600 0.9 -
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.1 -
EXVT 247.600 247.600 0
Total RR Qty Total RR Qty 777.884
Total Nos of RR Stone Total Nos of RR Stone 62,231.00

SL NO DESCRIPTION LEVEL LEVEL LEVEL GRID 252 7/16/2022 3/25/2023


D' D' OUT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Column Balance Qty in Cum Duration Start Date End Date
BEAM 259.200 259.500 (+7.7TO +8.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 54.000 30 2/24/2023 3/25/2023
RR Wall 258.300 259.200 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 55 1/24/2023 3/19/2023
RR Wall 257.400 258.300 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 61 1/4/2023 3/5/2023
RR Wall 256.500 257.400 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116 4.010 157.991 56 12/15/2022 2/8/2023
BEAM 256.200 256.500 (+4.7TO +5.00) 0.3 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 2.160 54.000 27 11/25/2022 12/21/2022
RR Wall 255.300 256.200 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 4.010 90.720 47 11/10/2022 12/26/2022
RR Wall 254.400 255.300 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 4.010 90.720 46 10/21/2022 12/5/2022
RR Wall 253.500 254.400 0.9 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 4.010 64.800 45 10/1/2022 11/14/2022
BEAM 253.200 253.500 (+1.7TO +2.00) 0.3 2.160 2.160 2.160 2.160 2.160 10.800 25 9/11/2022 10/5/2022
RR Wall 252.350 253.200 0.85 6.120 2.754 6.120 43 8/22/2022 10/3/2022
RR Wall 251.500 252.350 0.85 6.120 2.754 6.120 42 8/13/2022 9/23/2022
RR Wall 250.500 251.500 1 7.200 1.215 7.200 46 8/6/2022 9/20/2022
BEAM 250.200 250.500 (-.7 TO -1.00) 0.3 2.160 2.160 23 8/1/2022 8/23/2022 work delayed due to Heavy
RR Wall 249.350 250.200 0.85 6.120 6.120 30 7/30/2022 8/28/2022 rain fall
RR Wall 248.600 249.350 0.75 5.400 5.400 40 7/24/2022 9/1/2022
RR Wall 247.700 248.600 0.9 6.480 6.480 29 7/16/2022 8/13/2022
P.C.C 247.600 247.700 (-3.0 TO -2.9) 0.1 -
EXVT 247.600 247.600 0
Total RR Qty Total RR Qty 30.78 757.652
Total Nos of RR Stone - 80 Nos/Cum Total Nos of RR Stone 60,612.00
Grand Total Nos of RR Stone Grand Total Nos of RR Stone 122,843.00
CON WORKER CUM

Available at Balance required


S.No Description Unit Required Qty site Qty at site Qty 4M 4 BEAM WORK AND BACK FILLING
1 Supervisor Nos 2.00
2 Mason Nos 60.00 44.00 16.00 H 8
3 Carpenter Nos 8.00 - 8.00
4 Fitter Nos 8.00 - 8.00
5 Helper Nos 152.00 112.00 40.00

RR Stones - 80
Nos/Cum (230mm x
6 230mm x 200mm) Nos 586,005.00 17,500.00 568,505.00
7 JCB Nos 1.00
Excavator 1.00
Hywa 2.00
Water Tanker 1.00

Page 34 of 100
Structure : Coal shed PROCESS SHEET
Work : RR wall weekly work Sheet
Working Details for (GRID A 16 TO 20 ) (B16 TO 25)( C16 TO 25) (D 14 TO 25)
BACK FILLING
RR WORK STEEL IN SHUTTERING RCC IN BOTTOM
WORK DETAILS IN CUM KG IN SQM CUM
WITH WATER PLUM CC PCC
LEVEL
TOP LEVEL HEIGHT REMARKS
S.No Date Mason Carpenter Fitter Helper COMPACTION
NOS L B H Qty Qty Qty Qty Qty Qty
1 12/1/2022 50 5 1 120 1 150 0.45 0.9 61 0.20 25.29 2 44 22 253.500 256.150 2.65
2 12/2/2022 51 5 1 120 1 200 0.45 0.75 68 0.25 26.10 4 44 0 253.500 256.150 2.65 staging=(64cum) with shifting
3 12/3/2022 50 5 1 120 1 200 0.45 0.75 68 0.23 12.96 2 44 33 staging=(68cum) with shifting
4 12/4/2022 0 5 1 120 1 0 0.45 0.9 0 - 0 44 0
5 12/5/2022 50 5 1 120 1 145 0.45 0.9 59 - 19.44 2 44 22 253.500 254.950 1.45 staging=(96cum) with shifting
6 12/6/2022 50 5 1 120 1 130 0.45 0.9 53 0.11 0.00 4 44 0 253.500 256.150 2.65 staging=(64cum) with shifting
7 12/7/2022 51 5 1 120 1 145 0.45 0.9 59 0.15 48.61 2 44 33 253.500 256.150 2.65
8 12/8/2022 50 5 1 120 1 155 0.45 0.9 63 0.19 4 44 253.500 256.150 2.65
9 12/9/2022 53 5 1 120 1 125 0.45 0.9 51 - 2 44 22 253.500 254.950 1.45
10 12/10/2022 50 5 1 120 1 175 0.45 0.75 59 0.27 4 44 253.500 256.150 2.65 staging=(96cum) with shifting
11 12/11/2022 0 5 1 120 1 0 0.45 0.9 0 - 44
12 12/12/2022 50 5 1 120 1 130 0.45 0.9 53 0.76 2 44 33 253.500 254.950 1.45
13 12/13/2022 50 5 1 120 1 165 0.45 0.75 56 0.76 4 44 253.500 256.150 2.65 staging=(96cum) with shifting
14 12/14/2022 52 5 1 120 1 125 0.45 0.9 51 0.76 2 44 22 253.500 254.950 1.45
15 12/15/2022 50 5 1 120 1 130 0.45 0.9 53 0.76 4 44 253.500 256.150 2.65 staging=(96cum) with shifting

657 1800 750 4.44 132.40 17 655 190 0 12.05 APPROX LENGTH (100 TO 120 RMT)
work done of 2 week 551 6.53 391.24 70 1023 73 6
balance qty for 1 week -199 2 259 53 368 -117 6
ABSTARACT
# Mason utilization @ 51/ day
# Helper utilization @ 120/ day ( i/c @ 3 helper / Mason) due to height (+2 mtr to +5mtr)
# Total man power proposed to be engaged @ 170 / day
# Output RR Work @ 375 cum / Week
# Output RR Work @ 58 cum / day
# Output mason @ 1.1 cum / day
# Output shuttering @ 10 Sqm / day ( mason gang can do the shuttering )
# Output Steel @ 0.35 Mt / day
# Output concrete @ 15 Cum / day
# Output back filling @ 44 Cum / day ( Ash and soil filling)
Coal Transporation Road

Completed Qty
BOQ Qty (Rmt) 1232 (Rmt) 810 Balance Qty (Rmt) 422

Qty
S.No Description of work Unit Remarks
Estimated Qty Completed Balance

Coal Transportation Road - 1232 Rmt


1 Excavation Cum 6,776.00 6,776.00 -
2 Carting Away Cum 6,776.00 6,776.00 -
3 Embankment Formation Cum 15,287.00 3,500.00 11,787.00
4 GSB Cum 3,080.00 1,750.00 1,330.00
810 Rmt completed
5 WMM Cum 2,464.00 1,400.00 1,064.00 out of 1232Rmt
6 Shuttering Bgl Sqm 1,108.80 630.00 478.80
7 Reinforcement MT 2.50 1.42 1.08
8 Expansion Board Fixing Sqm 594.60 337.84 256.76
9 CC M35 Cum 2,772.00 1,575.00 1,197.00
10 Shoulder Cum 1,108.80 630.00 478.80

Road from Part-C to New parking yard-700 Rmt (Part-1)

S.No Description of work Unit Qty Duration (Days) Start Date Finish Date Remarks
Work considering for 700 Rmt 27 12/8/2022 1/4/2023
1 GSB Cum 1,750.00 18 12/8/2022 12/26/2022
2 WMM Cum 1,400.00 18 12/9/2022 12/27/2022 Completed
3 CC Cum 1,575.00 27 12/8/2022 1/4/2023
4 Hard Shoulder Cum 630.00 8 1/4/2023 1/12/2023

Road from New parking yard to New weigh Bridge-532 Rmt (Part-2)

S.No Description of work Unit Qty Duration (Days) Start Date Finish Date Remarks
Work considering for 532 Rmt 38 1/6/2023 2/13/2023
1 Embankment Formation Cum 14,517.00 21 1/6/2023 1/27/2023
2 Subgrade (300mm tk) Cum 2,394.00 7 1/21/2023 1/28/2023 Embankment
formation under
3 GSB Cum 1,330.00 8 1/28/2023 2/5/2023 progress (5150 Cum
4 WMM Cum 1,064.00 7 2/2/2023 2/9/2023 completed)
5 CC M35 Cum 1,197.00 10 2/3/2023 2/13/2023
6 Hard Shoulder Cum 478.80 8 2/10/2023 2/18/2023

Manpower Unit Qty


Supervisor Nos -
Mason Nos 2.00
Carpenter Nos 1.00
Fitter Nos -
Helper Nos 8.00
Total Manpower Nos 11.00

Page 36 of 100
Inplant Road

Budget Approval (Rmt) 2938 Completed (Rmt) 2758 Balance (Rmt) 180

Estimated Completed
S.No Description Unit Balance Qty Duration (Days) Start Date Finish Date Remarks
Qty Qty
INPLANT ROAD WORK - 2938.185 RMT 97 9/26/2022 1/18/2023
Road No. 97 (Cooling Tower
Road upto Fire & Safety Office) -
1 11 days 10/15/2022 10/26/2022 Completed
5.0 Mtr Width of length 148.147
Rmt

Road No. 93 (Safety office to


chlorination Building connecting
2 9 days 10/29/2022 11/8/2022 Completed
road) - 5.0 Mtr Width of length
282.854 Rmt

Reservoir Ourter Road - 10.0 Mtr


3 29 days 10/28/2022 11/30/2022 Completed
Width of length is 202.823 Rmt

Road No. 09 (Admin road to


4 Hydrogen Building) - 7.5 Mtr 27 days 10/11/2022 11/18/2022 Completed
Width of length 263.57 Rmt

Road No. 94 & 95 (Chlorination &


Hydrogen Building Outer Road) -
5 16 days 11/19/2022 12/7/2022 Completed
3.5 Mtr Width of length is 181.713
Rmt

Road No. 91 & 92 (Intermediate


6 Road) - 3.5 Mtr Width & Length is 10 days 11/26/2022 12/5/2022 Completed
93.4 Rmt

Road No. 03 & 04 (Coal shed


7 outer Road) - 10.0 Mtr Width of 64 days 11/5/2022 1/18/2023 Completed
length is 672.044 Rmt

P&M workshop Road from Main


8 Gate - 10.0 Mtr Width of length is 22 days 11/22/2022 12/16/2022 Completed
176.871 Rmt

P&M workshop & ETP Road - 7.0


9 Mtr Width of length is 277.262 23 days 11/28/2022 12/23/2022 Completed
Rmt

Gate No. 03 to Silo connecting


Road - 10.0 Mtr Width of length 80
10 15 days 12/5/2022 12/21/2022 Completed
Rmt & Labour colony 3 mtr width
and 50 mtr length of road

Gate No. 03 connecting road to


11 Silo - 7.0 Mtr Width of length is 31 days 12/10/2022 1/14/2023 Work in Progress
300.569 Rmt
EarthWork Excavation Cum 425.45 425.450 0.000 3 days 12/10/2022 12/13/2022

Carting away of surplus earth Cum 425.45 425.450 0.000 3 days 12/10/2022 12/13/2022

Embankment filling Cum 6200 6200.000 0.000 5 days 12/14/2022 12/19/2022


GSB - Ready Mix Cum 676.28 270.00 406.280 4 days 12/20/2022 12/23/2022
WMM - Ready Mix Cum 541.024 216.00 325.024 4 days 12/24/2022 12/28/2022
LHS - 3.5 Mtr Width 0.000 4 days 12/29/2022 1/2/2023 Excavator -1 Nos
Hywa- 4 Nos
Shuttering Sqm 151 60.29 90.710 4 days 12/29/2022 1/2/2023 01. Excavator = 55
Dowel Bars MT 1.08 0.43 0.650 4 days 12/29/2022 1/2/2023 Cum/Hr,
02. Hywa (10 wheel)
Joint Sheet Rmt 195.78 78.16 117.620 4 days 12/29/2022 1/2/2023
Capacity = 10 Cum
CC Road - M35 Cum 315.59 126 189.590 4 days 12/29/2022 1/2/2023 03. Transporataion time
RHS - 3.5 Mtr Width 0.000 4 days 1/3/2023 1/6/2023 of Hywa 1 Hour
04.Hywa - 100 cum per
Shuttering Sqm 151 60.29 90.710 4 days 1/3/2023 1/6/2023 day
Dowel Bars MT 1.08 0.43 0.650 4 days 1/3/2023 1/6/2023
Joint Sheet Rmt 195.78 78.16 117.620 4 days 1/3/2023 1/6/2023
CC Road - M35 Cum 315.59 126 189.590 4 days 1/3/2023 1/6/2023
Groove Cutting Rmt 391.569 156.33 235.239 7 days 1/7/2023 1/14/2023

Hard Shoulder - Murram Laying Cum 180.341 180.341 7 days 1/7/2023 1/14/2023

Road No. 81 (Inbetween of


12 Chimney) - 5.0 Mtr Width of length 15 days 12/14/2022 12/31/2022 Completed
is 209.092 Rmt
Estimated Completed
S.No Description Unit Balance Qty Duration (Days) Start Date Finish Date Remarks
Qty Qty

