You are on page 1of 1

EXHIBIT: S PAGE 2 OF 2

FINAL DIMENSIONAL REPORT


JOB NO. : INSPECTED BY :
DRAWING NO. : SERIAL NO. :

DATE OF INSPECTION : ITEM DESCRIPTION :

SKETCH REFER TO PAGE 1 OF 2

DRAWING
POST ACTUAL DEVIATION TOLERANCE ACCEPT REJECT REMARKS
DIMENSION
A 1900 -1900 ±4
B 2400 -2400 ±4
C 2400 -2400 ±4
D 2800 -2800 ±4
E 1720 -1720 ±4
F 470 -470 ±6.35
G 955 -955 ±6.35

PREPARED BY APPROVED BY

Signature : Signature :
Name : Name :
Position : QC INSPECTOR Position : QC MANAGER

Date : Date :

You might also like