Name of work : SLTF 2020-21 Improvement works to Idimuzhikkal-Agrassal-Parakkadavu road reach I between
Km 3/000 and 4/500 in Vallikkunnu LAC
Sl.
Description of work No. Length Breadth Depth Qty
No.
d reach I between
Amount
1 12.1.B.1 Earth work in excavation of foundation of structures as per drawing and
technicalspecification, including setting out, construction of shoring and bracing,
removal of stumps andother deleterious matter, dressing of sides and bottom and
backfilling with approved material.<br>
Ordinary Soil - Depth upto 3m - Mechanical Means <br>
Total 35.511 m3
Say 35.511 m3 @ Rs 50.47 /m3
2
2.4.4.D Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete, wood
work, steel work, including T&P and scaffolding wherever necessary,
sorting the dismantled material, disposal of unserviceable material and
stacking the serviceable material with all lifts and lead of 1000 metres <br>
Dismantling Stone Masonry - Dry rubble masonry<br>
Total 0 m3
Say 0 m3 @ Rs 264.76 /m3
3
12.4 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone
aggregate 40 mm nominal size mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days.
Total 28.617 m3
Say 28.617 m3 @ Rs 5050.12 /m3
4
12.40 Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation
complete as per Drawing and Technical Specifications
Total 1.056 mt
Say 1.056 mt @ Rs 57215.25 /mt
Total 255.943 m3
Say 255.943 m3 @ Rs 5786.01 /m3
Total 0 m3
Say 0 m3 @ Rs 821.65 /m3
od17501/2020_2021 null Dry rubble without concrete levelling course masonry with
good
7 quality blasted rubble including packing to compactness to lines and levels cost and
conveyance of all materials labour charges etc. complete as per direction of
Departmental
officers at site (Derived from 60.7.1)
Total 30.297 m3
Say 30.297 m3 @ Rs 2204.08 /m3
od17503/2020_2021 null PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC
8 pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc.
complete.( Derived From 60.6
Total 41.4 m
Say 41.4 m @ Rs 98.26 /m
Total 0 no
Say 0 no @ Rs 67.07 /no
1792.24 60 2130.66
0 314.78 0
0 976.87 0
0 79.74 0
1758465 2090672
1824193 2231974
65728.4386 141301.5