Hard Shoulder - Murram Laying Cum 125.455 125.455 - 6 days 12/26/2022 12/31/2022

Manpower Unit Qty


Supervisor Nos -
Mason Nos 2.00
Carpenter Nos 1.00
Fitter Nos -
Helper Nos 8.00
Total Manpower Nos 11.00

Machinery Unit Qty


Excavator Nos 1.00
JCB Nos 1.00
Grader Nos 1.00
Roller Nos 1.00
Hywa Nos 4.00
Inplant Road
Budget approval 5.6 Km - Completed & Balance of 2938.185 Rmt is completed is 1082.194 & Balance 1855.991 expect to be completed on 18.01.2023

Estimated Completed Balance Duration


S.No Description Unit Start Date Finish Date
Qty Qty Qty (Days)
INPLANT ROAD WORK - 2938.185 R 97 9/26/2022 1/18/2023
Road No. 97 (Cooling Tower
Road upto Fire & Safety Office) -
11 days 10/15/2022 10/26/2022 Completed
5.0 Mtr Width of length 148.147
Rmt

Road No. 93 (Safety office to


chlorination Building connecting 9 days 10/29/2022 11/8/2022
road) - 5.0 Mtr Width of length Completed
282.854 Rmt

Reservoir Ourter Road - 10.0 Mtr


29 days 10/28/2022 11/30/2022 Completed
Width of length is 202.823 Rmt

Road No. 09 (Admin road to


Hydrogen Building) - 7.5 Mtr 27 days 10/11/2022 11/18/2022 Completed
Width of length 263.57 Rmt

Road No. 94 & 95 (Chlorination &


Hydrogen Building Outer Road) -
3.5 Mtr Width of length is 181.713 16 days 11/19/2022 12/7/2022 Work In Progress
Rmt
01. Excavator = 55 Cum/Hr
02. Hywa (10 wheel) Capacity = 10 Cum
03. Transporataion time of Hywa 1
Hour
EarthWork Excavation Cum 749.566 749.566 0.000 5 days 11/19/2022 11/25/2022 04. 04 Nos of Hywa 6 Trips/Hr

Carting away of surplus earth Cum 749.566 749.566 0.000 5 days 11/19/2022 11/25/2022
GSB - Ready Mix Cum 249.855 249.855 2 days 11/26/2022 11/27/2022
WMM - Ready Mix Cum 199.884 199.884 2 days 11/28/2022 11/29/2022
Shuttering Sqm 174.042 174.042 2 days 31-11-2022 12/1/2022
Dowel Bars MT 0.806 0.806 2 days 31-11-2022 12/1/2022
Joint Sheet Rmt 209.713 209.713 2 days 31-11-2022 12/1/2022
CC Road - M35 Cum 190.799 190.799 2 days 31-11-2022 12/1/2022
Groove Cutting Rmt 209.713 209.713 3 days 12/2/2022 12/4/2022

Hard Shoulder - Murram Laying Cum 109.028 109.028 5 days 12/2/2022 12/7/2022

Road No. 91 & 92 (Intermediate


Road) - 3.5 Mtr Width & Length is 10 days 11/26/2022 12/5/2022
93.4 Rmt
EarthWork Excavation Cum 384.615 384.615 2 days 11/26/2022 11/27/2022
Carting away of surplus earth Cum 384.615 384.615 2 days 11/26/2022 11/27/2022
GSB - Ready Mix Cum 128.205 128.205 2 days 11/28/2022 11/29/2022
WMM - Ready Mix Cum 102.564 102.564 1 day 31-11-2022 31-11-2022
Shuttering Sqm 92.316 92.316 2 days 12/1/2022 12/2/2022
Dowel Bars MT 0.408 0.408 2 days 12/1/2022 12/2/2022
Joint Sheet Rmt 107.24 107.240 2 days 12/1/2022 12/2/2022
CC Road - M35 Cum 97.902 97.902 2 days 12/1/2022 12/2/2022
Groove Cutting Rmt 107.24 107.240 2 days 12/3/2022 12/4/2022
Hard Shoulder - Murram Laying Cum 55.944 55.944 3 days 12/3/2022 12/5/2022

Road No. 03 & 04 (Coal shed


outer Road) - 10.0 Mtr Width of 64 days 11/5/2022 1/18/2023 Work In Progress
length is 672.044 Rmt
EarthWork Excavation Cum 6048.396 6048.396 0.000 14 days 11/5/2022 11/21/2022
Carting away of surplus earth Cum 6048.396 6048.396 0.000 14 days 11/5/2022 11/21/2022
GSB - Ready Mix Cum 2016.132 1003.632 1012.500 8 days 11/22/2022 11/30/2022
WMM - Ready Mix Cum 1612.906 872.906 740.000 7 days 12/1/2022 12/8/2022
LHS-5.00 Mtr Width 0.000 10 days 12/9/2022 12/20/2022
Shuttering Sqm 345.92 97.895 248.025 10 days 12/9/2022 12/20/2022
Dowel Bars MT 3.01 0.852 2.158 10 days 12/9/2022 12/20/2022
Joint Sheet Rmt 471.022 133.299 337.723 10 days 12/9/2022 12/20/2022
CC Road - M35 Cum 1008.06 482.25 525.810 10 days 12/9/2022 12/20/2022
RHS-5.00 Mtr Width 0.000 10 days 12/21/2022 12/31/2022
Shuttering Sqm 345.92 97.895 248.025 10 days 12/21/2022 12/31/2022
Dowel Bars MT 3.01 0.852 2.158 10 days 12/21/2022 12/31/2022
Joint Sheet Rmt 471.022 133.299 337.723 10 days 12/21/2022 12/31/2022
CC Road - M35 Cum 1008.06 482.25 525.810 10 days 12/21/2022 12/31/2022
Groove Cutting Rmt 942.044 942.044 15 days 1/2/2023 1/18/2023
Hard Shoulder - Murram Laying Cum 403.226 200 203.226 10 days 1/2/2023 1/12/2023

P&M workshop Road from Main


Gate - 10.0 Mtr Width of length is 22 days 11/22/2022 12/16/2022
176.871 Rmt
EarthWork Excavation Cum 1591.839 1591.839 5 days 11/22/2022 11/26/2022
Carting away of surplus earth Cum 1591.839 1591.839 5 days 11/22/2022 11/26/2022
GSB - Ready Mix Cum 530.613 530.613 3 days 11/28/2022 11/30/2022
WMM - Ready Mix Cum 424.49 424.490 3 days 12/1/2022 12/3/2022
LHS-5.00 Mtr Width 0.000 3 days 12/5/2022 12/7/2022
Shuttering Sqm 94.592 94.592 3 days 12/5/2022 12/7/2022
Estimated Completed Balance Duration
S.No Description Unit Start Date Finish Date
Qty Qty Qty (Days)
Dowel Bars MT 0.8745 0.875 3 days 12/5/2022 12/7/2022
Joint Sheet Rmt 128.435 128.435 3 days 12/5/2022 12/7/2022
CC Road - M35 Cum 265.306 265.306 3 days 12/5/2022 12/7/2022
RHS-5.00 Mtr Width 0.000 3 days 12/8/2022 12/10/2022
Shuttering Sqm 94.592 94.592 3 days 12/8/2022 12/10/2022
Dowel Bars MT 0.8745 0.875 3 days 12/8/2022 12/10/2022
Joint Sheet Rmt 128.435 128.435 3 days 12/8/2022 12/10/2022
CC Road - M35 Cum 265.306 265.306 3 days 12/8/2022 12/10/2022
Groove Cutting Rmt 256.871 256.871 5 days 12/12/2022 12/16/2022
Hard Shoulder - Murram Laying Cum 106.123 106.123 5 days 12/12/2022 12/16/2022

P&M workshop & ETP Road - 7.0


Mtr Width of length is 277.262 23 days 11/28/2022 12/23/2022
Rmt
EarthWork Excavation Cum 1871.519 1871.519 6 days 11/28/2022 12/3/2022
Carting away of surplus earth Cum 1871.519 1871.519 6 days 11/28/2022 12/3/2022
GSB - Ready Mix Cum 623.84 623.840 3 days 12/5/2022 12/7/2022
WMM - Ready Mix Cum 499.072 499.072 3 days 12/8/2022 12/10/2022
LHS-3.50 Mtr Width 0.000 3 days 12/12/2022 12/14/2022
Shuttering Sqm 139.46 139.460 3 days 12/12/2022 12/14/2022
Dowel Bars MT 0.997 0.997 3 days 12/12/2022 12/14/2022
Joint Sheet Rmt 180.631 180.631 3 days 12/12/2022 12/14/2022
CC Road - M35 Cum 291.125 291.125 3 days 12/12/2022 12/14/2022
RHS-3.50 Mtr Width 0.000 3 days 12/15/2022 12/17/2022
Shuttering Sqm 139.46 139.460 3 days 12/15/2022 12/17/2022
Dowel Bars MT 0.997 0.997 3 days 12/15/2022 12/17/2022
Joint Sheet Rmt 180.631 180.631 3 days 12/15/2022 12/17/2022
CC Road - M35 Cum 291.125 291.125 3 days 12/15/2022 12/17/2022
Groove Cutting Rmt 361.262 361.262 4 days 12/19/2022 12/22/2022
Hard Shoulder - Murram Laying Cum 166.357 166.357 5 days 12/19/2022 12/23/2022

Gate No. 03 to Silo connecting


Road - 10.0 Mtr Width of length 80
15 days 12/5/2022 12/21/2022
Rmt & Labour colony 3 mtr width
and 50 mtr length of road
EarthWork Excavation Cum 907.5 907.500 5 days 12/5/2022 12/9/2022
Carting away of surplus earth Cum 907.5 907.500 5 days 12/5/2022 12/9/2022
GSB - Ready Mix Cum 302.5 302.500 3 days 12/10/2022 12/13/2022
WMM - Ready Mix Cum 242 242.000 2 days 12/14/2022 12/15/2022
10.0 Mtr Width of length 80
0.000 4 days 12/16/2022 12/20/2022
Rmt
LHS-5.00 Mtr Width 0.000 2 days 12/16/2022 12/17/2022
Shuttering Sqm 45 45.000 2 days 12/16/2022 12/17/2022
Dowel Bars MT 0.43 0.430 2 days 12/16/2022 12/17/2022
Joint Sheet Rmt 60 60.000 2 days 12/16/2022 12/17/2022
CC Road - M35 Cum 120 120.000 2 days 12/16/2022 12/17/2022
RHS-5.00 Mtr Width 0.000 4 days 12/16/2022 12/20/2022
Shuttering Sqm 45 45.000 2 days 12/19/2022 12/20/2022
Dowel Bars MT 0.43 0.430 2 days 12/16/2022 12/17/2022
Joint Sheet Rmt 60 60.000 2 days 12/16/2022 12/17/2022
CC Road - M35 Cum 120 120.000 2 days 12/16/2022 12/17/2022
Labour colony 3 mtr width and
0.000 1 day 12/19/2022 12/19/2022
50 mtr length of road
Shuttering Sqm 48.6 48.600 1 day 12/19/2022 12/19/2022
Dowel Bars MT 0.188 0.188 1 day 12/19/2022 12/19/2022
Joint Sheet Rmt 56 56.000 1 day 12/19/2022 12/19/2022
CC Road - M35 Cum 45 45.000 1 day 12/19/2022 12/19/2022
Groove Cutting Rmt 176 176.000 1 day 12/20/2022 12/20/2022
Hard Shoulder - Murram Laying Cum 78 78.000 2 days 12/20/2022 12/21/2022

Gate No. 03 connecting road to


Silo - 7.0 Mtr Width of length is 31 days 12/10/2022 1/14/2023
300.569 Rmt
EarthWork Excavation Cum 425.45 425.450 3 days 12/10/2022 12/13/2022
Carting away of surplus earth Cum 425.45 425.450 3 days 12/10/2022 12/13/2022
Embankment filling Cum 6200 6200.000 5 days 12/14/2022 12/19/2022
GSB - Ready Mix Cum 676.28 676.280 4 days 12/20/2022 12/23/2022
WMM - Ready Mix Cum 541.024 541.024 4 days 12/24/2022 12/28/2022
LHS - 3.5 Mtr Width 0.000 4 days 12/29/2022 1/2/2023
Shuttering Sqm 151 151.000 4 days 12/29/2022 1/2/2023
Dowel Bars MT 1.08 1.080 4 days 12/29/2022 1/2/2023
Joint Sheet Rmt 195.78 195.780 4 days 12/29/2022 1/2/2023
CC Road - M35 Cum 315.59 315.590 4 days 12/29/2022 1/2/2023
RHS - 3.5 Mtr Width 0.000 4 days 1/3/2023 1/6/2023
Shuttering Sqm 151 151.000 4 days 1/3/2023 1/6/2023
Dowel Bars MT 1.08 1.080 4 days 1/3/2023 1/6/2023
Joint Sheet Rmt 195.78 195.780 4 days 1/3/2023 1/6/2023
CC Road - M35 Cum 315.59 315.590 4 days 1/3/2023 1/6/2023
Groove Cutting Rmt 391.569 391.569 7 days 1/7/2023 1/14/2023
Hard Shoulder - Murram Laying Cum 180.341 180.341 7 days 1/7/2023 1/14/2023

