Plan activities – December 2020 Progress to-date, 15-12-2020
Cluster A. Irrigation Modernization & Socio-
Economic: LARAP Survey for tertiary design (BGKn.1 - 7). Continue to collect data for the Master Plan Report. Carrying out IOL and SES socialization and survey activities for tertiary channels in the BGKn 1 - BGKn 6 area Coordination with stakeholders involved in irrigation institutions Conducting WUA institutional assessments Collecting data related to irrigation institutions Outreach to the public regarding the disaster management plan that will be carried out in Gumbasa Sub-District Conducting interviews with the community regarding disasters that often occur in Gumbasa Sub-District Reviewing the disaster emergency management plan document in Sigi Regency. Cluster B. Surveys and Investigations, schedule activities are: Note that for all surveys and investigations that need to be subcontracted under the provisional sums, the implementation will depend on approvals by the Client. Field Survey and Testing: Survey of Gumbasa Weir and the Gumbasa Irrigation area system Soil investigation test point for weir and canals Planning and Reports: Management planning for slopes and canals in the Sibalaya liquefaction area, Planning and stability analysis of the weir. Topographical Survey: Checking, site visit & measuring data processing: polygons, leveling and profiling Primary canal & Secondary canals of sub-con survey results. Field survey for the geological and hydrogeological aspects Preparing the hydrogeological and groundwater monitoring survey Field survey for selection of the dug wells and tube wells to be used for monitoring points of the groundwater monitoring networks Collecting hydrological data and supporting data from relevant agencies. Processing and validation of data for drainage module needs, reliable discharge updates, and irrigation water needs. Drainage Module calculation, update of reliable discharge and irrigation water needs. Water balance analysis and calculation. Cluster C. Design, BOQ and Tender Documents, schedule activities are: Main and Tertiary Network Design- Packages 1A and 2 Gumbasa weir design and structures of Package 2. Preparing the detailed design of Gumbasa Weir. Preparing the Unit Prices, Unit Price Analysis for Package 1A and Package 2. Preparing the draft Bidding Documents for Package 1A and Package 2. Cluster D. Safeguards schedule activities are: Finalise the Inception Report. Review the detailed Time Schedule of Environmental Impact studies Prepare a questionnaire form related to environmental impact studies Carry out data collection, survey and investigation related to environmental impact studies Review of Environmental Evaluation documents (DELH) Report and provide updates to the Client and ADB Prepare an initial Environmental Examination (IEE) for Packages 1A and 2 Finalise detailed time schedule of Environmental Biological and Chemical studies Prepare questionnaire related to environmental biological and chemical studies Coordinating with related agencies to find data and information for the preparation of LARP documents for the location of Packages 1A and 2