Road No. 81 (Inbetween of


Chimney) - 5.0 Mtr Width of length 15 days 12/14/2022 12/31/2022
is 209.092 Rmt
EarthWork Excavation Cum 1097.733 1097.733 5 days 12/14/2022 12/19/2022
Carting away of surplus earth Cum 1097.733 1097.733 5 days 12/14/2022 12/19/2022
GSB - Ready Mix Cum 365.911 365.911 2 days 12/20/2022 12/21/2022
WMM - Ready Mix Cum 292.729 292.729 2 days 12/22/2022 12/23/2022
Shuttering Sqm 141.955 141.955 3 days 12/24/2022 12/27/2022
Dowel Bars MT 1.157 1.157 3 days 12/22/2022 12/24/2022
Estimated Completed Balance Duration
S.No Description Unit Start Date Finish Date
Qty Qty Qty (Days)
Joint Sheet Rmt 254.092 254.092 3 days 12/22/2022 12/24/2022
CC Road - M35 Cum 313.638 313.638 3 days 12/22/2022 12/24/2022
Groove Cutting Rmt 254.092 254.092 4 days 12/26/2022 12/29/2022
Hard Shoulder - Murram Laying Cum 125.455 125.455 6 days 12/26/2022 12/31/2022
Manpower & Machinery
Unit Qty
Available at site
1 Supervisor Nos -
Mason Nos -
Carpenter Nos -
Fitter Nos -
Helper Nos -
Excavator Nos 1.00
JCB Nos 1.00
Grader Nos 1.00
Roller Nos 1.00
Hywa Nos 4.00
TG BALANCE WORK

Qty
S.No Description of work Unit Estimated
Completed Balance
Qty Remarks
TG BALANCE WORK
1 IPS Flooring - 6.3 Mtr sqm 1,355.10 1,355.10 -
2 Waterproofing - 18.9 Mtr Floor sqm 1,205.31 1,205.31 -
Cleaning sqm 1,205.31 1,205.31 -
1st coat waterproofing sqm 1,205.31 1,205.31 -
2nd coat waterproofing sqm 1,205.31 1,205.31 -
Final coat waterproofing sqm 1,205.31 1,205.31 -
7 screed concrete - 18.9 Mtr Floor sqm 1,205.31 1,205.31 -
8 Waterproofing - 25.2 Mtr Roof
Cleaning sqm 1050.55 1,050.55 -
1st coat waterproofing sqm 1050.55 1,050.55 -
2nd coat waterproofing sqm 1050.55 1,050.55 -
Final coat waterproofing sqm 1050.55 1,050.55 -
13 screed concrete - 25.2 Mtr Roof sqm 1050.55 1,050.55 -
14 External Plastering sqm 4,218.81 3,848.02 370.79 TG-03 & TG-04
15 Internal Plastering sqm 1,039.57 1,039.57 -

SCHEDULE

S.No Description of work Unit Balance Duration Start Date Finish Date Remarks

Mason-02, Helper - 08
01. Staging - (10 x 17 mtr) - 02 Days
1 External Plastering 10 11/16/2022 11/26/2022 02. Plastering - 30 Sqm/day
TG - 03 (Balance Plastering 1230.899 Sqmt) -
Plastering Grid C 18'-27 (6.00 mtr to 17.00 mtr
lvl)
Plastering Grid C 19 - 25 Sqm
TG - 04 (Balance Plastering 1200 Sqmt)

Plastering of Grid 27'-34 Sqm 370.79 10 11/16/2022 11/26/2022

S.No Manpower & Machinery Available at site Unit Qty

1 Supervisor Nos -
Mason Nos -
Carpenter Nos -
Fitter Nos -
Helper Nos -
WAGON TIPPLER
SCHEDULE

S.No Description of work Unit Balance Duration Start Date Finish Date Remarks
Wagon Tippler 114 days 11/17/2022 3/29/2023
A Side 62 days 11/17/2022 1/27/2023
Empty side arm charger 41 days 11/17/2022 1/3/2023
27 Rmt from Grid 14 -
8 days 11/17/2022 11/25/2022
depth 1.1 Mtr
Shuttering BGL Sqm 0 3 days 11/17/2022 11/19/2022
Bolt Fixing LS 0 2 days 11/21/2022 11/22/2022
Concrete Cum 0 1 day 11/23/2022 11/23/2022
Deshuttering Sqm 0 2 days 11/24/2022 11/25/2022
30 Rmt From Grid 4 33 days 11/26/2022 1/3/2023
Excavation 0 to 2 mtr Cum 0 1 day 11/26/2022 11/26/2022
Excavation 2 to 4 mtr Cum 0 1 day 11/28/2022 11/28/2022

Plumn concrete Cum 0 2 days 11/29/2022 11/30/2022

Footing - 30 Rmt 11 days 12/1/2022 12/13/2022

Reinforcement work MT 5.935 5 days 12/1/2022 12/6/2022

Shuttering BGL Sqm 79.68 2 days 12/7/2022 12/8/2022

Concrete Cum 115.2 2 days 12/9/2022 12/10/2022

Deshuttering Sqm 79.68 2 days 12/12/2022 12/13/2022

Pedestal upto 1.25 Mtr


10 days 12/14/2022 12/24/2022
depth
Reinforcement work MT 5.935 3 days 12/14/2022 12/16/2022
Shuttering BGL Sqm 80 3 days 12/17/2022 12/20/2022
Concrete Cum 115.2 2 days 12/21/2022 12/22/2022
Deshuttering Sqm 80 2 days 12/23/2022 12/24/2022
Pedestal 30 Rmt length
8 days 12/26/2022 1/3/2023
and 1.0 Mtr depth
Shuttering BGL Sqm 116 3 days 12/26/2022 12/28/2022
Bolt Fixing LS 1 2 days 12/29/2022 12/30/2022
Concrete Cum 60 2 days 12/31/2022 1/2/2023
Deshuttering Sqm 116 1 day 1/3/2023 1/3/2023

Railway Empty wagon - 26


32 days 12/1/2022 1/6/2023
Mtr Balance
Plumb concrete Cum 33.28 1 day 12/1/2022 12/1/2022
Footing (3 x 1.2) 11 days 12/2/2022 12/14/2022
Reinforcement work MT 2.371 5 days 12/2/2022 12/7/2022
Shuttering Sqm 69.6 2 days 12/8/2022 12/9/2022
Concrete Cum 99.84 2 days 12/10/2022 12/12/2022
Deshuttering Sqm 69.6 2 days 12/13/2022 12/14/2022
Pedestal upto 1.25 Mtr
10 days 12/15/2022 12/26/2022
depth
Reinforcement work MT 3.557 3 days 12/15/2022 12/17/2022
Shuttering BGL Sqm 72.5 3 days 12/19/2022 12/21/2022

Page 44 of 100
SCHEDULE
S.No Description of work Unit Balance Duration Start Date Finish Date Remarks
Concrete Cum 115.2 2 days 12/22/2022 12/23/2022
Deshuttering Sqm 72.5 2 days 12/24/2022 12/26/2022
Pedestal 30 Rmt length and
10 days 12/27/2022 1/6/2023
1.0 Mtr depth
Shuttering BGL Sqm 58 3 days 12/27/2022 12/29/2022
Bolt Fixing LS 1 3 days 12/30/2022 1/2/2023
Concrete Cum 115.2 2 days 1/3/2023 1/4/2023
Deshuttering Sqm 58 2 days 1/5/2023 1/6/2023

Cable Trench - 153.7 at A


18 days 1/7/2023 1/27/2023
Side
Excavation 0 to 2 Mtr Cum 344.288 2 days 1/7/2023 1/9/2023
PCC Cum 24.592 1 day 1/10/2023 1/10/2023
Bottom Raft 9 days 1/11/2023 1/20/2023
Reinforcement work MT 5.76 4 days 1/11/2023 1/14/2023
Shuttering Sqm 30.74 4 days 1/16/2023 1/19/2023

Page 45 of 100
SCHEDULE
S.No Description of work Unit Balance Duration Start Date Finish Date Remarks
Concrete Cum 36.888 1 day 1/20/2023 1/20/2023
Wall - 2 Nos 6 days 1/21/2023 1/27/2023
Reinforcement work MT 13.44 2 days 1/21/2023 1/23/2023
Shuttering Sqm 676.28 3 days 1/24/2023 1/26/2023
Concrete Cum 67.628 1 day 1/27/2023 1/27/2023

B Side 51 days 1/30/2023 3/29/2023


Empty side arm charger 42 days 1/30/2023 3/18/2023
86 Rmt From Grid 4 42 days 1/30/2023 3/18/2023
Excavation 0 to 2 mtr Cum 1376 3 days 1/30/2023 2/1/2023
Excavation 2 to 4 mtr Cum 1376 2 days 2/2/2023 2/3/2023
Plumn concrete Cum 240.8 2 days 2/4/2023 2/6/2023
Footing - 86 Rmt 13 days 2/7/2023 2/21/2023
Reinforcement work MT 8.15 5 days 2/7/2023 2/11/2023
Shuttering BGL Sqm 214.08 4 days 2/13/2023 2/16/2023
Concrete Cum 330.24 2 days 2/17/2023 2/18/2023
Deshuttering Sqm 214.08 2 days 2/20/2023 2/21/2023
Pedestal upto 1.25 Mtr
11 days 2/22/2023 3/6/2023
depth
Reinforcement work MT 8.15 3 days 2/22/2023 2/24/2023
Shuttering BGL Sqm 430 4 days 2/25/2023 3/1/2023
Concrete Cum 330.24 2 days 3/2/2023 3/3/2023
Deshuttering Sqm 430 2 days 3/4/2023 3/6/2023
Pedestal 86 Rmt length
11 days 3/7/2023 3/18/2023
and 1.0 Mtr depth
Shuttering BGL Sqm 303 4 days 3/7/2023 3/10/2023
Bolt Fixing LS 1 3 days 3/11/2023 3/14/2023
Concrete Cum 172 2 days 3/15/2023 3/16/2023
Deshuttering Sqm 303 2 days 3/17/2023 3/18/2023

Railway Empty wagon - 54


37 days 2/7/2023 3/21/2023
Mtr Balance
Plumb concrete Cum 69.12 2 days 2/7/2023 2/8/2023
Footing (3 x 1.2) 13 days 2/9/2023 2/23/2023
Reinforcement work MT 6.15 5 days 2/9/2023 2/14/2023
Shuttering Sqm 136.8 4 days 2/15/2023 2/18/2023
Concrete Cum 207.36 2 days 2/20/2023 2/21/2023
Deshuttering Sqm 136.8 2 days 2/22/2023 2/23/2023
Pedestal upto 1.25 Mtr
11 days 2/24/2023 3/8/2023
depth
Reinforcement work MT 6.35 3 days 2/24/2023 2/27/2023
Shuttering BGL Sqm 142.5 4 days 2/28/2023 3/3/2023
Concrete Cum 207.36 2 days 3/4/2023 3/6/2023
Deshuttering Sqm 142.5 2 days 3/7/2023 3/8/2023
Pedestal 30 Rmt length and
11 days 3/9/2023 3/21/2023
1.0 Mtr depth
Shuttering BGL Sqm 114 4 days 3/9/2023 3/13/2023
Bolt Fixing LS 1 3 days 3/14/2023 3/16/2023
Concrete Cum 207.36 2 days 3/17/2023 3/18/2023
Deshuttering Sqm 114 2 days 3/20/2023 3/21/2023

Cable Trench - 153.7 at B side 18 days 3/9/2023 3/29/2023


Excavation 0 to 2 Mtr Cum 344.288 2 days 3/9/2023 3/10/2023
PCC Cum 24.592 1 day 3/11/2023 3/11/2023

Page 46 of 100
SCHEDULE
S.No Description of work Unit Balance Duration Start Date Finish Date Remarks
Bottom Raft 9 days 3/13/2023 3/22/2023
Reinforcement work MT 5.76 4 days 3/13/2023 3/16/2023
Shuttering Sqm 30.74 4 days 3/17/2023 3/21/2023
Concrete Cum 36.888 1 day 3/22/2023 3/22/2023
Wall - 2 Nos 6 days 3/23/2023 3/29/2023
Reinforcement work MT 13.44 2 days 3/23/2023 3/24/2023
Shuttering Sqm 676.28 3 days 3/25/2023 3/28/2023
Concrete Cum 67.628 1 day 3/29/2023 3/29/2023
Abstract Qty
Reinforcement work 94.881
Shuttering 3157.7
Concrete 2488.144

Page 47 of 100
RAILWAY CULVERT
Mr. Guna Sekaran

Qty
S.No Description of work Unit Estimated
Completed Balance
Qty

1 Earthwork Excavation Cum 1,915.39 1,880.72 34.67

2 PCC Cum 53.00 51.00 2.00

3 Reinforcement works MT 64.83 58.40 6.43

4 Shuttering Sqm 1,980.55 1,901.00 79.55

5 RCC M35 Cum 565.57 546.57 19.00

6 RCC M20 Cum 69.74 54.74 15.00

7 Boulder Laying Sqm 150.00 150.00

8 Back filling Cum 560.15 249.06 311.09

Duration
S.No Description of work Unit Balance Start Date Finish Date Remarks
(Days)
16 8/25/2022 9/10/2022
Work delayed due
Cum
1 Earthwork Excavation 34.67 3 8/25/2022 8/28/2022 to rain
2 PCC Cum 2.00 1 8/28/2022 8/29/2022
3 Reinforcement works MT 6.43 12 8/25/2022 9/6/2022
4 Shuttering Sqm 79.55 10 8/27/2022 9/6/2022
5 RCC M35 Cum 19.00 7 8/28/2022 9/4/2022
6 RCC M20 Cum 15.00 3 9/2/2022 9/5/2022
7 Boulder filling Cum 150.00 4 9/6/2022 9/10/2022
8 Back filling Cum 311.09 3 9/7/2022 9/10/2022

Manpower & Machinery


Unit Qty Remarks
S.No Available at site
1 Supervisor Nos
Mason Nos
Carpenter Nos
Fitter Nos

Page 48 of 100
Helper Nos
Excavator Nos 1.00

Page 49 of 100
RESERVOIR PUMP HOUSE SCHEDULE
Description Unit Qty Duration Start Finish
Reservoir Pump House 136 days 11/16/2022 3/31/2023
Below Ground Level 98 days 11/16/2022 2/21/2023
F2 (4500 x 3500) - D1, D2 & D3 7 days 11/16/2022 11/22/2022
Earthwork Excavation 0 to 2 m Cum 153.032 1 day 11/16/2022 11/16/2022
PCC 1:4:8 Cum 5.217 1 day 11/17/2022 11/17/2022
Reinforcement work MT 2.76 2 days 11/18/2022 11/19/2022
Shuttering work - BGL Sqm 33.84 1 day 11/20/2022 11/20/2022
RCC M30 Cum 28.35 1 day 11/21/2022 11/21/2022
Deshuttering Sqm 33.84 1 day 11/22/2022 11/22/2022

Sump Portion (17.39 x 3.25) 4 days 11/16/2022 11/19/2022


Reinforcement work MT 2.142 2 days 11/16/2022 11/17/2022
Shuttering work - BGL Sqm 26.832 1 day 11/18/2022 11/18/2022
RCC M30 Cum 19.781 1 day 11/18/2022 11/18/2022
Deshuttering Sqm 26.832 1 day 11/19/2022 11/19/2022

Reservoir Bottom Raft 9 days 11/19/2022 11/27/2022


Reinforcement work MT 6.3 7 days 11/19/2022 11/25/2022
Shuttering work - BGL Sqm 33.826 1 day 11/26/2022 11/26/2022
RCC M30 Cum 52.526 1 day 11/26/2022 11/26/2022
Deshuttering Sqm 33.826 1 day 11/27/2022 11/27/2022

Infront of Trash Gate Bottom Raft 19 days 11/18/2022 12/6/2022


PCC 1:4:8 Cum 15.651 1 day 11/18/2022 11/18/2022
Reinforcement work MT 5.6 7 days 11/27/2022 12/3/2022
Shuttering work - BGL Sqm 33.007 1 day 12/4/2022 12/4/2022
RCC M30 Cum 48.692 1 day 12/5/2022 12/5/2022
Deshuttering Sqm 33.007 1 day 12/6/2022 12/6/2022

RCC Wall 6 Nos of 12 mtr length, 2


Nos of 16 mtr length and 2 Nos of 3 mtr 40 days 12/9/2022 1/17/2023
Length - Total length of wall = 110 Rmt

Lift - 01 - 2.44 Mtr depth 16 days 12/9/2022 12/24/2022


Stretch - 01 8 days 12/9/2022 12/16/2022
Reinforcement work MT 5.095 2 days 12/9/2022 12/10/2022
Shuttering work - BGL Sqm 108.252 4 days 12/11/2022 12/14/2022
RCC M30 Cum 27.779 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 108.252 1 day 12/16/2022 12/16/2022
Stretch - 02 8 days 12/17/2022 12/24/2022
Reinforcement work MT 5.095 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 108.252 4 days 12/19/2022 12/22/2022
RCC M30 Cum 27.779 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 108.252 1 day 12/24/2022 12/24/2022
Stretch - 03 8 days 12/9/2022 12/16/2022
Reinforcement work MT 5.095 2 days 12/9/2022 12/10/2022
Shuttering work - BGL Sqm 108.252 4 days 12/11/2022 12/14/2022
RCC M30 Cum 27.779 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 108.252 1 day 12/16/2022 12/16/2022
Stretch - 04 8 days 12/17/2022 12/24/2022
Reinforcement work MT 5.095 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 108.252 4 days 12/19/2022 12/22/2022
RCC M30 Cum 27.779 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 108.252 1 day 12/24/2022 12/24/2022
Stretch - 05 8 days 12/9/2022 12/16/2022
Reinforcement work MT 5.095 2 days 12/9/2022 12/10/2022
Shuttering work - BGL Sqm 108.252 4 days 12/11/2022 12/14/2022
RCC M30 Cum 27.779 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 108.252 1 day 12/16/2022 12/16/2022

Lift - 02 - 2.34 Mtr depth 16 days 12/11/2022 12/26/2022


Stretch - 01 8 days 12/17/2022 12/24/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 4 days 12/19/2022 12/22/2022
RCC M30 Cum 26.641 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 103.815 1 day 12/24/2022 12/24/2022
Stretch - 02 16 days 12/11/2022 12/26/2022
Reinforcement work MT 4.886 2 days 12/25/2022 12/26/2022
Description Unit Qty Duration Start Finish
Shuttering work - BGL Sqm 103.815 4 days 12/11/2022 12/14/2022
RCC M30 Cum 26.641 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 103.815 1 day 12/16/2022 12/16/2022
Stretch - 03 8 days 12/17/2022 12/24/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 4 days 12/19/2022 12/22/2022
RCC M30 Cum 26.641 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 103.815 1 day 12/24/2022 12/24/2022
Stretch - 04 16 days 12/11/2022 12/26/2022
Reinforcement work MT 4.886 2 days 12/25/2022 12/26/2022
Shuttering work - BGL Sqm 103.815 4 days 12/11/2022 12/14/2022
RCC M30 Cum 26.641 1 day 12/15/2022 12/15/2022
Deshuttering Sqm 103.815 1 day 12/16/2022 12/16/2022
Stretch - 05 8 days 12/17/2022 12/24/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 4 days 12/19/2022 12/22/2022
RCC M30 Cum 26.641 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 103.815 1 day 12/24/2022 12/24/2022
Lift - 03 - 2.34 Mtr depth 16 days 12/17/2022 1/1/2023
Stretch - 01 8 days 12/25/2022 1/1/2023
Reinforcement work MT 4.886 2 days 12/25/2022 12/26/2022
Shuttering work - BGL Sqm 103.815 4 days 12/27/2022 12/30/2022
RCC M30 Cum 26.641 1 day 12/31/2022 12/31/2022
Deshuttering Sqm 103.815 1 day 1/1/2023 1/1/2023
Stretch - 02 8 days 12/17/2022 12/24/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 4 days 12/19/2022 12/22/2022
RCC M30 Cum 26.641 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 103.815 1 day 12/24/2022 12/24/2022
Stretch - 03 8 days 12/25/2022 1/1/2023
Reinforcement work MT 4.886 2 days 12/25/2022 12/26/2022
Shuttering work - BGL Sqm 103.815 4 days 12/27/2022 12/30/2022
RCC M30 Cum 26.641 1 day 12/31/2022 12/31/2022
Deshuttering Sqm 103.815 1 day 1/1/2023 1/1/2023
Stretch - 04 8 days 12/17/2022 12/24/2022
Reinforcement work MT 4.886 2 days 12/17/2022 12/18/2022
Shuttering work - BGL Sqm 103.815 4 days 12/19/2022 12/22/2022
RCC M30 Cum 26.641 1 day 12/23/2022 12/23/2022
Deshuttering Sqm 103.815 1 day 12/24/2022 12/24/2022
Stretch - 05 8 days 12/25/2022 1/1/2023
Reinforcement work MT 4.886 2 days 12/25/2022 12/26/2022
Shuttering work - BGL Sqm 103.815 4 days 12/27/2022 12/30/2022
RCC M30 Cum 26.641 1 day 12/31/2022 12/31/2022
Deshuttering Sqm 103.815 1 day 1/1/2023 1/1/2023
Lift - 04 - 2.34 Mtr depth 16 days 12/25/2022 1/9/2023
Stretch - 01 8 days 1/2/2023 1/9/2023
Reinforcement work MT 4.886 2 days 1/2/2023 1/3/2023
Shuttering work - BGL Sqm 103.815 4 days 1/4/2023 1/7/2023
RCC M30 Cum 26.641 1 day 1/8/2023 1/8/2023
Deshuttering Sqm 103.815 1 day 1/9/2023 1/9/2023
Stretch - 02 8 days 12/25/2022 1/1/2023
Reinforcement work MT 4.886 2 days 12/25/2022 12/26/2022
Shuttering work - BGL Sqm 103.815 4 days 12/27/2022 12/30/2022
RCC M30 Cum 26.641 1 day 12/31/2022 12/31/2022
Deshuttering Sqm 103.815 1 day 1/1/2023 1/1/2023
Stretch - 03 8 days 1/2/2023 1/9/2023
Reinforcement work MT 4.886 2 days 1/2/2023 1/3/2023
Shuttering work - BGL Sqm 103.815 4 days 1/4/2023 1/7/2023
RCC M30 Cum 26.641 1 day 1/8/2023 1/8/2023
Deshuttering Sqm 103.815 1 day 1/9/2023 1/9/2023
Stretch - 04 8 days 12/25/2022 1/1/2023
Reinforcement work MT 4.886 2 days 12/25/2022 12/26/2022
Shuttering work - BGL Sqm 103.815 4 days 12/27/2022 12/30/2022
RCC M30 Cum 26.641 1 day 12/31/2022 12/31/2022
Deshuttering Sqm 103.815 1 day 1/1/2023 1/1/2023
Stretch - 05 8 days 1/2/2023 1/9/2023
Reinforcement work MT 4.886 2 days 1/2/2023 1/3/2023
Shuttering work - BGL Sqm 103.815 4 days 1/4/2023 1/7/2023
RCC M30 Cum 26.641 1 day 1/8/2023 1/8/2023
Description Unit Qty Duration Start Finish
Deshuttering Sqm 103.815 1 day 1/9/2023 1/9/2023
Lift - 05 - 2.34 Mtr depth 16 days 1/2/2023 1/17/2023
Stretch - 01 8 days 1/10/2023 1/17/2023
Reinforcement work MT 4.886 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 103.815 4 days 1/12/2023 1/15/2023
RCC M30 Cum 26.641 1 day 1/16/2023 1/16/2023
Deshuttering Sqm 103.815 1 day 1/17/2023 1/17/2023
Stretch - 02 8 days 1/2/2023 1/9/2023
Reinforcement work MT 4.886 2 days 1/2/2023 1/3/2023
Shuttering work - BGL Sqm 103.815 4 days 1/4/2023 1/7/2023
RCC M30 Cum 26.641 1 day 1/8/2023 1/8/2023
Deshuttering Sqm 103.815 1 day 1/9/2023 1/9/2023
Stretch - 03 8 days 1/10/2023 1/17/2023
Reinforcement work MT 4.886 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 103.815 4 days 1/12/2023 1/15/2023
RCC M30 Cum 26.641 1 day 1/16/2023 1/16/2023
Deshuttering Sqm 103.815 1 day 1/17/2023 1/17/2023
Stretch - 04 8 days 1/2/2023 1/9/2023
Reinforcement work MT 4.886 2 days 1/2/2023 1/3/2023
Shuttering work - BGL Sqm 103.815 4 days 1/4/2023 1/7/2023
RCC M30 Cum 26.641 1 day 1/8/2023 1/8/2023
Deshuttering Sqm 103.815 1 day 1/9/2023 1/9/2023
Stretch - 05 8 days 1/10/2023 1/17/2023
Reinforcement work MT 4.886 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 103.815 4 days 1/12/2023 1/15/2023
RCC M30 Cum 26.641 1 day 1/16/2023 1/16/2023
Deshuttering Sqm 103.815 1 day 1/17/2023 1/17/2023

4th Grid - 04 Nos & D Grid - 03 Nos 37 days 12/17/2022 1/22/2023


F1 (5250 x 3750) & F2 (4500 x 3500) 7 days 12/17/2022 12/23/2022
PCC 1:4:8 Cum 13.828 1 day 12/17/2022 12/17/2022
Reinforcement work MT 8.62 2 days 12/18/2022 12/19/2022
Shuttering work - BGL Sqm 84.56 2 days 12/20/2022 12/21/2022
RCC M30 Cum 75.6 1 day 12/22/2022 12/22/2022
Deshuttering Sqm 84.56 1 day 12/23/2022 12/23/2022

Column - 9 Nos of 11.3 mtr depth (380 X 750) 31 days 12/23/2022 1/22/2023
Lift - 01 - 2.44 mtr Depth 7 days 12/23/2022 12/29/2022
Reinforcement work MT 0.847 2 days 12/23/2022 12/24/2022
Shuttering work - BGL Sqm 38.479 3 days 12/25/2022 12/27/2022
RCC M30 Cum 3.174 1 day 12/28/2022 12/28/2022
Deshuttering Sqm 38.479 1 day 12/29/2022 12/29/2022
Lift - 02 - 2.34 mtr Depth 7 days 12/29/2022 1/4/2023
Reinforcement work MT 0.812 2 days 12/29/2022 12/30/2022
Shuttering work - BGL Sqm 36.902 3 days 12/31/2022 1/2/2023
RCC M30 Cum 3.044 1 day 1/3/2023 1/3/2023
Deshuttering Sqm 36.902 1 day 1/4/2023 1/4/2023
Lift - 03 - 2.34 mtr Depth 7 days 1/4/2023 1/10/2023
Reinforcement work MT 0.812 2 days 1/4/2023 1/5/2023
Shuttering work - BGL Sqm 36.902 3 days 1/6/2023 1/8/2023
RCC M30 Cum 3.044 1 day 1/9/2023 1/9/2023
Deshuttering Sqm 36.902 1 day 1/10/2023 1/10/2023
Lift - 04 - 2.34 mtr Depth 7 days 1/10/2023 1/16/2023
Reinforcement work MT 0.812 2 days 1/10/2023 1/11/2023
Shuttering work - BGL Sqm 36.902 3 days 1/12/2023 1/14/2023
RCC M30 Cum 3.044 1 day 1/15/2023 1/15/2023
Deshuttering Sqm 36.902 1 day 1/16/2023 1/16/2023
Lift - 05 - 2.34 mtr Depth 7 days 1/16/2023 1/22/2023
Reinforcement work MT 0.812 2 days 1/16/2023 1/17/2023
Shuttering work - BGL Sqm 36.902 3 days 1/18/2023 1/20/2023
RCC M30 Cum 3.044 1 day 1/21/2023 1/21/2023
Deshuttering Sqm 36.902 1 day 1/22/2023 1/22/2023

Tank Roof Slab 30 days 1/23/2023 2/21/2023


Shuttering work Sqm 424.108 10 days 1/23/2023 2/1/2023
Reinforcement work MT 10.78 5 days 2/2/2023 2/6/2023
Concrete Cum 93.827 3 days 2/7/2023 2/9/2023
Deshuttering Sqm 424.108 2 days 2/20/2023 2/21/2023
Description Unit Qty Duration Start Finish
5th Grid - 04 Nos - BGL 16 days 1/5/2023 1/20/2023
F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 1/5/2023 1/8/2023
PCC 1:4:8 Cum 6.216 1 day 1/5/2023 1/5/2023
Reinforcement work MT 2.89 1 day 1/6/2023 1/6/2023
Shuttering work - BGL Sqm 6.32 1 day 1/7/2023 1/7/2023
RCC M30 Cum 29.925 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 6.32 1 day 1/8/2023 1/8/2023

Column - 4 Nos of 9.5 mtr depth (380 X 750) 12 days 1/9/2023 1/20/2023
Lift - 01 - 2.44 mtr Depth 3 days 1/9/2023 1/11/2023
Reinforcement work MT 0.405 1 day 1/9/2023 1/9/2023
Shuttering work - BGL Sqm 1.623 1 day 1/10/2023 1/10/2023
RCC M30 Cum 2.723 1 day 1/10/2023 1/10/2023
Deshuttering Sqm 1.623 1 day 1/11/2023 1/11/2023
Lift - 02 - 2.34 mtr Depth 3 days 1/12/2023 1/14/2023
Reinforcement work MT 0.388 1 day 1/12/2023 1/12/2023
Shuttering work - BGL Sqm 1.556 1 day 1/13/2023 1/13/2023
RCC M30 Cum 2.611 1 day 1/13/2023 1/13/2023
Deshuttering Sqm 1.556 1 day 1/14/2023 1/14/2023
Lift - 03 - 2.34 mtr Depth 3 days 1/15/2023 1/17/2023
Reinforcement work MT 0.388 1 day 1/15/2023 1/15/2023
Shuttering work - BGL Sqm 1.556 1 day 1/16/2023 1/16/2023
RCC M30 Cum 2.611 1 day 1/16/2023 1/16/2023
Deshuttering Sqm 1.556 1 day 1/17/2023 1/17/2023
Lift - 04 - 2.34 mtr Depth 3 days 1/18/2023 1/20/2023
Reinforcement work MT 0.388 1 day 1/18/2023 1/18/2023
Shuttering work - BGL Sqm 1.556 1 day 1/19/2023 1/19/2023
RCC M30 Cum 2.611 1 day 1/19/2023 1/19/2023
Deshuttering Sqm 1.556 1 day 1/20/2023 1/20/2023

6th Grid - 04 Nos - BGL 13 days 1/12/2023 1/24/2023


F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 1/12/2023 1/15/2023
PCC 1:4:8 Cum 6.216 1 day 1/12/2023 1/12/2023
Reinforcement work MT 2.89 1 day 1/13/2023 1/13/2023
Shuttering work - BGL Sqm 6.32 1 day 1/14/2023 1/14/2023
RCC M30 Cum 29.925 1 day 1/14/2023 1/14/2023
Deshuttering Sqm 6.32 1 day 1/15/2023 1/15/2023

Column - 4 Nos of 6.3 mtr depth (380 X 750) 9 days 1/16/2023 1/24/2023
Lift - 01 - 2.44 mtr Depth 3 days 1/16/2023 1/18/2023
Reinforcement work MT 0.434 1 day 1/16/2023 1/16/2023
Shuttering work - BGL Sqm 22.058 1 day 1/17/2023 1/17/2023
RCC M30 Cum 2.782 1 day 1/17/2023 1/17/2023
Deshuttering Sqm 22.058 1 day 1/18/2023 1/18/2023
Lift - 02 - 2.34 mtr Depth 3 days 1/19/2023 1/21/2023
Reinforcement work MT 0.417 1 day 1/19/2023 1/19/2023
Shuttering work - BGL Sqm 21.154 1 day 1/20/2023 1/20/2023
RCC M30 Cum 2.668 1 day 1/20/2023 1/20/2023
Deshuttering Sqm 21.154 1 day 1/21/2023 1/21/2023
Lift - 03 - 1.52 mtr Depth 3 days 1/22/2023 1/24/2023
Reinforcement work MT 0.271 1 day 1/22/2023 1/22/2023
Shuttering work - BGL Sqm 13.741 1 day 1/23/2023 1/23/2023
RCC M30 Cum 1.733 1 day 1/23/2023 1/23/2023
Deshuttering Sqm 13.741 1 day 1/24/2023 1/24/2023

7th Grid - 04 Nos - BGL 10 days 1/19/2023 1/28/2023


F3 (5250 x 3750)-02 Nos & F2 (4500 x 3500)-02 Nos 4 days 1/19/2023 1/22/2023
PCC 1:4:8 Cum 6.216 1 day 1/19/2023 1/19/2023
Reinforcement work MT 2.89 1 day 1/20/2023 1/20/2023
Shuttering work - BGL Sqm 6.32 1 day 1/21/2023 1/21/2023
RCC M30 Cum 29.925 1 day 1/21/2023 1/21/2023
Deshuttering Sqm 6.32 1 day 1/22/2023 1/22/2023

Column - 4 Nos of 3.3 mtr depth (380 X 750) 6 days 1/23/2023 1/28/2023
Lift - 01 - 2.44 mtr Depth 3 days 1/23/2023 1/25/2023
Reinforcement work MT 0.481 1 day 1/23/2023 1/23/2023
Shuttering work - BGL Sqm 21.274 1 day 1/24/2023 1/24/2023
RCC M30 Cum 2.782 1 day 1/24/2023 1/24/2023
Deshuttering Sqm 21.274 1 day 1/25/2023 1/25/2023
Description Unit Qty Duration Start Finish
Lift - 02 - 0.86 mtr Depth 3 days 1/26/2023 1/28/2023
Reinforcement work MT 0.169 1 day 1/26/2023 1/26/2023
Shuttering work - BGL Sqm 7.498 1 day 1/27/2023 1/27/2023
RCC M30 Cum 0.98 1 day 1/27/2023 1/27/2023
Deshuttering Sqm 7.498 1 day 1/28/2023 1/28/2023

Tie Beam +237.65 Mtr Lvl 7 days 12/25/2022 12/31/2022


Reinforcement work MT 0.71 3 days 12/25/2022 12/27/2022
Shuttering work - BGL Sqm 51.09 2 days 12/28/2022 12/29/2022
RCC M30 Cum 5.657 1 day 12/30/2022 12/30/2022
Deshuttering Sqm 51.09 1 day 12/31/2022 12/31/2022

Tie Beam +239.8 Mtr Lvl 8 days 1/1/2023 1/8/2023


Reinforcement work MT 1.17 4 days 1/1/2023 1/4/2023
Shuttering work - BGL Sqm 86.322 2 days 1/5/2023 1/6/2023
RCC M30 Cum 9.62 1 day 1/7/2023 1/7/2023
Deshuttering Sqm 86.322 1 day 1/8/2023 1/8/2023

Tie Beam +242.7 Mtr Lvl 10 days 1/9/2023 1/18/2023


Reinforcement work MT 1.62 5 days 1/9/2023 1/13/2023
Shuttering work - BGL Sqm 121.554 3 days 1/14/2023 1/16/2023
RCC M30 Cum 13.584 1 day 1/17/2023 1/17/2023
Deshuttering Sqm 121.554 1 day 1/18/2023 1/18/2023

Tie Beam +245.6 Mtr Lvl 14 days 1/19/2023 2/1/2023


Reinforcement work MT 2.08 7 days 1/19/2023 1/25/2023
Shuttering work - BGL Sqm 161.844 4 days 1/26/2023 1/29/2023
RCC M30 Cum 18.306 1 day 1/30/2023 1/30/2023
Deshuttering Sqm 161.844 2 days 1/31/2023 2/1/2023

Tie Beam +247.8 Mtr Lvl 14 days 2/2/2023 2/15/2023


Reinforcement work MT 4.73 7 days 2/2/2023 2/8/2023
Shuttering work - BGL Sqm 160.839 4 days 2/9/2023 2/12/2023
RCC M30 Cum 16.686 1 day 2/13/2023 2/13/2023
Deshuttering Sqm 160.839 2 days 2/14/2023 2/15/2023

AGL 49 days 2/11/2023 3/31/2023


Column - 09 Nos of 9.5 mtr depth (380 X 750) 40 days 2/11/2023 3/22/2023
Lift - 01 - 2.44 mtr Depth 7 days 2/11/2023 2/17/2023
Reinforcement work MT 0.847 2 days 2/11/2023 2/12/2023
Shuttering work - BGL Sqm 60.658 3 days 2/13/2023 2/15/2023
RCC M30 Cum 7.662 1 day 2/16/2023 2/16/2023
Deshuttering Sqm 60.658 1 day 2/17/2023 2/17/2023
Lift - 02 - 2.34 mtr Depth 11 days 2/18/2023 2/28/2023
Reinforcement work MT 0.812 4 days 2/18/2023 2/21/2023
Shuttering work - BGL Sqm 58.172 5 days 2/22/2023 2/26/2023
RCC M30 Cum 7.348 1 day 2/27/2023 2/27/2023
Deshuttering Sqm 58.172 1 day 2/28/2023 2/28/2023
Lift - 03 - 2.34 mtr Depth 11 days 3/1/2023 3/11/2023
Reinforcement work MT 0.812 4 days 3/1/2023 3/4/2023
Shuttering work - BGL Sqm 58.172 5 days 3/5/2023 3/9/2023
RCC M30 Cum 7.348 1 day 3/10/2023 3/10/2023
Deshuttering Sqm 58.172 1 day 3/11/2023 3/11/2023
Lift - 04 - 2.34 mtr Depth 11 days 3/12/2023 3/22/2023
Reinforcement work MT 0.812 4 days 3/12/2023 3/15/2023
Shuttering work - BGL Sqm 58.172 5 days 3/16/2023 3/20/2023
RCC M30 Cum 7.348 1 day 3/21/2023 3/21/2023
Deshuttering Sqm 58.172 1 day 3/22/2023 3/22/2023

Tie Beam +250.85 Mtr Lvl 5 days 2/17/2023 2/21/2023


Reinforcement work MT 0.28 2 days 2/17/2023 2/18/2023
Shuttering work - BGL Sqm 11.562 1 day 2/19/2023 2/19/2023
RCC M30 Cum 0.859 1 day 2/20/2023 2/20/2023
Deshuttering Sqm 11.562 1 day 2/21/2023 2/21/2023

Tie Beam +253.4 Mtr Lvl 5 days 2/28/2023 3/4/2023


Reinforcement work MT 0.68 2 days 2/28/2023 3/1/2023
Shuttering work - BGL Sqm 33.177 1 day 3/2/2023 3/2/2023
RCC M30 Cum 3.039 1 day 3/3/2023 3/3/2023
Description Unit Qty Duration Start Finish
Deshuttering Sqm 33.177 1 day 3/4/2023 3/4/2023

at +259.5 Mtr Level (A2A4 - D2D4) 5 days 3/11/2023 3/15/2023


Shuttering work Sqm 155.76 2 days 3/11/2023 3/12/2023
Reinforcement work MT 1.907 1 day 3/13/2023 3/13/2023
Concrete Cum 31.152 1 day 3/14/2023 3/14/2023
Deshuttering Sqm 155.76 1 day 3/15/2023 3/15/2023

Pump Room 33 days 2/20/2023 3/24/2023


230mm Brick work Cum 62.74 20 days 2/20/2023 3/11/2023
External Plastering Sqm 432.103 18 days 2/24/2023 3/13/2023
Internal Plastering Sqm 287.46 20 days 2/25/2023 3/16/2023
External Painting Sqm 432.103 6 days 3/14/2023 3/19/2023
Internal Painting Sqm 287.46 8 days 3/17/2023 3/24/2023

Operating Room 40 days 2/20/2023 3/31/2023


230mm Brick work Cum 7.918 4 days 2/20/2023 2/23/2023
115mm Brick work Sqm 10.744 1 day 2/24/2023 2/24/2023
Slab 15 days 2/24/2023 3/10/2023
Shuttering work Sqm 18.281 2 days 2/24/2023 2/25/2023
Reinforcement work MT 0.173 1 day 2/26/2023 2/26/2023
Concrete Cum 2.93 1 day 2/27/2023 2/27/2023
Deshuttering Sqm 18.281 1 day 3/10/2023 3/10/2023
External Plastering Sqm 41.73 15 days 2/24/2023 3/10/2023
Internal Plastering Sqm 35.974 14 days 2/26/2023 3/11/2023
External Painting Sqm 41.73 15 days 3/11/2023 3/25/2023
Internal Painting Sqm 35.974 20 days 3/12/2023 3/31/2023

Manpower & Machinery Available at


Unit Qty
site
Supervisor Nos -
Mason Nos -
Carpenter Nos -
Fitter Nos -
Helper Nos -
Excavator Nos 1.00
JCB Nos 1.00
Grader Nos
Roller Nos
Hywa Nos 2.00
QUARTERS 3rd PRIORITY (17 - 24 BLOCKS )

S.No Description of work Unit Estimated Qty Completed Balance Remarks

QUARTERS 3rd PRIORITY (17 - 24 BLOCKS )


1 Earthwork Cum 3,628.16 3,628.16 -
2 PCC for Footing Cum 67.24 67.24 -
3 RCC M25 Works - BGL Cum 263.96 263.96 -
4 Back filling Cum 3,296.92 3,296.92 -
5 Sand & Compacted Earth Filling Cum 668.92 668.92 -
6 PCC M15 Flooring Cum 178.76 178.76 -
7 RCC M25 Works - AGL Cum 979.12 979.12 -
8 Brick work 230 mm Thk Cum 952.04 952.04 -
9 Brick work 115 mm Thk Sqm 1,237.36 1,237.36 -
10 Internal Plastering Sqm 7,931.60 7,931.60 -
11 External Plastering Sqm 4,874.92 4,874.92 -
12 Ceiling Plastering Sqm 2,666.12 2,666.12 -
13 Floor Tiles Sqm 2,590.08 2,072.06 268.02
14 Wall Tiles Sqm 1,188.76 475.50 613.26
15 Staircase - Tiles Sqm 354.04 177.02 97.02
16 Internal Painting Sqm 7,931.60 4,758.96 2,772.64
17 External Painting Sqm 4,874.92 2,924.95 1,949.97
18 Ceiling Painting Sqm 2,666.12 2,132.90 133.22
19 Plumbing Work Block 8.00 8.00 -
20 Water Proofing Work Sqm 1,896.56 1,896.56 -
21 Plinth Pretection Cum 513.28 513.28 -35.00
22 Kitchen Top-Granite Laying Sqm 44.66 44.66 -
23 Door & Window Shutter Fixing Nos 1,021.00 800.00 221.00
24 Staircase & Verandah - Hand Rail Rmt 482.16 482.16 -
25 Gate & Window Grill works Sqm 694.56 416.74 277.82
26 Door & Window Shutter & Grill Painting Nos 1,021.00 800.00 221.00
27 Final Fitting Work Block 8.00 2.00 6.00

Manpower Unit Qty


Supervisor Nos 8.00
Painter Nos 16.00
Plumber Nos 6.00
Mason Nos 30.00
Carpenter Nos 10.00
Fitter Nos 4.00
Helper Nos 80.00
Total Manpower Nos 154.00

Machinery Unit Qty


Tractor Nos 1.00
Excavator Nos 1.00
JCB Nos -
Hywa Nos 1.00
COAL SHED-SCHEDULE

S.No Description of work Unit Estimated Qty Completed Qty Balance Qty

COAL SHED-SCHEDULE
1 Earthwork in Excavation Cum 5,400.00 5,400.00 -
2 Back filling/ Ash Filling Cum 20,544.00 2,559.00 17,985.00
3 PCC 1:4:8 Cum 132.61 132.61 -
4 Steel reinforcement Mt 269.77 179.81 89.96
5 Shuttering - BGL Sqm 3,244.22 2,993.60 250.62
6 Shuttering - AGL Sqm 11,421.77 4,870.87 6,550.89
7 RCC M 25 - BGL Cum 702.58 650.78 51.80
8 RCC M 25 - AGL Cum 2,416.23 1,196.36 1,219.88
9 RCC M 30 Cum 62.62 62.62 -
10 RR Masonry Cum 12,300.00 #REF! #REF!
11 Plumb Concrete Cum 4,250.00 1,771.50 2,478.50

Manpower Unit Available Qty Required Qty


Supervisor Nos 2
Mason Nos 40 6
Carpenter Nos 0 0
Fitter Nos 0 0
Helper Nos 98 22
Total Manpower Nos 140 28

Material Unit Stock at site Required Qty

RR Stones
Nos 150000 #REF!
(230x230x200mm-80Nos/Cum)

Machinery details Unit Available Qty


JCB Nos 0
Excavator Nos 1
Hywa Nos 1
Water Tanker Nos 1

Page 57 of 100
Inplant Road

Budget Approval (Rmt) 2938 Completed (Rmt) 2758 Balance (Rmt) 180

Estimated Completed
S.No Description Unit Balance Qty Duration (Days) Start Date Finish Date Remarks
Qty Qty
INPLANT ROAD WORK - 2938.185 RMT 97 9/26/2022 1/18/2023
Road No. 97 (Cooling Tower
Road upto Fire & Safety Office) -
1 11 days 10/15/2022 10/26/2022 Completed
5.0 Mtr Width of length 148.147
Rmt

Road No. 93 (Safety office to


chlorination Building connecting
2 9 days 10/29/2022 11/8/2022 Completed
road) - 5.0 Mtr Width of length
282.854 Rmt

Reservoir Ourter Road - 10.0 Mtr


3 29 days 10/28/2022 11/30/2022 Completed
Width of length is 202.823 Rmt

Road No. 09 (Admin road to


4 Hydrogen Building) - 7.5 Mtr 27 days 10/11/2022 11/18/2022 Completed
Width of length 263.57 Rmt

Road No. 94 & 95 (Chlorination &


Hydrogen Building Outer Road) -
5 16 days 11/19/2022 12/7/2022 Completed
3.5 Mtr Width of length is 181.713
Rmt

Road No. 91 & 92 (Intermediate


6 Road) - 3.5 Mtr Width & Length is 10 days 11/26/2022 12/5/2022 Completed
93.4 Rmt

Road No. 03 & 04 (Coal shed


7 outer Road) - 10.0 Mtr Width of 64 days 11/5/2022 1/18/2023 Completed
length is 672.044 Rmt

P&M workshop Road from Main


8 Gate - 10.0 Mtr Width of length is 22 days 11/22/2022 12/16/2022 Completed
176.871 Rmt

P&M workshop & ETP Road - 7.0


9 Mtr Width of length is 277.262 23 days 11/28/2022 12/23/2022 Completed
Rmt

Gate No. 03 to Silo connecting


Road - 10.0 Mtr Width of length 80
10 15 days 12/5/2022 12/21/2022 Completed
Rmt & Labour colony 3 mtr width
and 50 mtr length of road

Gate No. 03 connecting road to


11 Silo - 7.0 Mtr Width of length is 31 days 12/10/2022 1/14/2023 Work in Progress
300.569 Rmt
EarthWork Excavation Cum 425.45 425.450 0.000 3 days 12/10/2022 12/13/2022

Carting away of surplus earth Cum 425.45 425.450 0.000 3 days 12/10/2022 12/13/2022

Embankment filling Cum 6200 6200.000 0.000 5 days 12/14/2022 12/19/2022


GSB - Ready Mix Cum 676.28 270.00 406.280 4 days 12/20/2022 12/23/2022
WMM - Ready Mix Cum 541.024 216.00 325.024 4 days 12/24/2022 12/28/2022
LHS - 3.5 Mtr Width 0.000 4 days 12/29/2022 1/2/2023 Excavator -1 Nos
Hywa- 4 Nos
Shuttering Sqm 151 60.29 90.710 4 days 12/29/2022 1/2/2023 01. Excavator = 55
Dowel Bars MT 1.08 0.43 0.650 4 days 12/29/2022 1/2/2023 Cum/Hr,
02. Hywa (10 wheel)
Joint Sheet Rmt 195.78 78.16 117.620 4 days 12/29/2022 1/2/2023
Capacity = 10 Cum
CC Road - M35 Cum 315.59 126 189.590 4 days 12/29/2022 1/2/2023 03. Transporataion time
RHS - 3.5 Mtr Width 0.000 4 days 1/3/2023 1/6/2023 of Hywa 1 Hour
04.Hywa - 100 cum per
Shuttering Sqm 151 60.29 90.710 4 days 1/3/2023 1/6/2023 day
Dowel Bars MT 1.08 0.43 0.650 4 days 1/3/2023 1/6/2023
Joint Sheet Rmt 195.78 78.16 117.620 4 days 1/3/2023 1/6/2023
CC Road - M35 Cum 315.59 126 189.590 4 days 1/3/2023 1/6/2023
Groove Cutting Rmt 391.569 156.33 235.239 7 days 1/7/2023 1/14/2023

Hard Shoulder - Murram Laying Cum 180.341 180.341 7 days 1/7/2023 1/14/2023

Road No. 81 (Inbetween of


12 Chimney) - 5.0 Mtr Width of length 15 days 12/14/2022 12/31/2022 Completed
is 209.092 Rmt
Estimated Completed
S.No Description Unit Balance Qty Duration (Days) Start Date Finish Date Remarks
Qty Qty
EarthWork Excavation Cum 1097.733 1097.733 - 5 days 12/14/2022 12/19/2022

Carting away of surplus earth Cum 1097.733 1097.733 - 5 days 12/14/2022 12/19/2022

GSB - Ready Mix Cum 365.911 365.911 - 2 days 12/20/2022 12/21/2022


WMM - Ready Mix Cum 292.729 292.729 - 2 days 12/22/2022 12/23/2022
Shuttering Sqm 141.955 141.955 - 3 days 12/24/2022 12/27/2022
Dowel Bars MT 1.157 1.157 - 3 days 12/22/2022 12/24/2022
Joint Sheet Rmt 254.092 254.092 - 3 days 12/22/2022 12/24/2022
CC Road - M35 Cum 313.638 313.638 - 3 days 12/22/2022 12/24/2022
Groove Cutting Rmt 254.092 254.092 - 4 days 12/26/2022 12/29/2022

Hard Shoulder - Murram Laying Cum 125.455 125.455 - 6 days 12/26/2022 12/31/2022

Manpower Unit Qty


Supervisor Nos -
Mason Nos 2.00
Carpenter Nos 1.00
Fitter Nos -
Helper Nos 8.00
Total Manpower Nos 11.00

Machinery Unit Qty


Excavator Nos 1.00
JCB Nos 1.00
Grader Nos 1.00
Roller Nos 1.00
Hywa Nos 4.00
COAL SHED-SCHEDULE

S.No Description of work Unit Estimated Qty Completed Qty Balance Qty

COAL SHED-SCHEDULE
1 Earthwork in Excavation Cum 5,400.00 5,400.00 -
2 Back filling/ Ash Filling Cum 20,544.00 2,559.00 17,985.00
3 PCC 1:4:8 Cum 132.61 132.61 -
4 Steel reinforcement Mt 269.77 179.81 89.96
5 Shuttering - BGL Sqm 3,244.22 2,993.60 250.62
6 Shuttering - AGL Sqm 11,421.77 4,870.87 6,550.89
7 RCC M 25 - BGL Cum 702.58 650.78 51.80
8 RCC M 25 - AGL Cum 2,416.23 1,196.36 1,219.88
9 RCC M 30 Cum 62.62 62.62 -
10 RR Masonry Cum 12,300.00 #REF! #REF!
11 Plumb Concrete Cum 4,250.00 1,771.50 2,478.50

Manpower Unit Available Qty Required Qty


Supervisor Nos 2
Mason Nos 40 6
Carpenter Nos 0 0
Fitter Nos 0 0
Helper Nos 98 22
Total Manpower Nos 140 28

Material Unit Stock at site Required Qty

RR Stones
Nos 150000 #REF!
(230x230x200mm-80Nos/Cum)

Machinery details Unit Available Qty


JCB Nos 0
Excavator Nos 1
Hywa Nos 1
Water Tanker Nos 1

Page 60 of 100
Structure : Coal shed PROCESS SHEET
Work : RR wall weekly work Sheet
Working Details for (GRID A 16 TO 20 ) (B16 TO 25)( C16 TO 25) (D 14 TO 25) BACK
FILLING
RR
STEEL IN SHUTTERIN RCC IN WITH BOTTOM
WORK DETAILS WORK PLUM CC PCC TOP LEVEL HEIGHT REMARKS
S.No Date Mason Carpenter Fitter Helper KG G IN SQM CUM WATER LEVEL
IN CUM
COMPACTI
NOS L B H Qty Qty Qty Qty Qty
ON Qty
1 1/17/2023 45 6 3 120 1 224 0.6 0.5 45 0.85 40.00 6 40 22 253.500 256.150 2.65
2 1/18/2023 45 6 3 120 1 224 0.6 0.5 48 0.85 40.00 6 50 22 253.500 256.150 2.65
3 1/19/2023 45 6 3 120 1 200 0.45 0.75 48 1.20 45.00 6 45 18 253.500 256.150 staging=(68cum) with shifting
4 1/20/2023 45 6 3 100 1 160 0.45 0.9 40 1.00 26.00 8 50 18 253.500 256.150
5 1/21/2023 45 7 3 100 1 160 0.45 0.9 38 1.00 30.00 6 50 22 253.500 256.150 2.65
6 1/22/2023 45 7 3 10 1 160 0.45 0.9 0 0.85 8.00 6 40 18 253.500 256.150 2.65 staging=(64cum) with shifting
7 1/23/2023 45 6 3 100 1 0 0.45 0.9 38 - 0.00 0 50 0 253.500 256.150 2.65
8 1/24/2023 45 6 3 100 1 155 0.45 0.9 33 0.90 28.00 6 50 24 253.500 256.150 2.65
9 1/25/2023 45 6 3 100 1 125 0.45 0.9 42 0.90 29.00 4 50 24 253.500 256.150 2.65
10 1/26/2023 45 5 3 100 1 175 0.45 1 39 0.45 25.00 4 50 24 253.500 256.150 2.65 staging=(96cum) with shifting
11 1/27/2023 45 5 3 100 1 150 0.45 0.9 38 0.50 35.00 6 80 18 253.500 256.150
12 1/28/2023 45 5 3 100 1 130 0.45 0.9 39 0.80 36.00 6 50 16 253.500 256.150 2.65
13 1/29/2023 45 6 3 10 1 165 0.45 0.75 0 0.80 12.00 8 50 12 253.500 256.150 2.65
14 1/30/2023 45 6 3 100 1 0 0.45 0.9 37 - 38.00 0 50 22 253.500 256.150 2.65
15 1/31/2023 45 6 3 100 1 0 0.45 0.9 39 - 30.00 0 50 22 256.150 257.000 0.85
16 2/1/2023 45 7 3 100 1 0 0.45 0.9 41 - 18.00 0 50 22 256.150 257.000 0.85
675 89 45 1380 524 10.10 422.00 72 755 283 0 13.25 APPROX LENGTH (100 TO 120 RMT)
work done 1 week out of 2 week 520 9.30 216.00 102 450 120
balance qty for 1 week 37.43 -4 -1 -206 30 -305 -163 0
ABSTARACT
# Mason utilization @ 42/ day
# Helper utilization @ 105/ day ( i/c @ 3 helper / Mason) due to height (+2 mtr to +5mtr)
# Total man power proposed to be engaged @ 150 / day
# Output RR Work @ 330 cum / Week
# Output RR Work @ 47 cum / day
# Output mason @ 1.15 cum / day
# Output shuttering @ 23 Sqm / day ( mason gang can do the shuttering )
# Output Steel @ 1.0 Mt / day
# Output concrete @ 25 Cum / day
# Output back filling @ 50 Cum / day ( Ash and soil filling)
ASH POND - 3&4 Balance reworks Schedule
Site Engineer : Lavkush singh
Constrains Ash to be Evacuated
Action by
Qty
% Of
S.No Description of work Unit Estimated Complet Completion
% of Balance
Balance
Qty ed
ASH POND - 3&4
1 3&4 Connecting bond soil cutting Cum 54,548.55 7,290.00 47,258.55 13% 87%
Side bond Ash removing & bond Sqm 27% 73%
2 Preparation work 18,530.00 4,921.50 13,608.50
HDPE Sope + bottom Film for Ash Sqm 17% 83%
3 Pond 9,578.00 1,600.00 7,978.00
4 Steel reinforcement MT 6.75 0.19 6.56 3% 97%
5 Shuttering - Bgl Sqm 623.11 - 623.11 0% 100%
6 RCC M20 Cum 76.91 - 76.91 0% 100%
7 Brickwork 115 mm thk Sqm 9,860.99 - 9,860.99 0% 100%
Brick laying above cleaning work & 0% 100%
8 grouting work Sqm 10,355.11 - 10,355.11
Overall 4% 96%
SCHEDULE
Status: Balace civil started for Slope bond area

Duratio
S.No Description of work Unit Balance Start Date Finish Date Remarks
n
ASH POND -3 &4 59
1 3&4 Connecting bond soil cutting Cum 47,258.55 59.00 2/1/2023 3/31/2023

2 Side Bond Ash removing & bond Sqm 13,608.50 33.00 2/1/2023 3/6/2023
Preparation work
3 HDPE Laying work Sqm 7,978.00 39.00 2/3/2023 3/14/2023 1.Ash Evacuation
4 Steel reinforcement MT 6.56 35.00 2/4/2023 3/11/2023 works under progress
in bottom area .
5 Shuttering - Bgl Sqm 623.11 40.00 2/5/2023 3/17/2023
6 RCC Tie Beam Cum 76.91 42.00 2/6/2023 3/20/2023
7 Brick work 115mm thk Sqm 9,860.99 36.00 2/7/2023 3/15/2023

8 Brick laying above cleaning work & 10,355.11 34.00 2/10/2023 3/15/2023
grouting work Sqm
QUARTERS 4th PRIORITY (25 - 48 BLOCKS )

Site Engineer: Vimal. V Constrains Plan to be finalised


Status:
S.No Description of work Unit Total Qty Completed Balance Remarks
QUARTERS 4th PRIORITY (25 - 48 BLOCKS )
1 Earthwork Cum 14,825.45 14,825.45
2 PCC for Footing Cum 239.88 239.88
3 RCC M25 Works - BGL Cum 996.76 996.76
4 Back filling Cum 13,588.69 13,588.69
5 Sand & Compacted Earth Filling Cum 1,890.47 1,890.47
6 PCC M15 Flooring Cum 540.49 540.49
7 RCC M25 Works - AGL Cum 3,015.97 3,015.97
8 Brick work 230 mm Thk Cum 3,824.60 3,824.60
9 Brick work 115 mm Thk Sqm 1,283.78 1,283.78
10 Internal Plastering Sqm 23,933.59 23,933.59
11 External Plastering Sqm 14,063.52 14,063.52
12 Ceiling Plastering Sqm 7,835.35 7,835.35
13 Floor Tiles Sqm 9,520.42 9,520.42
14 Wall Tiles Sqm 3,819.68 3,819.68
15 Staircase - G.F to F.F Sqm 580.16 580.16
16 Internal Painting Sqm 23,933.59 23,933.59
17 External Painting Sqm 14,063.52 14,063.52
18 Ceiling Painting Sqm 7,835.35 7,835.35
19 Plumbing Work Block 24.00 24.00
20 Water Proofing Work Sqm 5,689.68 5,689.68
21 Plinth Pretection Cum 1,539.84 1,539.84
22 Kitchen Top-Granite Laying Sqm 133.99 133.99
23 Door & Window Shutter Fixing Nos 3,063.00 3,063.00
24 StairCase&Verandah Rmt 1,446.48 1,446.48
25 Gate & Window Grill works Sqm 2,083.68 2,083.68
26 Wall Painting Work Sqm 49,053.36 49,053.36
27 Door & Window Shutter & Grill Painting Nos 3,063.00 3,063.00
28 Final Fitting WORK Block 24.00 24.00
Structure : Family Quarters-Block-18
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work
DE-SHUTTERING IN
BRICKWORK in Cum INTERNAL PLASTERING in Sqm EXTERNAL PLASTERING in Sqm STAGING in Sqm STEEL IN MT SHUTTERING IN SQM
SQM
S.No Date Mason Tiles Mason Helper Carpender Fitter Helper Description of item
Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

i) First floor Brick work upto


3 8 Lintel 3.00

2 2 ii) Firsfloor lintel sunshde work 14.00


1 12/1/2022
iii) Firsfloor lintel sunshde
3 8
Concrete

iv) Brickwork above Lintel 1.00

i) First floor Brick work upto


3 8 Lintel 3.00

2 2 ii) Firsfloor lintel sunshde work 12.00


2 12/2/2022
iii) Firsfloor lintel sunshde
3 8
Concrete

iv) Brickwork above Lintel 1.00

i) First floor Brick work upto


3 8 Lintel 3.00

2 2 ii) Firsfloor lintel sunshde work 12.00


3 12/3/2022
iii) Firsfloor lintel sunshde
3 8
Concrete

iv) Brickwork above Lintel 1.00

i) Headroom Brick work


3 8 3.00

5 10 ii) Firsfloor lintel sunshde work 6.00

4 04-12-2022 (Sunday) iii) Brickwork above Lintel 3.00

iv) Internal Plastering 15.00

v) Staging work for external


Plastering 84.00

i) Headroom Brick work


3 8 4.00

5 10 ii) Lintel and sunshade concreting

5 12/5/2022 iii) Internal Plastering Required Clearance from electrical

5 10 iv) External Plastering 30.00

v) Staging work for external


Plastering 90.00

Page 64 of 100
Structure : Family Quarters-Block-18
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work
DE-SHUTTERING IN
BRICKWORK in Cum INTERNAL PLASTERING in Sqm EXTERNAL PLASTERING in Sqm STAGING in Sqm STEEL IN MT SHUTTERING IN SQM
SQM
S.No Date Mason Tiles Mason Helper Carpender Fitter Helper Description of item
Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

i) Internal Plastering
3 8

6 12/6/2022 5 10 ii) External Plastering 40.00

iii) Staging work for external


Plastering 90.00

i) Internal Plastering
3 8
7 12/7/2022

5 10 ii) External Plastering 60.00

55 0 130 6 0 6

22.00 - 15.00 - 130.00 - 264.00 - - - 44.00 - -

WORK DETAILS PER DAY


3 Mason
3 cum/Day
1 Brick work 8 Helper

5 Mason
2 Internal Plastering 60 Sqm/day
10 Helper
5 Mason
3 External Plastering 40 Sqm/day
10 Helper

4 Tractar with trolly Sand,cement& Bricks internal shifting at site

Page 65 of 100
Structure : Family Quarters-Block-18
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work
DE-SHUTTERING IN
BRICKWORK in Cum INTERNAL PLASTERING in Sqm EXTERNAL PLASTERING in Sqm STAGING in Sqm STEEL IN MT SHUTTERING IN SQM
SQM
S.No Date Mason Tiles Mason Helper Carpender Fitter Helper Description of item
Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

Material
Date Description Available balance required
Requirement
1 Cement 200.000 BAG
Stock at site
2 Sand 50.000 CUM
3 Bricks 11700.000 NOS 3000 nos/day from Brickplant 11700

Page 66 of 100
DE-SHUTTERING IN
RCC IN CUM
SQM

Executed Planned Executed REMARKS

Brick shifting

0.50

Brick shifting

1.00

Brick shifting

1.50

Brick shifting

Brick shifting

2.00

Page 67 of 100
DE-SHUTTERING IN
RCC IN CUM
SQM

Executed Planned Executed REMARKS

Brick shifting

Brick shifting

- 5.00 - -

Page 68 of 100
Structure : Family Quarters-Director House
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work
INTERNAL WALL CEILING PLASTERING in EXTERNAL WALL DE-SHUTTERING IN
BRICKWORK in Cum STAGING in Sqm SHUTTERING IN SQM RCC IN CUM SCREED CONCRETE
PLASTERING in Sqm Sqm PLASTERING in Sqm SQM
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

i) Head Room Slab De-shuttering


3 3 4 18.00
and Stacking

1 12/1/2022 2 3 2 2 ii)FF Lintel & sunshade work 6.00

4 6 iii)BW above Lintel 2

i)Headroom Brick work 2.00


5 11

ii)Lintel and sunshade concreting 2.00


2 12/2/2022

iii)FF Brick work above lintel 2

5 8

iv)Staging for Extrnal Plastering 112.00

i)Headroom Brick work 2.00


5 11

ii)External Plastering 20.00 2.00


3 12/3/2022

iii)FF Brick work above lintel 2

5 8

iv)Staging for Extrnal Plastering 112.00

i)Headroom Ceiling Plastering 9.36


5 6

ii)External Plastering 30.00 2.00


4 04-12-2022 (Sunday)

iii) FF Internal wall plastering Required Clearance from electrical

4 6

iv)Staging for Extrnal Plastering 56.00

i)Headroom Ceiling Plastering 9.36


5 11

ii)External Plastering 30.00 2.00


5 12/5/2022

iii) FF Internal wall plastering

5 8

iv)Staging for Extrnal Plastering 56.00

5 11 ii)External Plastering 50.00 2.00

6 12/6/2022 iii) FF Internal wall plastering

5 8

Page 69 of 100
Structure : Family Quarters-Director House
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work
INTERNAL WALL CEILING PLASTERING in EXTERNAL WALL DE-SHUTTERING IN
BRICKWORK in Cum STAGING in Sqm SHUTTERING IN SQM RCC IN CUM SCREED CONCRETE
PLASTERING in Sqm Sqm PLASTERING in Sqm SQM
S.No Date Mason Helper Carpender Fitter Helper Description of item
6 12/6/2022
Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned
5 8

iv) Extrnal Plastering 40.00

5 11 ii)External Plastering 50.00 2.00

7 12/7/2022 iii) FF Internal wall plastering

5 8

iv) Extrnal Plastering 40.00

65 116

28.72 - - - - - 260.00 - 336.00 - 6.00 - 18.00 - 12.00 - -

WORK DETAILS PER DAY


3 Mason
3 cum/Day
1 Brick work 8 Helper

5 Mason
2 Internal Plastering 60 Sqm/day
10 Helper
5 Mason
3 External Plastering 40 Sqm/day
10 Helper
4 Brick requirement from plant 3000 nos/day

Material balance
Date Description Available
Requirement required
1 Cement 200.000 BAG
Stock at site
2 Sand 50.000 CUM
3 Bricks 12924.000 NOS 3000 nos/day from Brickplant 12924

Page 70 of 100
SCREED CONCRETE

Executed REMARKS

Sand Shifting

Brick Shifting & Cement


Unloading-150nos

Sand Shifting

Brick wall Lining work

Brick Shifting

Sand Shifting

Brick wall Lining work

Brick Shifting

Sand Shifting

Brick wall Lining work

Brick Shifting

Sand Shifting

Brick wall Lining work

Brick Shifting

Sand Shifting

Brick wall Lining work

Page 71 of 100
SCREED CONCRETE

Executed REMARKS

Brick Shifting

Sand Shifting

Brick wall Lining work

Brick Shifting

Page 72 of 100
Structure : Family Quarters-Block-15
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work

BRICKWORK in Cum INTERNAL PLASTERING in Sqm EXTERNAL PLASTERING in Sqm STAGING in sqm SHUTTERING IN SQM RCC IN CUM
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed REMARKS

i) First floor Brick work upto Lintel


6 16 5.00

1 12/1/2022 ii) Head room slab concrete 2.00

1 1 iii) Firsfloor lintel sunshde work 6.00

i) First floor Brick work upto Lintel


6 16 5.00

2 12/2/2022 ii) Firsfloor lintel sunshde Concrete 1.00

1 1 iii) Firsfloor lintel sunshde work 6.00

i) First floor Brick work upto Lintel


6 16 6.00

3 12/3/2022 ii) Firsfloor lintel sunshde Concrete 1.00

1 1 iii) Firsfloor lintel sunshde work 8.00

i) First floor Brick work upto Lintel


6 10 4.00

ii) Firsfloor lintel sunshde Concrete 1.00


4 04-12-2022(Sunday)

iii) Brickwork above Lintel 2.00

1 5 v) Staging work for external Plastering 84.00

i) First floor Brick work upto Lintel


6 10 4.00

ii) Brickwork above Lintel 4.00


5 12/5/2022

iii) Internal Plastering Required Clearance from electrical

1 5 iv) Staging work for external Plastering 90.00

6 ii) Brickwork above Lintel 4.00

i) Internal Plastering
10
6 12/6/2022

ii) External Plastering 20.00

1 5 iii) Staging work for external Plastering 90.00

i) Internal Plastering
8 16
7 12/7/2022

Page 73 of 100
Structure : Family Quarters-Block-15
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work

BRICKWORK in Cum INTERNAL PLASTERING in Sqm EXTERNAL PLASTERING in Sqm STAGING in sqm SHUTTERING IN SQM RCC IN CUM
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed REMARKS
7 12/7/2022

ii) External Plastering 50.00

44 78 5 4 31 0

34 - - - 70.00 - 264.00 - 20.00 - 5.00 - -

WORK DETAILS PER DAY


3 Mason
3 cum/Day
1 Brick work 8 Helper

5 Mason
2 Internal Plastering 60 Sqm/day
10 Helper
5 Mason
3 External Plastering 40 Sqm/day
10 Helper

4 Tractar with trolly sand,cement& Bricks internal shifting at site

Material balance
Date Description Available
Requirement required
1 Cement 250.000 BAG
Stock at site
2 Sand 75.000 CUM
3 Bricks 15300.000 NOS 3000 nos/day from Brickplant 15300

Page 74 of 100
Structure : Family Quarters-Guest House
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work

BRICKWORK i
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned

i) GF-Brickwork upto Lintel


4 8 4 2 3.00
1 12/1/2022
ii) First floor slab-Beam bottom
shuttering

i) GF-Brickwork upto Lintel


4 8 4 2 2.00

2 12/2/2022
ii)GF- Ceiling Plastering

iii) First floor slab-Beam side


shuttering

i) GF-Brickwork upto Lintel


4 8 4 2 1.00

ii)GF- Ceiling Plastering


3 12/3/2022

Page 75 of 100
Structure : Family Quarters-Guest House
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work

BRICKWORK i
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned
3 12/3/2022

iii)GF- Lintel sunshade work

iv) First floor slab-shuttering

4 8 4 2 ii)GF- Ceiling Plastering

4 04-12-2022 (Sunday)
iii)GF- Lintel sunshade work

iv) First floor slab- shuttering

i) GF-Brickwork upto Lintel


4 8 4 2 2.00

ii)GF- Ceiling Plastering


5 12/5/2022

iv) GF-Lintel sunshade concrete

Page 76 of 100
Structure : Family Quarters-Guest House
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work
5 12/5/2022
BRICKWORK i
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned

iv) First floor slab-Beam Steel


making

i) GF-Brickwork Above Lintel


4 8 4 2 2.00

ii)GF- Ceiling Plastering


6 12/6/2022

iii)GF- Lintel sunshade Concrete

iv) First floor slab-Beam Steel


making

i) GF-Brickwork Above Lintel


4 8 4 2

7 12/7/2022
ii)GF- Lintel sunshade work

iii) First floor slab-Beam Steel


Fixing
28 56 16 12 14

Page 77 of 100
Structure : Family Quarters-Guest House
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work

BRICKWORK i
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned

10.00

WORK DETAILS PER DAY

Page 78 of 100
Structure : Family Quarters-Guest House
Work :Brickwork,Plastering, Shuttering ,reinforcement, concrete work

BRICKWORK i
S.No Date Mason Helper Carpender Fitter Helper Description of item
Planned

4 Nos
1 MT/Day
1 Barbending works 7 Nos

1 Nos
5 sqm/Day
2 Shuttering Works 1 Nos

3 Mason
3 cum/Day
3 Brick work 8 Helper

5 Mason
4 Internal Plastering 60 Sqm/day
10 Helper
5 Mason
5 External Plastering 40 Sqm/day
10 Helper

4 Tractar with trolly sand,cement& Bricks internal shifting at site

Material balance
Date Description Available
Requirement required
1 Cement 200.000 BAG
Stock at site
2 Sand 50.000 CUM
3 Bricks 4500.000 NOS 1000 nos/day from Brickplant 4500

Page 79 of 100
ICKWORK in Cum CEILING PLASTERING in Sqm PCC in Cum STEEL MAKING IN MT STEEL FIXING IN MT SHUTTERING IN SQM RCC IN CUM

Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

10.00

13.32

10.00

25.00

Page 80 of 100
ICKWORK in Cum CEILING PLASTERING in Sqm PCC in Cum STEEL MAKING IN MT STEEL FIXING IN MT SHUTTERING IN SQM RCC IN CUM

Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

4.00

15.00

13.00

6.00

25.00

12.00

2.00

Page 81 of 100
ICKWORK in Cum CEILING PLASTERING in Sqm PCC in Cum STEEL MAKING IN MT STEEL FIXING IN MT SHUTTERING IN SQM RCC IN CUM

Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

1.00

8.00

0.50

1.00

4.00

2.00

Page 82 of 100
ICKWORK in Cum CEILING PLASTERING in Sqm PCC in Cum STEEL MAKING IN MT STEEL FIXING IN MT SHUTTERING IN SQM RCC IN CUM

Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned Executed Planned

- 71.32 - - - - 2.00 2.00 - 74.00 - 2.50

Page 83 of 100
RCC IN CUM

Executed REMARKS

Page 84 of 100
RCC IN CUM

Executed REMARKS

Page 85 of 100
RCC IN CUM

Executed REMARKS

Page 86 of 100
RCC IN CUM

Executed REMARKS

Page 87 of 100
S.No Description Supervisor Painter Plumber Mason Carpenter Fitter Helper Total
1 Ash Pond-2B 0.00
2 Reservoir 0.00
3 Reservoir-Pump House 0.00
4 Coal shed 0.00
5 Coal Road 0.00
6 Ash water recovery structure 0.00
7 Inplant road 0.00
8 Road - Family quarters 0.00
9 Stacker Reclaimer 0.00
10 TG 0.00
11 Weigh Bridge 0.00
12 Admin Building 0.00
13 Family Quarters 0.00
14 Railway culvert 0.00
15 Store 0.00
16 Labour colony 0.00
Grand Total 0.00
Time Study
S.No Description Unit Capacity
1 Excavator Cum 0.80
2 Hywa Capacity Cum 11.50
Loading time of one excavator to
3 Hywa (10 Buckets) Mins 15.00
Leading from source to Ash
4 pond 2B Mins 25.00
Leading from source to
Reservoir Mins 15.00
Leading from source to Ash
Pond 01 Mins 20.00
5 No of Trips per Day
Ash Pond 2 B 8 to 9
Reservoir 10 to 11
Ash Pond 01 8 to 9
STRUCTURE NO'S START DATE COMPLETION DATE
DEPUTY MANAGER 1 10/1/2023 3/30/2024
SUPERVISOR
17 NO'S
QUARTERS
Phase 1 6 10/1/2023 3/30/2024
Phase 2 6 11/1/2023 4/30/2024
phase 3 5 11/15/2023 4/14/2024
ASH RECOVERY-SCHEDULE
S.No Description of work Duration Start Date Finish Date

RECOVERY WATER SUMP -112 cum (co77 days 15-08-2023 30-10-2023


BGL WORK 10 days 15-08-2023 24-08-2023
Excavation 0 to 3.4 Mtr 6 days 15-08-2023 22-08-2023
Dressing Work 1 day 23-08-2023 23-08-2023
PCC 1 day 24-08-2023 24-08-2023
FOOTING - RAFT WORK 8 days 14-09-2023 21-09-2023
Reinforcement work 4 days 14-09-2023 17-09-2023
Shuttering 3 days 18-09-2023 20-09-2023
Concrete 1 day 21-09-2023 21-09-2023
Deshuttering 1 day 22-09-2023 22-09-2023
LIFT 1 - 1.2MTR 10 days 27-09-2023 06-10-2023
Reinforcement work 4 days 27-09-2023 30-09-2023
Shuttering 4 days 01-10-2023 04-10-2023
Concrete 1 day 05-10-2023 05-10-2023
Deshuttering 1 day 06-10-2023 06-10-2023
LIFT 2 - 1.2MTR 6 days 07-10-2023 12-10-2023
Reinforcement work 2 days 07-10-2023 08-10-2023
Shuttering 2 days 09-10-2023 10-10-2023
Concrete 1 day 11-10-2023 11-10-2023
Deshuttering 1 day 12-10-2023 12-10-2023
LIFT 3 - 1.2MTR 6 days 13-10-2023 18-10-2023
Reinforcement work 2 days 13-10-2023 14-10-2023
Shuttering 2 days 15-10-2023 16-10-2023
Concrete 1 day 17-10-2023 17-10-2023
Deshuttering 1 day 18-10-2023 18-10-2023
LIFT 4 - 1.2MTR 5 days 19-10-2023 23-10-2023
Reinforcement work 1 day 19-10-2023 19-10-2023
Shuttering 2 days 20-10-2023 21-10-2023
Concrete 1 day 22-10-2023 22-10-2023
Deshuttering 1 day 23-10-2023 23-10-2023
LIFT 5 - 1.2MTR 4 days 23-10-2023 26-10-2023
Reinforcement work 2 days 23-10-2023 24-10-2023
Shuttering 3 days 23-10-2023 25-10-2023
Concrete 1 day 25-10-2023 25-10-2023
Deshuttering 1 day 26-10-2023 26-10-2023
WELL SLAB 4 days 27-10-2023 30-10-2023
Shuttering 1 day 27-10-2023 27-10-2023
Reinforcement work 1 day 28-10-2023 28-10-2023
Concrete 1 day 29-10-2023 29-10-2023
Deshuttering 1 day 30-10-2023 30-10-2023
Manpowe
Unit Required Qty
r details

Supervisor Nos -
Mason Nos -
Carpenter Nos 2.00
Fitter Nos 2.00
Helper Nos 2.00
Total Manpower Nos 6.00
Remarks

due to rain delay


due to rain delay
Completed
Completed
Completed

Completed
Completed
Completed
Completed

Completed
Completed
Completed
Completed

Work in progress
Available Qty Total Qty

1.00 1.00
1.00 1.00
1.00 3.00
1.00 4.00
5.00 6.00
9.00 15.00
ASH POND -2B DECANTING WELL-SCHEDULE
S.No Description of work Duration Start Date Finish Date

Decanting well - 92 cum (concr 76 days 16-08-2023 30-10-2023


BGL WORK 5 days 16-08-2023 20-08-2023
1 Excavation 0 to 1.6 Mtr 6 days 16-08-2023 17-08-2023
Dressing Work 3 days 17-08-2023 19-08-2023
PCC 1 day 20-08-2023 20-08-2023
2 FOOTING - RAFT WORK 11 days 25-08-2023 04-09-2023
Reinforcement work 5 days 25-08-2023 29-08-2023
Shuttering 5 days 30-08-2023 03-09-2023
Concrete 1 day 04-09-2023 04-09-2023
Deshuttering 1 day 05-09-2023 05-09-2023
3 LIFT 1 - .800MTR 12 days 06-09-2023 17-09-2023
Reinforcement work 5 days 06-09-2023 10-09-2023
Shuttering 5 days 11-09-2023 15-09-2023
Concrete 1 day 16-09-2023 16-09-2023
Deshuttering 1 day 17-09-2023 17-09-2023
4 LIFT 2 - Floor level (.250MTR) 12 days 18-09-2023 29-09-2023
Reinforcement work 5 days 18-09-2023 22-09-2023
Shuttering 5 days 23-09-2023 27-09-2023
Concrete 1 day 28-09-2023 28-09-2023
Deshuttering 1 day 29-09-2023 29-09-2023
5 LIFT 3 - 1.2MTR 11 days 30-09-2023 10-10-2023
Reinforcement work 5 days 30-09-2023 04-10-2023
Shuttering 4 days 05-10-2023 08-10-2023
Concrete 1 day 09-10-2023 09-10-2023
Deshuttering 1 day 10-10-2023 10-10-2023
6 LIFT 4 - 1.2MTR 4 days 11-10-2023 14-10-2023
Reinforcement work 1 day 11-10-2023 11-10-2023
Shuttering 1 day 12-10-2023 12-10-2023
Concrete 1 day 13-10-2023 13-10-2023
Deshuttering 1 day 14-10-2023 14-10-2023
7 LIFT 5 - 1.2MTR 5 days 15-10-2023 19-10-2023
Reinforcement work 1 day 15-10-2023 15-10-2023
Shuttering 2 days 16-10-2023 17-10-2023
Concrete 1 day 18-10-2023 18-10-2023
Deshuttering 1 day 19-10-2023 19-10-2023
8 LIFT 6 - 1.2MTR 6 days 20-10-2023 25-10-2023
Reinforcement work 2 days 20-10-2023 21-10-2023
Shuttering 2 days 22-10-2023 23-10-2023
Concrete 1 day 24-10-2023 24-10-2023
Deshuttering 1 day 25-10-2023 25-10-2023
9 DECANTING WELL SLAB 6 days 25-10-2023 30-10-2023
Shuttering 3 days 25-10-2023 27-10-2023
Reinforcement work 1 day 28-10-2023 28-10-2023
Concrete 1 day 29-10-2023 29-10-2023
Deshuttering 1 day 30-10-2023 30-10-2023

Manpowe
Unit Required Qty
r details

Supervisor Nos -
Mason Nos -
Carpenter Nos 2.00
Fitter Nos 1.00
Helper Nos 4.00
Total Manpower Nos 8.00
EDULE
Remarks

due to delay rain

Completed
Completed
Completed

Completed
Completed
Completed
Completed

Completed
Completed
Completed
Completed

Completed
Completed
Completed
Completed

Completed
work in progress
Available Qty Total Qty

1.00 1.00
1.00 1.00
1.00 3.00
2.00 3.00
3.00 7.00
8.00 15.00
22